| 1.00 | Earth work excavation in all soils with initial lead & lift etc. complete as per direction of departmental officers etc. completed. | 10 | m³ | 190 ₹1,900 | 181 ₹1,810 Lowest |
| 2.00 | Filling with gravel including watering and consolidation complete as per direction of departmental officers etc. | 6 | m³ | 580 ₹3,480 Lowest | 580 ₹3,480 Lowest |
| 3.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 5 | m³ | 5,590 ₹27,950 Lowest | 5,590 ₹27,950 Lowest |
| 4.00 | Supply and erecting shuttering including necessary supports for plane surfaces such as RCC column, footing,plinth beam, stair case etc., in all floors using mild steel sheets of 90cm X 60cm and 10 gauge stiffened with welded mild steel angle for boarding supported by casurina props at suitable intervals etc., completed complying with standard specification and as directed. | 10 | m² | 1,112 ₹11,120 Lowest | 1,112 ₹11,120 Lowest |
| 5.00 | Providing centering using M.S.Sheet sides and soffits for R.C.C column raising including all cost and conveyance etc complete | 17 | m² | 1,400 ₹23,800 | 1,304 ₹22,168 Lowest |
| 6.00 | Centering with MS sheet sides and supports for R.C.C Roof beams and slabs including all cost etc complete | 10 | m² | 1,300 ₹13,000 | 1,290 ₹12,900 Lowest |
| 7.00 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 6 | m³ | 9,373 ₹56,238 Lowest | 9,373 ₹56,238 Lowest |
| 8.00 | Supply and fabrication of R.T.S. rods in various dia including cutting bending placing in position and tying etc. | 9 | Qtl | 9,325 ₹83,925 | 9,321 ₹83,889 Lowest |
| 9.00 | Fly ash Brick work in CM 1:5 (one cement & five sand)using size 9"X4 3/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification (GF) | 5 | m³ | 6,840 ₹34,200 Lowest | 6,840 ₹34,200 Lowest |
| 10.00 | Plastering in Cement Mortar 1:5 mix 12mm thick | 20 | m² | 295 ₹5,900 | 292 ₹5,840 Lowest |
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
16 Jul 2025, 3:00 pmClosed
The Assistant Commissioner,
North Zone, Coimbatore Corporation, Balasundaram Road,Oppsite Womens Polytechnic
Construction of Compound wall and Arch at Corporation Middle School Shajahan Nagar in Ward No 10, North Zone
2025_MAWS_580196_4
E2/NorthZone/2025-26
Open Tender
Civil Works
Works
90 days
North Zone, Coimbatore Corporation
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹6,000
13 Oct 2026
11 Jul 2025
17 Jul 2025
11 Jul 2025
16 Jul 2025
11 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .