Tender Value
Refer Docs
EMD Value
₹10,210
Closing Date
1 Dec 2020, 2:00 pmClosed
SE/EEDC/Erode
948,E.V.N. Road, Erode-9.
Works Contract for road widening works at West Erode Sub division
2020_EB_185800_1
055/20-21 dt 21/11/2020
Open Tender
Electrical Works
Works
365 days
SE/EEDC/ERD
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,210
8 Apr 2021
21 Nov 2020
1 Dec 2020
21 Nov 2020
1 Dec 2020
21 Nov 2020
Amount
Excavation of Poe pit 9.0 M pole by using JCB or manual
Excavation of Poe pit 8.0 M pole by using JCB or manual
Excavation of Poe pit RSJ Rail pole 42 feet by using JCB or manual
Excavation of Stay Pit 4.5' to 5-0' by using JCB or manual
Erection of RCC/Metal poles up to 9.0 M pole.
Erection of RCC/Metal poles up to 8.0 M pole.
Erection of RCC/Metal poles more than 9.0 M pole.
Erection of Stay set complete
Fixing of V / Tapping and Guarding cross arm
Fixing of HT TI fitting
Fixing of 11 KV Disc
Fixing of 22KV Pin Insulator
Fixing of 3X arm
Fixing of Sph X arm
Fixing of LT Shackle
Fixing of LT Pin Insulator
Fixing of Alu Knob
Paving of conductor ACSR 7/4.09 MM
Paving of conductor ACSR 7/3.35 MM
Paving of conductor ACSR 7/2.59 MM
Erection of double pole TRANSFORMER STRUCTURE COMPLETE inclusive of following works -Excavation of pole pit sizing 3'x3'x6',Transporting of pole pit location 2 Nos, erection of pole 2Nos,Excavation of stay pit 4 Nos, erection stay 4set,Mass concreting (Jelly and sand supplied by contractor),Assembling of structure materials Top chennal 1set,Belting and angle and HG fuse angle, Erection of AB switch,Erection of HG fuse set complete, Structure earthing complete the pits and earth tubs and 3pipes complete,Feeding arrange with open type fuse unit,HT/LT LAS fixing and jumbering, Fixing of support insulator angle and erection 3Nos pin insulator, HT jumbering complete, painting of all clamps and other iron materials and painting of structure poles including paint brushes sundries etc,LTbus bar arrangements, Fixing of danger board,erection of transformer
Dismantling of double pole TRANSFORMER STRUCTURE COMPLETE inclusive of following works -dismantling of pole pit sizing 3'x3'x6',Transporting of pole pit location 2 Nos,dismantlingof pole 2Nos,dismantling of stay pit 4 Nos, erection stay 4set,dismantlingof structure materials Top chennal 1set,Belting and angle and HG fuse angle, dismantling of AB switch,Erection of HG fuse set complete, Structure earthing complete the pits and earth tubs and 3pipes complete,Feeding arrange with open type fuse unit,HT/LT LAS fixing and jumbering,dismantling of support insulator angle and erection 3Nos pin insulator, HT jumbering complete, ,LTbus bar arrangements, dismantling of danger board,erection of transformer.
Erection for double pole structure D.P)complete with following works -Excavation of pole pit sizing 2'x2'x6',erection of poles, erection of base plate,erection of structure materials, erection of AB switch and HG fuse, Structure earthing complete, (Excluding pole concrete ), erection of metering set, HT LAS fixing and LAS earthing through PVC pipe 0.5",erection of stay set complete, jumpering, erection of support angles and insulators if any, alteration of materials in lathe works if any, provision of danger board, 3nos earth pits including erection of cement collar,painting of metal parts,(all T&P such as crowbars,silling, Dshackle etc that must be brought by the contractor)
Dismantling of double pole structure D.P)complete with following works -dismantling of pole pit sizing 2'x2'x6',dismantling of poles, dismantling of base plate,dismantling of structure materials, dismantling of AB switch and HG fuse, Structure earthing complete, (Excluding pole concrete ), dismantling of metering set, HT LAS fixing and LAS earthing through PVC pipe 0.5",dismantling of stay set complete, jumpering, erection of support angles and insulators if any, alteration of materials in lathe works if any, provision of danger board, 3nos earth pits including erection of cement collar,painting of metal parts,(all T&P such as crowbars,silling, Dshackle etc that must be brought by the contractor)
Released & Refixing of S ph SC cable
Released & Refixing of 3 ph SC cable
Erection of LT S-N Gaurding
Pole Earthing
Loading of Poles 9.0 M/ RSJ Pole
Unloading Poles 9.0 M/ RSJ Pole
Loading of Poles 8.0 M
Unloading Poles 8.0 M
Transporting of poles from road side to pole pit including loading unloading of poles by using JCB or manual upto 200 m
Released & Refixing of Street light fittings
Released & Refixing of Street light Switches
HT/LT line Resagging with ACSR 7/4.09 mm conductor
HT/LT line Resagging with ACSR 7/3.35 mm conductor
HT/LT line Resagging with ACSR 7/2.59 mm conductor
Releasing of Grills
Dismantling of 9.0 M pole
Dismantling of 8.0 M/ 7.5 M pole
Dismantling of V - Cross arm / Tapping cross arm
Dismantling of HT Ti fitting
Dismantling of 11 KV Disc
Dismantling of 22KV Pin Insulator
Dismantling of 3X arm
Dismantling of Sph X arm
Dismantling of LT Shackle
Dismantling of LT Pin Insulator
Dismantling of Alu Knob
Dismantling of Stay set
Dismantling ACSR 7/4.09
Dismantling ACSR 7/3.35
Dismantling ACSR 7/2.59
Transporting of Materials
BRIGHT ELECTRICALS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .