Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹15,892
Closing Date
12 Jan 2021, 5:30 pmClosed
Executive Engineer, LPWD Kavaratti
Executive Engineer, LPWD Kavaratti
Construction of Water Supply Posts with Platforms at Agatti
2021_UTL_1400_1
NIT No.55/NIT/EE Kvt/2020-21
Open Tender
Civil Works
Item Rate
30 days
Agatti
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
Executive Engineer, LPWD Kavaratti
₹15,892
20 Jan 2021
7 Jan 2021
13 Jan 2021
7 Jan 2021
12 Jan 2021
7 Jan 2021
Amount
Surface Dressing of the ground including removing vegitation and in equalities not exceeding 15 cmdeep and disposal of rubbish lead up to 50 mtrs and lift up to 1.5 Mtrs
Earth work excavation in foundation trenches or drains not exceeding 1.5 metre in width or 10sqm on plan including dressing of sides and ramming of bottoms lift up to 1.5 metre including getting out the excavated and disposal of surplus excavated soil as directed with in a lead of 50 metre
Providing and laying cement concrete 1:4:8 (1cement,4M.Sand,8G.chipps) foundation and plinth.
Reinforced cement concrete work in beams, Suspended floors ,roofs,having slope up to 15 degree landings, shelves chajjas, lintels ,bands,plain window sills,staircase and spiral stair case up to floor five level excluding cost of centering and shuttering finishing and reinforcement.with 1:1.5:3 ( 1 cemet :1.5 M sand:3 graded stone aggregate 20 mm nominal size )
Cold twisted steel reinforcement for R.C.C. work including bending, binding and placing in position complete.
Centring and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform.
12mm cement plaster 1:6 (1cement :6 metal sand)
Finishing wall with Arcylic smooth exterior paint of required shade on new work (two or more coats applied @1.67ltr/10 sqm) over including priming coat of exterior primer applied @ 2.20 kg/10 sqm
ABDUL GAFOOR
bazil ali
MOHAMMED KOYA P V
Akbarali D N
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .