| 1 | L1₹25.7 LAccepted-AOC M S ASHAPURI INFRACON PVT LTD VILLAGE AND PO HURLA TEHSIL BHUNTER DISTT KULLU H P | L1 | Accepted-AOC Lower amount quoted | |
| 2 | L2₹26.7 L+₹24,923.25 (0.94%)Rejected-Finance | L2 | Rejected-Finance Higher amount quoted | |
| 3 | L3₹27.1 L+₹58,654.25 (2.21%)Rejected-Finance VPO LARHOON TEHSIL FATEHPUR DISTT KANGRA H P | L3 | Rejected-Finance Higher amount quoted |
| Sl No | Description | Qty | Unit | HARPREET SINGH L3 | RAHUL SHARMA L2 | VIKAS SHARMA L1 |
|---|---|---|---|---|---|---|
| 1.00 | Dismentling of existing creates of pitching from create made of GI wire filled with boulders with square cut faces against the wire after dismentling of pitching boulders and GI wire should be stacked at site of work as per direction of Engineer-In-Charge. | 24.12 | Cum | 400 ₹9,648 | 150 ₹3,618 Lowest | 374 ₹9,020.88 |
| 2.00 | Excavation in foundations, trenches etc.in earth work, in all lifts stacking the excavated soil not more than 3 mtrs.clear from the edge of excavation and then returning the stacked soil in 15cm.layers when required into plinths, sides of foundations etc.consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within all leads and lifts in all kind of soil such as pick work, jumper work, chieselling and in saturated soil etc. complete in all respect. | 322.87 | Cum | 300 ₹96,861 | 150 ₹48,430.5 | 125 ₹40,358.75 Lowest |
| 3.00 | Earth work in excavation of foundation trenches in all kinds of soil for tructures(Bridge works) complete including refilling trenches in 250mm layers, ramming and watering etc. & dressing of sides, bottom etc. including dewatering, shoring & strutting complete in ordinary soil, all depth including carriage of materials within all leads & lifts as per instructions of the Engineer-in-charge. | 152.64 | Cum | 350 ₹53,424 | 150 ₹22,896 Lowest | 442 ₹67,466.88 |
| 4.00 | Providing & laying cement concrete work 1 : 4 : 8 (1 cement : 4 sand : 8 water borne stone aggregate 40mm nominal size)& curing complete excluding the cost of form work in foundation and plinth including entire carriage of materials within all leads and lifts. | 82.07 | Cum | 3,300 ₹2,70,831 | 3,400 ₹2,79,038 | 3,115 ₹2,55,648.05 Lowest |
| 5.00 | Providing & laying cement concrete 1:3:6(1 cement:3 sand :6 water borne stone aggregate 20mm nominal size) and curing complete excluding the cost of form work in foundation and plinth including carriage of materials within all leads and lifts as per instructions of the Engineer-in-charge. | 3.02 | Cum | 3,900 ₹11,778 | 4,200 ₹12,684 | 3,495 ₹10,554.9 Lowest |
| 6.00 | Providing & laying cement concrete 1:2:4(1 cement:2 sand :4 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in walls (any thickness but not less than 0.10mtrs. Thickness) including attached pilasters buttresses etc. including carriage of materials within all leads and lifts as per instructions of the Engineer-in-charge. | 78.08 | Cum | 4,400 ₹3,43,552 Lowest | 4,800 ₹3,74,784 | 4,646 ₹3,62,759.68 |
| 7.00 | Providing & laying cement concrete work 1: 1½ : 3( 1cement: 1½ sand:3 graded stone agg. 20mm nominal size) M-20 and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in walls (any thickness but not less than 0.10 mtr. thickness) attached pilasters, buttersses, plinth & string courses etc. from top of foundation level upto floor two level including carriage of materials within all leads and lifts as per instructions of the Engineer-in-charge. | 101.13 | Cum | 5,450 ₹5,51,158.5 Lowest | 5,600 ₹5,66,328 | 5,717 ₹5,78,160.21 |
| 8.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30 x 30 x 5mm so as to give a fair finish including centring, shuttering, strutting & propping etc. wood battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs. and removal of the same for insitu-reinforced concrete and plain concrete workin :- | ||||||
| 8.01 | Vertical surfaces such as walls (any thickness) partitions and the like i/c attached pillasters, butteresses, plinth and string courses and the like i/c entire carriage of materials within all leads and lifts. | 361.43 | Sqm | 390 ₹1,40,957.7 | 250 ₹90,357.5 | 220 ₹79,514.6 Lowest |
| 8.02 | Flat surfaces such as soffits of suspended floors, roofs, landings and the like floors etc. upto 200mm in thickness including carriage of materials within all leads and lifts as per instructions of the Engineer-in-charge. | 59.37 | Sqm | 390 ₹23,154.3 | 350 ₹20,779.5 | 210 ₹12,467.7 Lowest |
Tender Value
₹30.2 L
EMD Value
₹60,435
Closing Date
25 Oct 2025, 12:00 pmClosed
Executive Engineer JSV Flood Protection Division G
Executive Engineer JSV Flood Prot. Division Gagret
Construction of Double RCC Box at RD 27150 Right Bank of Swan River.
2025_HPIPH_117906_1
JSV/FPDG/EA-I/5509-5549 dated 15.10.2025
Open Tender
Civil Works
Item Rate
90 days
Executive Engineer JSV Flood Protection Division G
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,500
Executive Engineer JSV Flood Prot. Division Gagret
₹60,435
21 Nov 2025
15 Oct 2025
25 Oct 2025
15 Oct 2025
25 Oct 2025
15 Oct 2025
15 Oct 2025 - 25 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
TermsandConditions.pdf
Tender Documents • 0.45 MB
Form6and8.pdf
Tender Documents • 1.06 MB
BOQ_172458.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .