Tender Value
₹43.1 L
EMD Value
₹1.3 L
Closing Date
26 Oct 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
CE
Ghaziabad Nagar Nigam
Work of drain and interlocking tiles from Jagpat house to Baniya Wali Haveli in Ward 42 Bamheta.
2026_DOLBU_1194229_72
133/Nirman/2026-27 Date 28.09.2026
Open Tender
Civil Works
Percentage
CE
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,050
₹1.3 L
8 Oct 2026
8 Oct 2026
26 Oct 2026
8 Oct 2026
26 Oct 2026
8 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dimantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in- charge within a distance of 60 meter (200 feet).PWD SOR 2022 17.2.2 | 4.73 | CUM | 600 | ₹2,840.73 |
| 2 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. DSR 2021 | 820.35 | SQM | 100.45 | ₹82,404.16 |
| 3 | S/L P:C:C (1:6:12) with 40 mm gauge brick ballast ,fine sand of 1.25 f.m and cement in foundation and under floor including all materials, labour, tools, & plant etc all completed as per the direction of engineer - in - charge.{ AS PER PWD SOR 2022 PAGE NO 18 SI NO 5.01 ITEM NO 273 } | 37.19 | CUM | 4,000 | ₹1,48,756.8 |
| 4 | R.C.C work with cement ,approved coarse sand & 2cm gauge approved stone grit in proportions of 1:1.5:3 in lintels of doors &windows excluding supply of reinforcement and its bending ,but including its fixing and binding wire including necessary cantering and shuttering etc .and supply of all materials,labour,tools& plants etc. required for proper completion of the work including cost of binding wire. the rate excludes making of drip course which shall be paid extra etc all complete as per direction of engineer in charge.(AS PER PWD SOR 2020/283 a .) | 100.44 | SQM | 8,640 | ₹8,67,818.88 |
| 5 | Steel reinforcement for R.C.C work including straightening ,cutting ,bending,placing in position and binding all complete upto plinth level mild steel and medium tensile steel bars DSR 2023 ITEM N.5.22.1 | 64.18 | JOB | 8,166 | ₹5,24,065.92 |
| 6 | S/L of stone ballast 22.4 to 53 mm size with stacking for measurment etc all complete as per the direction of engineer in-charge . AS PER PWD SOR 2020 RMR | 124.42 | CUM | 2,151.2 | ₹2,67,651.77 |
| 7 | Supply of screening material with stacking for measurment etc all complete as per the direction of engineer in-charge .AS PER PWD SOR 2020 RMR | 22.4 | CUM | 2,050.2 | ₹45,915.37 |
| 8 | Consolidation of stone aggregates of 45-63 mm/22.4-53mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2/3 as per Technical Specification Clause 405. AS PER PWD SOR 2022 20.2.1 | 124.42 | CUM | 690 | ₹85,849.63 |
| 9 | Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30(Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine.Technical Specification Clause
1501. | 205.09 | SQM | 8,050 | ₹16,50,954.37 |
| 10 | OLD TILES | 3,714.5 | SQM | -6 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.44 MB
BOQ_2254471.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .