Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹1.0 Cr+₹63.2 L (168.3%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹1.1 Cr+₹69.6 L (185.6%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹1.1 Cr+₹73.0 L (194.6%)Admitted-Finance 306 BAKSHI HOUSE 40 41 NEHRU PLACE NEW DELHI 110019 DELHI | SOUTH EAST | DELHI | 110019 | L4 | Admitted-Finance | |
| 5 | L5₹1.3 Cr+₹89.0 L (237.2%)Admitted-Finance GROUND FLOOR 1 SOCIAL POLYGON TOWER HARIDWAR BYPASS ROAD BRAHMANWALA DEHRADUN UTTARAKHAND 248001 | DEHRADUN | UTTARAKHAND | 248001 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AGNI POWER AND ELECTRONICS PVT LTD L9 | GreenSol Renewable Power Pvt Ltd L13 | Arcedo Systems L7 | RS Power Systems Pvt. Ltd. L6 | SOCIAL ENGINEERS PVT LTD L5 | BOUNDLESS ENVIRONMEMNT RESOURCE SOLUTION PVT. LTD. L8 | VOLKS ENERGIE PVT LTD L4 | Hindustan System L10 | Sunfeed Ecosolutions India Pvt Ltd L1 | Ablers Services Pvt Ltd L11 | SUNANDA SOLAR ENERGY PVT LTD L2 | NRR POWER SOLUTION PVT LTD L14 | GREENON ENERGY SERVICES L3 | REGENESIS TECHNOLOGIES I PVT LTD L12 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Procurement and INSTALLATION 3 X 100 kWp (kilowatt peak) ROOF TOP ON-GRID CONNECTED SOLAR POWER SYSTEM as per attached Scope of Work.
Bidders are requested to quote for the entire equipment along with spares included. | 1 | ST | 1,28,04,500 ₹1,44,21,619.5 | 1,42,85,673 ₹1,69,05,434.5 | 1,16,10,000 ₹1,27,91,898 | 1,17,00,000 ₹1,27,53,000 | 1,10,50,657.04 ₹1,26,57,189.15 | 1,14,00,000 ₹1,35,63,000 | 1,02,60,000 ₹1,10,56,200 | 1,44,02,020 ₹1,54,76,121 | 33,50,000 ₹37,53,500 Lowest | 1,32,87,793.5 ₹1,56,94,360.55 | 90,50,000 ₹1,00,69,525 | 1,73,70,000 ₹1,98,98,202 | 96,50,000 ₹1,07,18,370 | 1,54,80,000 ₹1,68,73,206.61 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
5 Nov 2020, 2:00 pmClosed
RATAN JAYOT SINGH BOLA
RATAN JAYOT SINGH BOLA ADMINSTRATION BUILDING NFL VIJAIPUR GUNA
Procurement and Installation of 3 X 100KWp Solar Power System
2020_NFL_57783_1
NFV/PUR/CPA200170-U
Open Tender
Solar Power Plants
Supply
120 days
NFL VIJAIPUR
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1 L
Yes
NFL VIJAIPUR
12 Jun 2021
30 Sept 2020
6 Nov 2020
30 Sept 2020
5 Nov 2020
30 Sept 2020
9 Oct 2020
Procurement and INSTALLATION 3 X 100 kWp (kilowatt peak) ROOF TOP ON-GRID CONNECTED SOLAR POWER SYSTEM as per attached Scope of Work. Bidders are requested to quote for the entire equipment along with spares included.
SUNANDA SOLAR ENERGY PVT LTD
GREENON ENERGY SERVICES
VOLKS ENERGIE PVT LTD
SOCIAL ENGINEERS PVT LTD
RS Power Systems Pvt. Ltd.
Arcedo Systems
BOUNDLESS ENVIRONMEMNT RESOURCE SOLUTION PVT. LTD.
AGNI POWER AND ELECTRONICS PVT LTD
Hindustan System
Ablers Services Pvt Ltd
REGENESIS TECHNOLOGIES I PVT LTD
GreenSol Renewable Power Pvt Ltd
NRR POWER SOLUTION PVT LTD
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .