Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.9 CrAccepted-AOC | ₹1.9 Cr Quoted ₹19.9 Cr | 1 | Accepted-AOC DUE TO LOW RATES |
| 2 | 2₹21.8 CrRejected-Finance F 31 INDUSTRIAL AREA PHASE VIII SAS NAGAR MOHALI 160071 | S A S NAGAR | PUNJAB | 160071 | ₹21.8 Cr | 2 | Rejected-Finance DUE TO LOW RATES |
Tender Value
₹20.0 Cr
EMD Value
₹30.0 L
Closing Date
1 Oct 2020, 4:00 pmClosed
Executive Engineer Project P.H Division No. 7
Sector 11B, Chandigar
Design, Built and Operation of 2 MLD Sewage Treatment Plant Using MBR Technology to fill Sukhna Lake Near Village Kishangarh, U.T., Chandigarh including operation and maintenance of 10 years (after six months of trail run and one year defect liabilit
2020_CHD_56648_1
PH7/2020/1997
Open Tender
Public Health Products
240 days
Chandigarh
Please refer to tender docs
3 documents required · 3 mandatory
₹0
₹30.0 L
25 Jan 2021
8 Sept 2020
1 Oct 2020
8 Sept 2020
1 Oct 2020
8 Sept 2020
Amount
A- 1 DESIGN COST
Survey(s), Soil- Investigation(s), Flow Measurement(s), Sampling & Analysis, etc.
Detailed Design Engineering
Documents comprising Technical, Drawings, Manuals, etc.
if any, for successful running & commissioning of Plant(s)
A-2 WORKS COST
Civil
Electrical
Mechanical
Instrumentation & SCADA
A-3 OPERATION & MAINTENANCE COST FOR 10 YEARS AND DEFECTS LIABILITY PERIOD FOR 1 YEAR a) Manpower for O&M, Administration & Management including Security of plant sites, running office, laboratory b) Maintenance of all utility building & facility, maintenance of green belt plantation including training etc. c) Civil works repair & maintenance including preventive maintenance. d) Electro-mechanical works repair & maintenance including normal & routine maintenance, refurbishment of spare parts, general utilities etc. e) Reserve fund for major maintenance &repairs.
for Defects Liability Period (DLP) = NIL
for O&M during Year - 1
for O&M during Year - 2
for O&M during Year - 3
for O&M during Year - 4
for O&M during Year - 5
for O&M during Year - 6
for O&M during Year - 7
for O&M during Year - 8
for O&M during Year - 9
for O&M during Year - 10
Variable Part: (This part shall include the Cost of chemicals and fuel for Power backup).
for O&M during Year - 1
for O&M during Year - 2
for O&M during Year - 3
for O&M during Year - 4
for O&M during Year - 5
for O&M during Year - 6
for O&M during Year - 7
for O&M during Year - 8
for O&M during Year - 9
for O&M during Year - 10
Hydrotech Paryavaran India Pvt. Ltd.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid