| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 CrAccepted-AOC | ₹1.4 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹1.6 Cr+₹20.0 L (14.7%)Rejected-AOC 2ND FLOOR 9 EZRA STREET KOLKATA WEST BENGAL 700001 | KOLKATA | KOLKATA | WEST BENGAL | 700001 | ₹1.6 Cr+₹20.0 L (14.7%) | 2 | Rejected-AOC L3 |
| 3 | 3₹1.6 Cr+₹26.3 L (19.4%)Rejected-AOC PURULIA | WEST BENGAL | 723101 | ₹1.6 Cr+₹26.3 L (19.4%) | 3 | Rejected-AOC L2 |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
26 Sept 2023, 3:00 pmClosed
Executive Engineer
Executive Engineer Construction Division No.II APWD, Prothrapur.
Improvement of existing rural road from Pema Junction to New Bimblitan School at Teylerabad 04 and Bimblitan 03 under Sippighat Gram Panchayat under SD-I, CD-II, APWD, Prothrapur.
2023_APWD_11551_1
No.20/NIT/SE/CC-I/2023-24
Open Tender
Civil Works - Roads
Item Rate
240 days
South Andaman
Please refer Tender Document.
6 documents required · 6 mandatory
₹0
₹3.0 L
12 Jan 2024
11 Sept 2023
27 Sept 2023
12 Sept 2023
26 Sept 2023
12 Sept 2023
12 Sept 2023 - 21 Sept 2023
Amount
Scarifying metalled (water-bound) road surface including disposal ofrubbish, lead upto 50 m and consolidation of the aggregate receivedfrom scarifying with power road roller of 8 to 10 tonne capacity.
Providing and applying tack coat using hot straight run bitumen ofgrade VG - 10, including heating the bitumen, spraying the bitumenwith mechanically operated spray unit fitted on bitumen boiler,cleaning and preparing the existing road surface as perspecifications :
On bituminous surface @ 0.50 Kg / sqm
Providing and laying Bitumen Penetration Macadam with hard stoneaggregate of quality, size and grading as specified, with bitumen ofsuitable penetration grade, including required key aggregate asspecified, spreading coarse aggregate with the help of self propelled/tipper tail mounted aggregate spreader and applying bitumen by apressure distributor and then spreading key aggregate with the helpof aggregate spreader complete, including consolidation with roadroller of minimum 8 to 10 tonne capacity to achieve specified valuesof compaction and surface accuracy :
For 75 mm compacted thickness in two layers using stoneaggregate of size 63-41 mm graded @ 0.90 cum per 10sqm key aggregate of size 20.0 mm graded @ 0.18 cumper 10 sqm. With paving asphalt grade VG - 10 @ 68 kg/10 sqm.
Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Charge.
50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 3.50% (percentage by weight of total mix) prepared in Batch Type Hot Mix Plant of 100-120TPH capacity. (including adding 10% of shredded plastic waste by the total weight of bitumen and by deducting 10% of total bitumen quantity.)
Providing and laying semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge.
25 mm compacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared Batch Type Hot Mix Plant of 100-120 TPH capacity. (including adding 10% of shredded plastic waste by the total weight of bitumen and by deducting 10% of total bitumen quantity.)
Providing, laying and spreading and compacting stone aggregate of specified sizes to WBM specification including spreading in uniform thickness, hand picking, rolling with 3 wheeled road/vibrator roller 8-10 tonne in stages to proper grade and camber applying and brooming requisite type of screening/binding materials to fill up interstics of coarse aggregate watering and compacting of the required density. Rate is inclusive of all materials, labours, machineries etc.
Sub Base with stone aggregate 53mm to 22.40mm including stone screening 11.20mm.
05 years Maintenance Provision.
1st year 0.25% of total amount
2nd year 1.00% of total amount
3rd year 1.50% of total amount
4th year 2.00% of total amount
5th year 2.75% of total amount
Surendra Infrastructure Pvt. Ltd.
CSE CONSTRUCTION (INDIA) PRIVATE LIMITED
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .