| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.8 LAdmitted-Finance DOOR NO 43 2 BESIDES VIZAG DEFENCE ACADEMY 104 AREA KAPPARADA VISAKHAPATNAM 530013 | VISAKHAPATNAM | VISAKHAPATNAM | ANDHRA PRADESH | 530013 | ₹47.8 L | L1 | Admitted-Finance |
| 2 | L2₹48.4 L+₹61,430.76 (1.29%)Admitted-Finance | ₹48.4 L+₹61,430.76 (1.29%) | L2 | Admitted-Finance |
| 3 | L3₹52.0 L+₹4.2 L (8.86%)Admitted-Finance | ₹52.0 L+₹4.2 L (8.86%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MS ENTERPRISES L2 | Mavee Syndicate L1 | SUN LIGHT HOUSE L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exceeding 1.5m wide and not exceeding 1.5m in depth and getting out in hard/ dense soil for foundation of poles, structures, stay rods, laying of underground cable etc complete all as specified and directed. | 520.02 | CUM | 413 ₹2,14,768.26 | 300 ₹1,56,006 Lowest | 350 ₹1,82,007 |
| 2.00 | Excavation in trenches not exc. 1.5M wide and exc.1.5M & upto 3.0 M depth for foundation of stay/ pole etc and getting out in hard/dense soil complete all as specified and as directed. | 2.92 | CUM | 563 ₹1,643.96 | 330 ₹963.6 Lowest | 450 ₹1,314 |
| 3.00 | Returning, filling in soils including spreading, leveling, watering and well ramming in layers each not exceeding 25cm thick complete all as specified and directed | 357.21 | CUM | 263 ₹93,946.23 | 45 ₹16,074.45 Lowest | 100 ₹35,721 |
| 4.00 | Removing excavated soil to a distance not exceeding 50m and depositing where directed at a level not exceeding 1.5m above the starting point complete all as specified and directed. | 153.09 | CUM | 263 ₹40,262.67 | 55 ₹8,419.95 Lowest | 120 ₹18,370.8 |
| 5.00 | Spreading riddled earth (after preparation of excavated earth) in Cable duct with sand cushioning of cable laid in trenches complete all as directed. Note:- Punned thickness 18 CM( 6.25 Cm below cale and 11.75 cm above cable) will be measured for payment purpose. Quoted rate inclusive of all arrangement as mentioned. | 102.06 | CUM | 233 ₹23,779.98 Lowest | 800 ₹81,648 | 250 ₹25,515 |
| 6.00 | M&L in repairs for laying un-reinforced precast concrete cable cover, class HV , type 1 with , size 300 mmX180mmX 40mm complete all as directed. | 5,250 | EACH | 33 ₹1,73,250 | 21 ₹1,10,250 Lowest | 30 ₹1,57,500 |
| 7.00 | M&L in repairs for cement concrete in foundation (1:4:8) type D2 using 40 mm graded broken stone aggregate for base of foundation complete all as specified and directed. | 0.97 | CUM | 4,263 ₹4,135.11 | 4,500 ₹4,365 | 4,000 ₹3,880 Lowest |
| 8.00 | M&L in repairs for cement concrete in foundation (1:3:6) type C2 using 40 mm graded broken stone aggregate including form work complete all as specified and directed. | 5.41 | CUM | 4,693 ₹25,389.13 | 5,000 ₹27,050 | 4,500 ₹24,345 Lowest |
| 9.00 | M&L in repairs for PCC (1:2:4) type B1 (using 20mm graded stone aggregate) as in coping including necessary formwork complete all as specified and as directed. | 0.94 | CUM | 4,993 ₹4,693.42 Lowest | 5,000 ₹4,700 | 6,000 ₹5,640 |
| 10.00 | Supply and laying in replacement of GI tubing 100 mm dia, light grade for cable protection at road crossing / on poles and tubing sealed at both ends after laying the cables complete all as directed. | 18 | RM | 713 ₹12,834 | 500 ₹9,000 Lowest | 750 ₹13,500 |
Tender Value
₹55 L
EMD Value
₹1.1 L
Closing Date
17 Jul 2026, 6:00 pmClosed
CWE (Army) Secunderabad
Commander Works Engineers Mudfort, MES Office Complex Secunderabad-500 003
REPAIR/MAINTENANCE OF OVERHEAD (OH) LINES AND UG CABLES, INCLUDINNG ROUTINE PREVENTIVE AND BREAKDOWN MAINTENANCE OF TRANSFORMERS, AB SWITCHES, LIGHTNING ARRESTERS (LAs), EARTHING SYSTEMS AND ALL ASSOCIATED ALLIED ELECTRICAL WORKS, AT ZONE- II B AND
2026_MES_771644_1
86311
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
Secunderabad
as per NIT
7 documents required · 7 mandatory
₹1,000
GE (UTILITY) Secunderabad
₹1.1 L
Yes
27 Jul 2026
12 Jun 2026
24 Jul 2026
12 Jun 2026
17 Jul 2026
3 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches not exceeding 1.5m wide and not exceeding 1.5m in depth and getting out in hard/ dense soil for foundation of poles, structures, stay rods, laying of underground cable etc complete all as specified and directed. | 520.02 | CUM | - | - |
| 2 | Excavation in trenches not exc. 1.5M wide and exc.1.5M & upto 3.0 M depth for foundation of stay/ pole etc and getting out in hard/dense soil complete all as specified and as directed. | 2.92 | CUM | - | - |
| 3 | Returning, filling in soils including spreading, leveling, watering and well ramming in layers each not exceeding 25cm thick complete all as specified and directed | 357.21 | CUM | - | - |
| 4 | Removing excavated soil to a distance not exceeding 50m and depositing where directed at a level not exceeding 1.5m above the starting point complete all as specified and directed. | 153.09 | CUM | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
BOQ_864087.xls
BOQ • 0.32 MB
Tender86311.pdf
Tender Documents • 1.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .