Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Fee/PreQual/Technical/Finance | -0.01% | ₹1.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.5 L+₹2,247.93 (1.51%)Admitted-Fee/PreQual/Technical/Finance | +1.50% | ₹1.5 L+₹2,247.93 (1.51%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.5 L
EMD Value
₹4,464
Closing Date
28 Jul 2026, 3:00 pmClosed
Executive Eng REW Kupwara
Executive Eng REW Kupwara
C/O Wazu khana at Jamia Masjid with Truss at Herri B
2026_RDPR_315747_21
NIT NO 51 OF 2026-27 ADF QADERABAD
Open Tender
Civil Works
Percentage
Executive Eng REW Kupwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Eng REW Kupwara
₹4,464
17 Aug 2026
14 Jul 2026
29 Jul 2026
14 Jul 2026
28 Jul 2026
14 Jul 2026
14 Jul 2026 - 14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site clearance by the way of engagement of labors including cutting of shrubs | 1 | Labour | 553 | ₹553 |
| 2 | Eartwork by manual means including disposal of excavated material. | 1 | N | 0.01 | ₹0.01 |
| 3 | Providing and laying of stone soling of tightly hand packed by tamping | 0.66 | Cum | 900 | ₹594 |
| 4 | Providing and laying cement concrete of specified grade excluding the cost of centering & shuttering using M10 mix. (1:3:6) and by using 20 mm down aggregates. | 5.84 | Cum | 5,733.6 | ₹33,484.22 |
| 5 | 20% plumb | 0.71 | Cum | 900 | ₹639 |
| 6 | Placing and fixing of ordinary timber planks of wood for shuttering. | 12.65 | sqm | 286.35 | ₹3,622.33 |
| 7 | Masonry work with Klin Bricks in super structure above plinth level inCement mortar 1:6 including Laying and supply of bricks | 3.39 | Cum | 7,571.5 | ₹25,667.39 |
| 8 | 12 mm thick cement plaster in 1:4 mix of mortor | 11.76 | sqm | 266.2 | ₹3,130.51 |
| 9 | P/Fixing of Tiles of standard quality | 26.95 | sqm | 1,107.65 | ₹29,851.17 |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs
having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.11 | Cum | 9,821.85 | ₹10,902.25 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_1025922.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .