EXECUTIVE ENGINEER (SDW) II
S.T.P. OKHLA MATHURA ROAD NEW DELHI-110025
Renovation of Final Settling Tank No.2 along with other allied works at 16 MGD STP Okhla.
2022_DJB_229439_5
NIT No-16 EE (SDW) II/ (22-23)
Open Tender
Electrical Works
Works
30 days
S.T.P. OKHLA MATHURA ROAD NEW DELHI-110025
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
A/c.50448339804
₹23,400
Yes
24 Sept 2022
16 Sept 2022
22 Sept 2022
16 Sept 2022
22 Sept 2022
16 Sept 2022
Renovation of Final Settling Tank No.2 along with other works at 16 MGD STP, Okhla by carried out the following works All the required works , materials, arrangements , tools & tackles , workmanship , safety equipment as per NHRC\NGT\ DPCC etc guidelines and as per site requirement , remodeling all the damages up to standard if occurred any complete in all respect as per requirement satisfactorily.
Isolating the Secondary Clarifier by operating Sluice Gate and providing metallic sheet & gunny bags to ensure no flow in the FST. Dewatering the stagnated effluent and cleaning the FST with the help of sump pumps and D.G. Set. De sludging and Cleaning the FST for execution of work.
Dismantling of electric motor, primary & secondary gear box and other mechanical accessories from the top of center mechanism after disconnection from main electric supply and shifting to workable place.
Making temporary platform as safety measures on the sides of the central cage as per site requirement for dismantling of drive head
Dissembling of primary & secondary reduction gear box.
Providing of worm 2 gear & pinion of primary gear box & 6 gear & pinion of secondary gear box, bushes and wheel fabricated as per sample in respect of size & finishing.
Providing/Fixing of set of bearings comprising bearing 7306 – 2 Nos. 7204 – 2 Nos. & 32216 – 2 Nos. Make: - SKF/FAG
Re-fixing of primary & secondary reduction Gear box after resembling the all above parts and alignment with motor, fixing of oil seal, filling of oil.
Providing of gear oil 320. Make: - Servo.
Renovation/ Strengthening of Both scrapper Arms Bridges along with scrappers by carrying out following works:- Dismantling of worn out bottom scrappers along with arms with the help of gas cutter, all tools & tackles.
Providing of M.S. Angle Iron of size 90 x 90 x10 mm approx. 40 meter & M.S Channel 100X 50 mm 30 meter for scrapper arm.
Fabrication/ providing of sets of bottom scrappers of sizes appx. 2700 x 200 x 8 mm along with rubber squeezers & M.S. Plate.
Providing of M.S. nuts & Bolts of different sizes.
Labour charges for fixing of above scrapper’s arms, bottom scrappers with squeezers making hole for tightening of nuts & bolts i/c all welding & cutting works.
Providing/fixing the Tie Road with support assembly
Fixing of above Tie Rod at both side of central drum for holding the scrapper arms with adjustment assembly.
Dismantling of worn out V-notch of rusted not bolts with the help of gas cutter, all tools & tackles. .
Providing the S.S nut bolts as per sample for fixing the ‘V’ notch.
Fixing the V-notch in FST after drilling in RCC with power hammer including all civil work with all tools and tackles.
Cutting of worn out/ corroded M.S. sheet of walkway with the help of gas cutter, all tools & tackle.
Providing the M.S. channel of 125X 65 mm approx 25 meter and M.S Angle 65X65X6 mm approx 25 meter
Providing of M.S chequered sheet 0.95 meter wide having 8 mm thick
Fixing of above M.S. chequered sheet with M.S Channel and M.S angle on the walkway bridge by cutting welding with required size.
Repairing of centre drum by patch work using 5mm thick M.S. sheets and homogenous electric and welding i/c replacement of the damaged stiffeners of the drum with the help of electric welding by providing of size 50x8mm M.S. flat as per site requirement. The job also includes replacement of the damaged portion of the drum and restringing with 50x50X8mm angle iron fixed on the top and bottom of the drum with the help of electric welding.
Providing of Red oxide metal primer in 20 kg packing. Make: - Asian/Nerolec/Burger.
Providing of synthetic Enamel paint in Black/Yellow Colour in 20 Ltrs. Make: - Asian/Nerolec/Burger
Painting of the complete structure after removing of rust with brush with one coat of primer & two coat of enamel paint i/c petty items.
Testing & commissioning of Clarifier after general servicing of starter, making the all electric connections with the help of thimbles, nut and bolts etc as per requirement, testing and commissioning of the same at no load and full load satisfactorily as per site requirement complete. The work also includes contingency charges, providing of heavy labour i/c any risk & cost of the labour etc.
SAI TRADING CORPORATION
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .