| 1 | L1₹10.9 LAccepted-AOC | ₹10.9 L | L1 | Accepted-AOC Lowest Amount Quoted |
| 2 | L2₹11.1 LRejected-Finance | ₹11.1 L | L2 | Rejected-Finance Highest Amount Quoted |
| Sl No | Description | Qty | Unit | PETCHIAMMAL L2 | MS.P B S CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS. | 22.98 | Cum | 350 ₹8,043 | 340 ₹7,813.2 Lowest |
| 2.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 179.53 | Cum | 2,400 ₹4,30,872 | 2,395 ₹4,29,974.35 Lowest |
| 3.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 1,436.25 | Sqm | 90 ₹1,29,262.5 | 87 ₹1,24,953.75 Lowest |
| 4.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 1,436.25 | Sqm | 30 ₹43,087.5 | 20.4 ₹29,299.5 Lowest |
| 5.00 | BITUMINOUS CONCRETE 30 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 43.09 | Cum | 11,500 ₹4,95,535 | 11,452 ₹4,93,466.68 Lowest |
| 6.00 | Provision for HM stones | 2 | Nos | 600 ₹1,200 | 574 ₹1,148 Lowest |
| 7.00 | Provision for KM stones | 1 | Nos | - | - |
Tender Value
₹13 L
EMD Value
₹13,000
Closing Date
25 Feb 2026, 3:00 pmClosed
BDO (B.Pt.)
Panchayat Union, Manur.
BT Road
2026_RDTN_656278_1
A2/5647/2025
Open Tender
Civil Works - Roads
Item Wise
180 days
Manur
Refer tender doc
2 documents required · 2 mandatory
₹0
₹13,000
11 Jul 2026
12 Feb 2026
26 Feb 2026
12 Feb 2026
25 Feb 2026
12 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS. | 22.98 | Cum | - | - |
| 2 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 179.53 | Cum | - | - |
| 3 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 1,436.25 | Sqm | - | - |
| 4 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 1,436.25 | Sqm | - | - |
| 5 | BITUMINOUS CONCRETE 30 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 43.09 | Cum | - | - |
| 6 | Provision for HM stones | 2 | Nos | - | - |
| 7 | Provision for KM stones | 1 | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_786966.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].