Loading…
Loading…
Tender Value
₹13.3 L
EMD Value
₹27,000
Closing Date
6 Jun 2026, 4:00 pmDue tomorrow
AMC Muncipal Corporation Adityapur
Kalpanapuri, Adityapur
Constrction of RCC drain from 1. Pipal tree to in front of hariom tower munga tree 2. Ranusarkar to shekhar kumar samanta 3. Santosh Agarwal to arjun das in ward no 14 under AMC
2026_UDD_114631_1
UDD/AMC/02/2025-26 5TH CALL
Open Tender
Civil Works
120 days
Ward No. 14
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹27,000
Yes
29 May 2026
29 May 2026
8 Jun 2026
29 May 2026
6 Jun 2026
29 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for laying of different types and sizes of R.C.C. spun pipes with disposal of excavated earth within intial lead and lift as per specification and direction of E/I. (i) For classification of soil item -A.[3.3.1] | 149.69 | Per M3 | 239.74 | ₹35,886.68 |
| 2 | Providing course clean sand in filling in foundation tranches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building a specification and direction of E/I.[5.1.10] | 13.02 | Per M3 | 589.51 | ₹7,675.42 |
| 3 | Providing designation 75B one brick on flat soling joints filled with local sand including cost of watering taxes royality all complete as per buinidng specifiacation and direction of E/I.[5.6.3] | 162.75 | Per M2 | 330.34 | ₹53,762.84 |
| 4 | Providing RCC M-20 with nominal mix (1:1.5:3) in foundation & plinth with approved quality of stone…..do…do…direction of E/I. | 62.78 | Per M3 | 5,218 | ₹3,27,586.04 |
| 5 | Proving reinforcement for casting of rcc do……do……..[5.5.5(a)] | - | - | - | - |
| 6 | 8mm @ 0.395kg/m | 979.6 | Per Kg | 83.31 | ₹81,614.41 |
| 7 | 10mm @ 0.617kg/m | 2,677.78 | Per Kg | 82.1 | ₹2,19,836.47 |
| 8 | 12mm @ 0.890kg/m | 965.65 | Per Kg | 80.88 | ₹78,100.87 |
| 9 | providing suttering for casting wall and slab slab….. do……… do…. E/I.[5.3.17.1] | 534.75 | Per Kg | 372.72 | ₹1,99,312.02 |
| 10 | Earthwork in back filling the trench after laying different types and sizes of RCC spun pipes with earth during excation within initiallead & lifts as per specification & direction of E/I[5.1.7] | 27.9 | Per M3 | 93.93 | ₹2,620.65 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
terms_conditions1.pdf
Tender Documents • 1.06 MB
BOQ_154989.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid