Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.8 LAccepted-AOC | ₹8.8 L Quoted ₹7.5 L | 1 | Accepted-AOC Lowest 1 |
| 2 | 2₹9.3 LRejected-AOC | ₹9.3 L | 2 | Rejected-AOC Lowest 2 |
| Sl No | Description | Qty | Unit | SURIYA ENGINEERING CONTRACTORS L2 | ARP Engineering Contractor L1 |
|---|---|---|---|---|---|
| 1.00 | Up keeping of toilets by cleaning water closets, urinals, wash basins, flushing tanks and side walls etc., by applying detergents such as Phenoil, bleaching powder, Naphthalene balls, cleaning stainer etc., for two cleaning per toilets per day as directed by the Engineer at site including cost of all materials such as phenoil, bleaching powder, Napthalene balls, cleaning stainer, buckets, mugs, brooms and brushes, labour charges, lead, lift, etc., complete and water which will be supplied by the Department at free of cost. | 8,813 | 1 No (One Number) | 105.85 ₹9.3 L | 84.9 ₹7.5 L |
Tender Value
Refer Docs
EMD Value
₹7,900
Closing Date
3 Dec 2025, 2:00 pmClosed
Chief Engineer / MTPS I
Office of the CE / MTPS I / Mettur Dam
MTPS I - Civil Circle Up Keeping of toilets in the Railway yard Office area, Decanting Pump House area, Wagon Tippler area, Loco shed area, Primary Crusher House area and Coal Handling plant for the period of one year from the date of commencement.
2025_EB_624916_1
CE / MTPS-I / SE/ CIVIL / OT.NO. 55 / 2025-26
Open Tender
Civil Works
365 days
Mettur Thermal Power Station I / Mettur Dam
As per Tender Specification
2 documents required · 2 mandatory
₹0
₹7,900
Yes
10 Feb 2026
20 Nov 2025
4 Dec 2025
20 Nov 2025
3 Dec 2025
20 Nov 2025
Up keeping of toilets by cleaning water closets, urinals, wash basins, flushing tanks and side walls etc., by applying detergents such as Phenoil, bleaching powder, Naphthalene balls, cleaning stainer etc., for two cleaning per toilets per day as directed by the Engineer at site including cost of all materials such as phenoil, bleaching powder, Napthalene balls, cleaning stainer, buckets, mugs, brooms and brushes, labour charges, lead, lift, etc., complete and water which will be supplied by the Department at free of cost.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_747264.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid