| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹24,500Accepted-AOC | 1 | Accepted-AOC work awarded |
Tender Value
Refer Docs
EMD Value
₹2,450
Closing Date
1 May 2025, 2:00 pmClosed
Executive Engineer
EXECUTIVE ENGINEER/TANGEDCO / DISTRIBUTION, TENKASI
Execution of contract towards Extension of supply works for street light at various location in Town Surandai area in Town Surandai section Surandai Sub division of Tenkasi Division
2025_EB_548497_1
EE/D/TSI/ET-002/25-26
Open Tender
Electrical and Maintenance Works
Works
90 days
Tenkasi
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2,450
Yes
23 May 2025
19 Apr 2025
2 May 2025
19 Apr 2025
1 May 2025
19 Apr 2025
Amount
Normal ground Excavation of pole pit (1.25m * 0.5m*1.5m) 7.32m, 7.5m, 8m, 8.23m Poles
Normal Ground Erection of 7.32m, 7.5m, 8m, 8.23m Poles
Rocky ground Excavation of pole pit (1.25m * 0.5m*1.5m) 7.32m, 7.5m, 8m, 8.23m Poles
Rocky ground Erection of 7.32m, 7.5m, 8m, 8.23m Poles
Normal Ground Excavation of pole pit (1.25m * 0.6m*1.83m) 9m, 9.14m Poles
Normal Ground Erection of 9m, 9.14m Poles
Normal Ground of erection of 36" RSJ pole
Rocky Ground of Excavation of pole pit (1.25m * 0.6m*1.83m) 9m, 9.14m Poles
Rocky Ground of Erection of 9m, 9.14m Poles
Rocky Ground of Excavation of pole pits (1.25m*0.6m*1.83m) for RSJ pole 36"
Rocky Ground of erection of 36" RSJ pole
Transporting of poles from road side to pole pit -7.32m, 7.5m, 8m, 8.23m Poles
Transporting of poles from road side to pole pit -9m,9.14m RCC/PSC pole
Loading and Unloading of Poles-7.32m, 7.5m, 8m, 8.23m Poles
Loading and Unloading of Poles-9m,9.14m RCC/PSC pole
Loading Unloading of line materials
Concreting of pole as per Board Standards (2'*2'*5'). The material such as sand, jelly, etc., have to be supplied by the contractor. Cement supplied by contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.compleat.
Coil earthing per pole & pole earthing
Normal Ground-Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for Stay Set)
Normal Ground -Erection of Stay Set
Fixing of V & Channel Cross Arm 3.5' including transporting of materials from road side to site
Fixing of 3 phase Cross Arm including transporting of materials from road side to site
Fixing of 1 phase Cross Arm including transporting of materials from road side to site
Fixing of HT LT TI Fitting including transporting of materials from road side to site
Fixing of insulator (per location) including transporting of materials from road side to site
LT lines Stringing , Sagging, binding including transporting of materials from road side to site for-7/2.59 ACSR (1 Span/wire)
For LT line clear works for 7/2.59 ACSR (1 Span/wire)
Alteration of clamps
Drilling less than 23 mm holes per hole/slatted hole
LT-Changing of pin point to cut point
Erection of CFL lamp
Erection street light switch box
Providing jumpering at cut point
Hiring of crane
Exceeding 1 hour for every Hour
Transporting of charges of DT/line materials using private vehicle upto 20 KM(up and Down)
Beyond 20 KM for every KM
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .