Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹42.7 LAccepted-AOC 91 2 MITRA PARA ROAD NAIHATI DIST NORTH 24 PARGANAS PIN 743 165 WB | NAIHATI | NORTH 24 PARGANAS | WB | 743165 | 1 | Accepted-AOC L1 BIDDER | |
| 2 | 2₹45.0 L+₹2.3 L (5.46%)Rejected-Finance 117 LENIN SARANI KOLKATA 700 013 WEST BENGAL | KOLKATA | KOLKATA | WEST BENGAL | 700013 | 2 | Rejected-Finance Not L1 Bidder | |
| 3 | 3₹46.3 L+₹3.6 L (8.52%)Rejected-Finance 33 1 1 GOALAPARA ROAD P O AUTHPUR DIST NORTH 24 PARGANAS KOLKATA 743128 WB | KOLKATA | NORTH 24 PARGANAS | WB | 743128 | 3 | Rejected-Finance Not L1 Bidder | |
| 4 | 4₹46.4 L+₹3.8 L (8.83%)Rejected-Finance | 4 | Rejected-Finance Not L1 Bidder | |
| 5 | 5₹46.6 L+₹3.9 L (9.18%)Rejected-Finance | 5 | Rejected-Finance Not L1 Bidder |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
25 May 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE NORTH KOLKATA
GE NORTH KOLKATA 46 BT ROAD KOLKATA 50
REPAIRS TO ROOF OF CERTAIN BLDGS, WELCOME MAINT AND SMART PERIODICAL SERVICES INCLUDING REPAIR WORKS UNDER GE N KOLKATA
2023_MES_593148_1
8232/23-24/GE(N)/KOL/E8 OF 2023-24
Open Tender
Miscellaneous Works
Item Rate
210 days
UNDER GE NORTH KOLKATA
AS PER TENDERDOCUMENT
8 documents required · 8 mandatory
₹500
KOLKATA
₹90,000
Yes
13 Jun 2023
4 May 2023
26 May 2023
5 May 2023
25 May 2023
18 May 2023
Amount
Material and labour for preparation of old treated plastered surface of walls and applying one coat of white wash complete all as specified and directed.
All as per item No. 1 above but in ceiling complete all as specified and directed.
Material and labour for preparation of old treated plastered surface of walls by washing, rubbing down and stopping of distempered surfaces and applying one coat of oil bound distemper complete all as specified and directed.
All as per item No. 3 above but in ceiling complete all as specified and directed.
Material and labour for preparation of old treated plastered surfaces of wall by washing, rubbing down surfaces of wall and applying one coat of cement base paint complete all as specified and directed.
Taking down cement plaster of any description on brick walls including raking out joints, hacking for key, scrubbing down with water complete all as specified and directed.
Material and labour for 20mm thick plaster in CM (1:4) in two layers, i.e 10mm thick in each layer, top layer mixed with water proofing liquid admixture as per manufacturers instruction on brick or concrete surfaces of wall and finished the surface fair and even complete all as specified and as directed. Note :- WPC shall be measured and paid separately.
Supply only water proofing liquid admixture complete all as specified and as directed. (Make :CONPLAST X421IC of Fosroc /SIKA No 1 of SIKA/equivalent brand of PIDILITE)
Material and labour for rendering 15mm thick in CM (1:6) on fair faces of brickwork or concrete surfaces, finished the surface even and smooth without using extra cement complete all as specified and as directed.
Material and labour for rendering 5mm thick in CM (1:3) on ceiling , finished the surface even and smooth without using extra cement complete all as specified and as directed.
Material and labour for preparation of newly plastered surfaces of wall by vaccum based sanding machine, applying wall care putty min thickness 1 mm, (Multipurpose mixer shall be used for uniform and proper mixing of putty) and applying two coats of oil emulsion distemper white or coloured by Auto Roller over a coat of primer complete all as specified and directed and as per manufacturers instructions.
Material and labour for complete removal of existing treatment from old plastered surfaces of wall by Vaccum based sanding machine, removal of nails etc & filling cracks/ hole with putty, applying wall care putty upto 1mm thick as required ( Multipurpose mixer shall be used for uniform and proper mixing of putty) and applying two coats of emulsion distemper white or coloured by Auto Roller over a coat of primer complete all as specified and directed and as per manufacturers instructions.
Material and labour for preparation of newly plastered surfaces of wall by vaccum based sanding machine, and applying two coats of Anti Fungal paint white or coloured by Auto Roller over a coat of primer, including necessary scaffoldings complete all as specified and directed and as per manufacturers instructions.
Material and labour for complete removal of existing treatment from old decorated plastered surfaces of wall by Vaccum based sanding machine, removal of nails etc & filling cracks/hole with putty, and applying two coats of Anti Fungal paint white or coloured by Auto Roller over a coat of primer, including necessary scffoldings complete all as specified and directed and as per manufacturers instructions.
Material and labour for applying one coat of synthetic enamel paint to old painted wooden surface exceeding 10cm width or girth including preparation of old painted wooden surfaces complete all as specified and directed.
Material and labour for applying one coat of synthetic enamel paint on old painted steel surface of any description over 10cm width or girth including preparation of old painted steel surfaces complete all as specified and directed.
Material and labour for applying one coat of synthetic enamel paint on old painted steel surfaces not exceeding 10cm in width or girth including preparation of old painted steel surfaces complete all as specified and directed.
Material and labour for preparation of new plastered surfaces of wall and applying two coats of cement base paint over a coat of primer complete all as specified and directed.
Material and labour for preparation of new plastered surfaces of wall and applying two coats of oil bound distemper over a coat of alkali resistant primer complete all as specified and directed.
All as per item No. 19 but in ceiling complete all as specified and directed.
Material and labour for preparation of new plastered surfaces of wall and applying three coats of white wash complete all as specified and directed.
All as per item No. 21 but in ceiling complete all as specified and directed.
Material and labour for preparation of existing treatment on old plastered surfaces of walls including washing, rubbing down and stopping of old treatement and applying one coat of anti fungal paint complete all as specified and directed. Make : Asian (Apex ultima) or Berger (Weather coat long life) or eqvt brand of J&N)
Supply and fix in repairs PVC top cover of water storage tanks having capacity exc. 500 Ltrs but n.exc. 1000 Ltrs complete all as specified and directed.
Material and Labour for uprooting of wild trees such as grasses/ bushes etc. from the roof/ wall surfaces/ AC sheet/ soil pipes surroundings including its penetrated roots and making good to the damaged plaster by providing cement mortar (1:3) and finished the surfaces to match with existing surfaces complete all as specified and directed.
Demolition of cement concrete of any description including any treatment there to and in any position provided as in roof padding, roof kerb etc complete all as specified and directed. Note: - (a) Demolition should be done carefully to roof slab. (b) Any damage occurred in the roof surfaces during demolition shall be made good by the contractor without extra cost to the department. (c) Disposal of old debris/retrieved material to outside the premises or as directed by the Engineer-in-Charge.
Material and labour for providing plain cement concrete 1:2:4 type B1 using 20mm graded stone aggregate as in roof padding laid in slope as per requirement mixed with integral water proofing liquid admixture as per manufacturer's instructions complete all as specified and as directed. Note : (i) Minimum thickness of PCC shall be 50mm. (ii) Integral water proofing liquid admixture shall be measured and paid separately under appropriate item here in after
Material and labour for water proofing treatment with APP based standard membrane over PCC padding in roof with the following courses of treatment :- (a) Apply bituminous primer (IS 3384) @ 0.40 Kg per sqm of the surface area including cleaning the surfaces complete all as specified. (MAKE : Pibial Primer of TEXSA or equivalent product of BITUMAT/ BITUNIL/SIKA) (b) Apply APP plastomeric bitumen based mineral finished water proofing membrane polyester reinforced(4 Kg/Sqm) with 10cm over laps and torch bonded at joints including surface preparation before and after application of treatment as per manufactures instruction complete all as specified. (Make of APP Membrane: Moply FP 4 Kg mineral of TEXA/WP Shield 103 PM of SIKA or Equivalent material of BITUNIL/BITUMAT. (Note :- Cost of cutting groove to parapet wall for inserting APP membrance and filling groove with cement mortar (1:3) is deemed to be included within the quoted rate.)
BHARUKA ENTERPRISES
S Majumder and Construction
KAY BEE ASSOCIATES
M/S KARTICK DUTTA
MAZUMDER & CO
chaklader enterprise
MASTER BUILDERS
RADHA ENTERPRISE
MOTHER LUMIER INDUSTRIES
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .