Tender Value
₹8.2 L
EMD Value
₹16,313
Closing Date
21 Jun 2022, 5:00 pmClosed
Regional Manager
RIICO UNIT OFFICE CHURU
Regular maintenance of street light with material at IA-Churu Sardarshahar Ratangarh Bidasar Sujangarh Taranagarr Sadulpur Ph. I II III
2022_RIICO_279494_1
2022/Churu/7140/46
Open Tender
Street Lighting
Item Rate
365 days
CHURU
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
Reginoal Manager, RIICO
₹16,313
Yes
4 Jul 2022
7 Jun 2022
23 Jun 2022
7 Jun 2022
21 Jun 2022
7 Jun 2022
Amount
Maintenance of Street light fixtures in Industrial Area as per the following terms and conditions 1 At any moment a minimum of 90 percent of total fixture must be in order The defective fixture must be repaired within 48 hours failing which Rs 50 per point per day shall be penalized and recovered from the contractor 2 Contractor shall arrange at his cost for put on and off the street light fixture at the appropriate time regularly as per instructions of Engineer in charge and in the case of automatic street light controller for on off process then contractor have to set the time as per season requirement with the help of skilled electrician 3 A register shall be maintained at RIICO office and complaint lodged must be attended by Contractor within 24 Hours 4 The person deputed by Contractor shall attend the RIICO office daily and comply the instructions and attend complaints regularly 5 Contractor will have to employ trained and qualified electricians for the work 6 Corporation shall not be responsible for any kind of accident during execution of work 7 Contractor will be responsible for safety and security of fixtures and all concerned materials handed over to him by the corporation if contractor found irresponsible then penalty should be imposed on contractor otherwise contractor have to arrange all related fixtures or materials etc at his own cost 8 Contractor will be responsible for arrangement of all T and P required for the work 9 All material required for the work shall not be below the category II of concerned BSR item 10 No extra payment will be made for fixing removal of extra existing fixtures in the industrial Area 11 No extra payment will be made for fixing removal of extra existing fixture in the Industrial Area 12 Rate to be quoted by the contractor per month for complete maintenance of system 13 Contractor will be responsible for timely collection and deposition of electric bills of areas in each month In case of delay in payment and JdVVNL impose surcharge for delay payment the same will be recovered from the Current bill of the contractor 13 The contractor is required to arrange the suitable capacitor and other necessary equipment for maintaining power factor at his own cost No extra payment will be allowed for this arrangement In the case of any power factor surcharge is imposed by JdVVNL in electric bill same will be deducted from the payment of contractor but in case of power factor incentive the same will not be given to the contractor 14 Contractor will be responsible for any theft of electricity through poles and he will make necessary arrangements for this 15 In case of any theft is found suitable penalty will be imposed on the contractor 16 During execution of work penalty imposed by JdVVNL due to theft or any other reason same will be recovered from contractor 17 In Every 15 days contactor must be joint inspection of street light with corporation authorized officer otherwise payment will not done 18 No of Street light fixture may be increase upto 15 percent for this separate or extra payment will not given to agency Contractor 19 Payment is given to contractor bimonthly after providing satisfactory performance certificate from industrialists otherwise payment will not be done 20 Contractor should have maintained the register for no of points on and off daily reports and complaints Above all terms and conditions will be applied for Tube lights LED lights sodium lights or any other street light fixtures 1 Industrial area churu LED lights 190 nos
Maintenance of Street light fixtures in Industrial Area as per the following terms and conditions 1 At any moment a minimum of 90 percent of total fixture must be in order The defective fixture must be repaired within 48 hours failing which Rs 50 per point per day shall be penalized and recovered from the contractor 2 Contractor shall arrange at his cost for put on and off the street light fixture at the appropriate time regularly as per instructions of Engineer in charge and in the case of automatic street light controller for on off process then contractor have to set the time as per season requirement with the help of skilled electrician 3 A register shall be maintained at RIICO office and complaint lodged must be attended by Contractor within 24 Hours 4 The person deputed by Contractor shall attend the RIICO office daily and comply the instructions and attend complaints regularly 5 Contractor will have to employ trained and qualified electricians for the work 6 Corporation shall not be responsible for any kind of accident during execution of work 7 Contractor will be responsible for safety and security of fixtures and all concerned materials handed over to him by the corporation if contractor found irresponsible then penalty should be imposed on contractor otherwise contractor have to arrange all related fixtures or materials etc at his own cost 8 Contractor will be responsible for arrangement of all T and P required for the work 9 All material required for the work shall not be below the category II of concerned BSR item 10 No extra payment will be made for fixing removal of extra existing fixtures in the industrial Area 11 No extra payment will be made for fixing removal of extra existing fixture in the Industrial Area 12 Rate to be quoted by the contractor per month for complete maintenance of system 13 Contractor will be responsible for timely collection and deposition of electric bills of areas in each month In case of delay in payment and JdVVNL impose surcharge for delay payment the same will be recovered from the Current bill of the contractor 13 The contractor is required to arrange the suitable capacitor and other necessary equipment for maintaining power factor at his own cost No extra payment will be allowed for this arrangement In the case of any power factor surcharge is imposed by JdVVNL in electric bill same will be deducted from the payment of contractor but in case of power factor incentive the same will not be given to the contractor 14 Contractor will be responsible for any theft of electricity through poles and he will make necessary arrangements for this 15 In case of any theft is found suitable penalty will be imposed on the contractor 16 During execution of work penalty imposed by JdVVNL due to theft or any other reason same will be recovered from contractor 17 In Every 15 days contactor must be joint inspection of street light with corporation authorized officer otherwise payment will not done 18 No of Street light fixture may be increase upto 15 percent for this separate or extra payment will not given to agency Contractor 19 Payment is given to contractor bimonthly after providing satisfactory performance certificate from industrialists otherwise payment will not be done 20 Contractor should have maintained the register for no of points on and off daily reports and complaints Above all terms and conditions will be applied for Tube lights. (LED tube light fixture )
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .