| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-AOC NOT AVAILABLE | ₹6.9 L | L1 | Accepted-AOC Lottery winner |
| 2 | L1₹6.9 LRejected-AOC | ₹6.9 L | L1 | Rejected-AOC Lottery looser |
| 3 | L1₹6.9 LRejected-AOC AT BHANDUBAR P O KUMANDA P S DIST ANGUL 759132 | ANGUL | ANGUL | ODISHA | 759132 | ₹6.9 L | L1 | Rejected-AOC Lottery looser |
| 4 | L1₹6.9 LRejected-AOC | ₹6.9 L | L1 | Rejected-AOC Lottery looser |
| 5 | L1₹6.9 LRejected-AOC | ₹6.9 L | L1 | Rejected-AOC Lottery looser |
Tender Value
₹6.9 L
EMD Value
₹7,000
Closing Date
6 Mar 2026, 5:00 pmClosed
Superintending Engineer Angul R and B Division
O/O the Superintending Engineer Angul RB Division
Repair and maintenance of non-residential building such as renovation of vehicle shed and painting to compound wall inside the I.G. of police NCR Talcher.
2026_EICCL_126534_4
SE (R and B) Angul-74/ 2025-26
Open Tender
Civil Works - Buildings
Percentage
30 days
ANGUL
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹7,000
Yes
11 Aug 2026
24 Feb 2026
7 Mar 2026
24 Feb 2026
6 Mar 2026
24 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling G.C.I. or A.C. sheet roofing after careful removal of the bolts and nuts including stacking of the useful materials for re-use and removing the debries from work site with all leads and lifts as directed by the Engineer-in-charge including all labour and T&P required for the work etc. including labour cess but excluding GST complete | - | Sqm | 104.1 | - |
| 2 | Earth work excavation in foundation trenches in all kinds of soil incluidng moorum stoney earth and earthmixed with boulders except sheet rock and boulders requiring blasting, including dressing and levelling the bed up to the required depth and depositing the excavated materials with all leads and lifts, T&P. shoring and shuttering if required etc. including labour cess but excluding GST complete as directed by the Engineer-in-charge | - | Cum | 276.89 | - |
| 3 | Supplying and filling foundation and plinth with sand in layers not exceeding 150 mm thick well watered and rammed with basic cost, conveyance, royalities, labour, T&P required including labour cess but excluding GST for the work etc. complete | - | Cum | 537.19 | - |
| 4 | Cement concrete (1:3:6) in foundation and floor i;e below the base course of terrazo flooring using 4cm (1½”) size black crusher hard broken granite aggregates / chips / metal of approved quality and from approved quarry, including lowering, laying concrete, watering curing etc. complete to required level laid in layers not exceeding 1'-6" thick including basic cost, conveyance, royalities of all materials and cost of all labour, T&P. required for the work etc. including labour cess but excluding GST complete as per direction of the Engineer-in-charge | - | Cum | 5,823.63 | - |
| 5 | Cement concrete work (1:2:4) using 12mm (½”) size black hard crusher broken granite chips of approved quality and from approved quarry over top of wall including hoisting, lowering, laying and compacting, watering & curing, as directed including basic cost, conveyance, royalities of all materials and cost of all labour and T&P. required for the work etc. including labour cess but excluding GST complete in all respect as per direction of the Engineer-in-charge (mixture machine to be used at site). | - | Cum | 7,351.73 | - |
| 6 | RCC M20 having compressive strength of 20mpa, target mean strength of 30mpa, for150mm cubes at 28 days curing as per IS-456-2000 & I.R.C-212000 test conducted in accordance with I.S. 516 using 20mm & down graded size crusher broken hard granite coarse aggregate of approved quality and from approved quarry & other materials as per section 302 of I.R.C.21-2000 & IS-456-2000 of approved quality including centering, shuttering & form works for providing smooth & water tight surface, hoisting, lowering & laying concrete in layers not exceeding 30 cm. compacted thickness, compacting with mechanical vibrators true to lines, grades as per drawing & technical specifications, watering & curing for 28 days including basic cost, conveyance, royalties of all materials with all leads & lift, cost of all labour T&P, including labour cess but excluding GST & equipment required for mixing, transporting & placing in position vibrating, compacting, finishing & curing including all incidental expenses complete in all respect as per direction of the E.I.C. but excluding the cost of M.S. rods or Tor steel and binding wire & labour charges for bending binding & tying the grills
Column Base | - | Cum | 6,117.63 | - |
| 6.01 | Column | - | Cum | 15,380.54 | - |
| 7 | Supplying, cutting, straightening the bent up M.S. Rods or Tor steel, using SAIL / TATA / RINL / JINDAL STEEL / SHYAM STEEL (grade Fe 5OOD} etc. including bending, binding, welding jointing if necessary and tying the grills and placing in position as required for R.C.C. works and for providing required no of fan hooks hoisting, lowering, laying including basic cost, conveyance of all M.S. Tor steel and binding wires of 18· to 20 gauge as required for the work bending, binding and tying the grills in all floors (Payment will be made on weight of M.S. Tor steel only and no separate payment will be made towards the weight of binding wires) etc. including labour cess but excluding GST complete as per specification & direction of Engineer-in-Charge (First Floor) | - | Qntl | 8,536.99 | - |
| 8 | Supplying fitting, fixing of M.S. Angular purlin, rafter & posts made with different angle and M.S. plate as per approved design including basic cost of all materials, welding, conveyance and labour including cost of errection etc. including labour cess but excluding GST complete as per direction of the Engineer-in-charge | - | Kg | 78.08 | - |
| 9 | Supplying, fitting and fixing 0.50 mm thick GI trafford (Dura shine) sheet in roof including drilling holes in windties fixing of ridges valley windties etc. complete including basic cost of fittings, all labour & T&P. required for the work etc. including labour cess but excluding GST complete (cost of windties will paid separately) as per direction of the Engineer-in-charge | - | Sqm | 714.03 | - |
stage.html
html • 0.10 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_582666.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_582666.xls
BOQ • 1.37 MB
4RepairIGPoliceTalcher.pdf
Tender Documents • 1.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .