Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.9 LAccepted-AOC AT KAMAKHYANAGAR P O KAMAKHYANAGAR DIST DHENKANAL ODISHA | KAMAKHYANAGAR | DHENKANAL | ODISHA | L1 | Accepted-AOC Awarded for the said Project | |
| 2 | L2₹20.3 L+₹41,785 (2.10%)Rejected-Finance | L2 | Rejected-Finance L2 BIDDER | |
| 3 | Rejected-Technical | - | Rejected-Technical Due to Non submission of EMD and Paper Cost |
Tender Value
₹19.9 L
EMD Value
₹19,897
Closing Date
14 May 2026, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO loisingha
PANCHAYAT SAMITI LOISINGHA
REPAIR AND RENOVATION OF KGBV GIRLS HOSTEL (OLD) BUILDING AT LOISINGHA UPS
2026_PRBLO_128533_7
1/26-27/LSNG
Open Tender
Civil Works - Buildings
Percentage
150 days
loisingha
PLEASE REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹6,000
LOISINGHA
₹19,897
10 Jun 2026
30 Apr 2026
15 May 2026
30 Apr 2026
14 May 2026
30 Apr 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick or stone masonry in lime or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Lead. | 0.6 | Cum | 900.68 | ₹540.41 |
| 2 | Dismantling and removing 2.5 cm. thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead.
(i) Ground Floor | 200.98 | Sqm | 115.4 | ₹23,193.09 |
| 3 | Dismantling and removing 2.5 cm. thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead.
(i) 1st Floor | 202.03 | Sqm | 121.17 | ₹24,479.98 |
| 4 | Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead etc complete.
(i) Ground Floor | 93.18 | Sqm | 57.7 | ₹5,376.49 |
| 5 | Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead etc complete.
(i) 1st Floor | 86.86 | Sqm | 60.59 | ₹5,262.85 |
| 6 | Earth work in excavation of foundation trenches in ordinary soil except sheet rock and boulders (requiring blasting) including dressing and leveling the bed upto the required depth and depositing the excavated materials away form the site with all leads and lifts. T & P shoring and shuttering if required etc. complete as directed by engineer- in charge. | 10.19 | Cum | 276.89 | ₹2,821.51 |
| 7 | Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. | 6.79 | Cum | 545.16 | ₹3,701.64 |
| 8 | Providing & laying plain cement concrete 1:4:8 ( 1 cement 4 coarse and 8 graded stone aggregate fo 40 mm nominal size) in foundation and pinth including cost of hoisting, lowering laying concrete, ramming , watering and curing etc. complete to required levels laid in layers not exceeding 15cm thick including cost. Conveyance, loading and unloading, royalties and taxes all materials and cost of all labours, sundnes, T & P required for the work complete including dewatering if required as per instruction of Engineer-in- charge. | 6.58 | Cum | 5,081.43 | ₹33,435.81 |
| 9 | CC (1:2:4) using 12 mm size chips including cost of all materials and labour etc. complete. | 2.31 | Cum | 7,040.43 | ₹16,263.39 |
| 10 | Fly ash brick masonay In Cement Mortar (1:6) In Superstructure Including Cost.Conveyance, Loading And Unloading, Royalties And Taxes All Materials And Cost Of All Labours, Sundnes, T & P Required For The Work Complete Including Dewatering If Required As per Instruction Of Engineer-In¬Charge.
(i) Ground Floor | 1.84 | Cum | 5,562.12 | ₹10,234.3 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_589038.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
BOQ_589038.xls
BOQ • 0.38 MB
KGBV.pdf
Tender Documents • 17.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .