| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.7 L+₹25,050.19 (7.26%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹3.8 L+₹30,000.22 (8.70%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹4.5 L+₹1.1 L (30.4%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹4.5 L+₹1.1 L (30.7%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
24 Aug 2026, 6:00 pmClosed
Er. Sanjeev Sharma
XEN PWD Akhnoor
BOQ
2026_PWDJK_317854_20
e-NIT No. 34 of 2026-27 Dated 22-07-2026
Open Tender
Civil Works
Percentage
30 days
Akhnoor
NIT
2 documents required · 2 mandatory
₹600
XEN PWD Akhnoor
₹10,000
7 Sept 2026
27 Jul 2026
25 Aug 2026
27 Jul 2026
24 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by MECHANICAL means in trenches for foundation,drains, pipes,cables etc(not exceeding 1.5 mt in width)and for shafts,wells cesspits and the like not exceeding 10sqm on plan depth up to 1.5mt including disposal of excavated earth up to 1 mt from cutting edge disposed earth to be levelled and neatly dressed. All kinds of soils . | 18.35 | Cum | 256.85 | ₹4,713.2 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All works up to plinth level in M-7.5(1:5:10) grade, with 40mm nominal size of aggregates. Crushed | 2.26 | CUM | 5,202.9 | ₹11,758.55 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering. shuttering, finishing and reinforcement-All work upto plinth level 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20mm nominal size) | 6.51 | Cum | 7,788.4 | ₹50,702.48 |
| 4 | "Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutmen""ts, posts ans sturts, etc. upto floor five level excluding cost of centring, shuttering, fmishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size)" | 5.58 | Cum | 9,395.7 | ₹52,428.01 |
| 5 | Providing and laying in position cement concrete of specified grade of reinforced cement concrete, excluding the cost of centering and shuttering. in 1:1.5:3 (1 cement:1.5 coarse sand: 3 graded stone aggreate 20mm nominal size in suspended floors, balconies,landings and staircase having upto 15 degree slope excluding cost of centering and shuttering.All work upto floor V level. | 6.07 | Cum | 9,821.85 | ₹59,618.63 |
| 6 | Reinforcement for RCC work including straightening cutting,bending,placing in position & binding all complete with TMT bars. | 1,825 | KG | 123.2 | ₹2,24,840 |
| 7 | Suspended floors, roofs, landings, balconies and access platforms. | 23.75 | sqm | 718.2 | ₹17,057.25 |
| 8 | Lintel, beams, plinth beams, girders, bressumers and cantilevers. | 35.97 | sqm | 577.55 | ₹20,774.47 |
| 9 | Columns, pillars, piers, abutments, posts and struts. | 65.06 | sqm | 742.55 | ₹48,310.3 |
| 10 | Sand and Aggregates by MT 10 Kms | 28.45 | cum | 344.49 | ₹9,800.74 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_1044556.xls
BOQ • 0.23 MB
Scan.pdf
PDF • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .