Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹5.0 L+₹3,558 (0.71%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹5.2 L+₹17,641.75 (3.53%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹5.2 L+₹18,531.25 (3.70%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹5.3 L+₹31,132.50 (6.22%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹7.4 L
EMD Value
₹14,820
Closing Date
15 May 2026, 4:00 pmClosed
Executive Engineer RnB Division
SUMBAL SONAWARI
Construction of Elementary Boundary Wall at Govt Middle School Tularzoo.
2026_PWDJK_309544_2
NIT NO 10 OF 2026-27 SUMBAL DIVISION
Open Tender
Civil Works
Percentage
30 days
SUMBAL SONAWARI
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Executive Engineer RnB Division
₹14,820
19 May 2026
8 May 2026
16 May 2026
8 May 2026
15 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydrualic excvator) in foundation, trenches , drains (Exceedind 30cm in depth , 1.5 m width as well as 10 sqm in plan , Incl. disposal of excavated soil lead up 50 m | 17.01 | Cum | 256.85 | ₹4,369.02 |
| 2 | Providing and laying stone soling hand packed . Incl. carraiage complete. | 3.78 | Cum | 1,000 | ₹3,780 |
| 3 | Cast in situ Conc. with nominal mix M-7.5 grade with 20mm nominal size agg | 2.88 | Cum | 5,202.9 | ₹14,984.35 |
| 4 | Cast in situ Conc. with nominal mix M-10 grade with 20mm nominal size agg. | 36.86 | Cum | 5,733 | ₹2,11,318.38 |
| 5 | Providing and laying in position reinforced cement concrete 1:2:4 mix ratio M15 using 40 mm nominal size agg excluding cost of shuttering i/c curing( all works upto lintel level) | 5.67 | cum | 7,104.35 | ₹40,281.66 |
| 6 | Reinforcement for RCC work incl cutting bending ,binding placing in position complete job. | 2.27 | qtl | 12,320 | ₹27,966.4 |
| 7 | FormWork/ Shuttering i/c propping, centering and removal. Complete job. | 126 | sqm | 286.35 | ₹36,080.1 |
| 8 | Brick work with common burnt clay of class designated 7.5 in foundation and plinth incl. curing complete in cement mortor 1:4 mix incl carriage from budgam | 26.38 | cum | 9,062.2 | ₹2,39,060.84 |
| 9 | Providing and laying Cement concrete in M15 excl. carraiage complete. | 1.04 | Cum | 6,945 | ₹7,222.8 |
| 10 | 12 mm thick cement sand plaster in 1:6 mix | 325.08 | sqm | 266.35 | ₹86,585.06 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_1002015.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .