Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-Finance | ₹1.5 Cr | L1 | Accepted-Finance Found in order |
| 2 | L1₹1.5 CrAccepted-Finance NO 2 MURAHARI STREET SARATHY NAGAR WEST JONES ROAD WEST SAIDAPET CHENNAI 600015 | CHENNAI | CHENNAI | TAMIL NADU | 600015 | ₹1.5 Cr | L1 | Accepted-Finance Found in order |
| 3 | L1₹1.5 CrAccepted-Finance | ₹1.5 Cr | L1 | Accepted-Finance Found in order |
| 4 | L1₹1.5 CrAccepted-Finance | ₹1.5 Cr | L1 | Accepted-Finance Found in order |
| 5 | L1₹1.5 CrAccepted-Finance | ₹1.5 Cr | L1 | Accepted-Finance Found in order |
Tender Value
₹10 Cr
EMD Value
₹10 L
Closing Date
10 Sept 2024, 3:30 pmClosed
CE/TP-I/GUindy
A10 Thiru vi ka Indl Estate Guindy Chennai 32
Repairing and reconditioning of 110kV class sick power transformers include for site inspection, transport, repairing of 110kV class power transformers at various places in Transmission Projects-I Chennai Region jurisdiction, testing, packing forward
2024_EB_473665_2
TP1-14/2024-25
Open Tender
Electrical Works
Item Rate
365 days
chennai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10 L
Yes
2 Jan 2025
5 Sept 2024
11 Sept 2024
5 Sept 2024
10 Sept 2024
5 Sept 2024
ABSTRACT
Supply of materials & Labour Charges for 10 MVA Power Transformer
Supply of materials & Labour Charges for 16 MVA Power Transformer
Supply of materials & Labour Charges for 25 MVA Power Transformer
Supply of materials & Labour Charges for 50 MVA Power Transformer
Ascott Electricals Pvt Ltd (BID ID -1132445)
ABIRAMI ENGINEERING (BID ID -1132882)
VENKATESWARA ELECTRICAL INDUSTRIES PRIVATE LIMITED (BID ID -1130942)
ASIA POWER ELECTRICAL PVT LTD (BID ID -1130835)
SHREE ABIRAMI ENGGINEERING WORKS PRIVATE LIMITED (BID ID -1130062)
SAP INDUSTRIES (BID ID -1132142)
ASIA POWER ELECTRICAL PVT LTD (BID ID -1130835)
VENKATESWARA ELECTRICAL INDUSTRIES PRIVATE LIMITED (BID ID -1130942)
ABIRAMI ENGINEERING (BID ID -1132882)
SHREE ABIRAMI ENGGINEERING WORKS PRIVATE LIMITED (BID ID -1130062)
SHREE ABIRAMI ENGGINEERING WORKS PRIVATE LIMITED (BID ID -1130062)
ABIRAMI ENGINEERING (BID ID -1132882)
VENKATESWARA ELECTRICAL INDUSTRIES PRIVATE LIMITED (BID ID -1130942)
SAP INDUSTRIES (BID ID -1132142)
Ascott Electricals Pvt Ltd (BID ID -1132445)
SAP INDUSTRIES (BID ID -1132142)
SHREE ABIRAMI ENGGINEERING WORKS PRIVATE LIMITED (BID ID -1130062)
VENKATESWARA ELECTRICAL INDUSTRIES PRIVATE LIMITED (BID ID -1130942)
ASIA POWER ELECTRICAL PVT LTD (BID ID -1130835)
ABIRAMI ENGINEERING (BID ID -1132882)
Ascott Electricals Pvt Ltd (BID ID -1132445)
VENKATESWARA ELECTRICAL INDUSTRIES PRIVATE LIMITED (BID ID -1130942)
ABIRAMI ENGINEERING (BID ID -1132882)
SHREE ABIRAMI ENGGINEERING WORKS PRIVATE LIMITED (BID ID -1130062)
ASIA POWER ELECTRICAL PVT LTD (BID ID -1130835)
SHREE ABIRAMI ENGGINEERING WORKS PRIVATE LIMITED (BID ID -1130062)
Ascott Electricals Pvt Ltd (BID ID -1132445)
ABIRAMI ENGINEERING (BID ID -1132882)
SAP INDUSTRIES (BID ID -1132142)
VENKATESWARA ELECTRICAL INDUSTRIES PRIVATE LIMITED (BID ID -1130942)
Ascott Electricals Pvt Ltd (BID ID -1132445)
SHREE ABIRAMI ENGGINEERING WORKS PRIVATE LIMITED (BID ID -1130062)
ABIRAMI ENGINEERING (BID ID -1132882)
SAP INDUSTRIES (BID ID -1132142)
ASIA POWER ELECTRICAL PVT LTD (BID ID -1130835)
SAP INDUSTRIES (BID ID -1132142)
SHREE ABIRAMI ENGGINEERING WORKS PRIVATE LIMITED (BID ID -1130062)
ASIA POWER ELECTRICAL PVT LTD (BID ID -1130835)
Ascott Electricals Pvt Ltd (BID ID -1132445)
ABIRAMI ENGINEERING (BID ID -1132882)
Ascott Electricals Pvt Ltd (BID ID -1132445)
ABIRAMI ENGINEERING (BID ID -1132882)
SHREE ABIRAMI ENGGINEERING WORKS PRIVATE LIMITED (BID ID -1130062)
VENKATESWARA ELECTRICAL INDUSTRIES PRIVATE LIMITED (BID ID -1130942)
ASIA POWER ELECTRICAL PVT LTD (BID ID -1130835)
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_571408.xls
BOQ Document • 0.90 MB
151646239.pdf
Tender Document • 0.54 MB
rSpecn.pdf
Tender Document • 0.52 MB
151646241.html
Tender Document • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .