Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹8.0 L+₹11,938.66 (1.52%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹8.0 L+₹15,918.22 (2.02%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.0 L
EMD Value
₹15,918
Closing Date
21 Aug 2026, 5:00 pmClosed
EXECUTIVE OFFICER NAGAR PALIKA PARISHAD RUDAULI
EXECUTIVE OFFICER NAGAR PALIKA PARISHAD RUDAULI
Ashfaqullah Khan nagar ward ke Ghosiyana me Arun kumar sadhai ki dukan se ganga Glass ke dukan tak CC road aur covered nali
2026_DOLBU_1173645_34
181/NPP/RUDAULI/2026-27
Open Tender
Civil Works
Percentage
90 days
AYODHYA
Please refer Tender documents.
2 documents required · 2 mandatory
₹939
EXECUTIVE OFFICER NAGAR PALIKA PARISHAD RUDAULI
₹15,918
5 Oct 2026
7 Aug 2026
22 Aug 2026
7 Aug 2026
21 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W .in cutting & filling including cartage3.0 km work done distance all compite | 66.15 | cum | 221 | ₹14,619.15 |
| 2 | E/W. excavation in foundation in ordinary soil including filling lift upto 1.5 mtr and lead upto 30 mtrincluding filling, watering and ramming of excavated earth into the trenches etc all complete S.I.No. 251 | 80.64 | CuM | 125 | ₹10,080 |
| 3 | P/L P.C.C. 1:6:12 In cement,f/sand, 40 mm. B/B including supply of all materials, labour and T&P etc. requaried for proper completion of the work and curing complete also including cost of formwork in foundation and floors all complete S. I. No. 273 | 9.58 | CuM | 3,950 | ₹37,841 |
| 4 | First Class 150 brick work in 1:4 cement & C.sand mortar all complete. S.I.NO 3305 b | 36.64 | CuM | 5,390 | ₹1,97,489.6 |
| 5 | 12mm thick plaster in 1:3 cement & C.Sand all 4 complete. | 158.76 | Sqm | 190 | ₹30,164.4 |
| 6 | Construction of granular sub-base by providing well graded material, spreading inuniform layers with moter grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 18.75 | CuM | 3,650 | ₹68,437.5 |
| 7 | Construction of un-reinforced dowel joints at expansion and costruction joint oniy, plain cement cocrete pavement thickness as per design over a perroared sub base with 43 Grade cement or any othr type as per claus 1501.2.2 M 30 (Grade) course and fine aggregates conforming to IS.383. maximum size of course aggregate not exceeding sealant dowl near approaches to bridge/culvert and costruction joints,curring compound (where specified)and water finishing to lines and grade as per drawing and technical specification 1501 | 23.44 | cum | 9,070 | ₹2,12,600.8 |
| 8 | Additional for Non Metalic C.C. Surface Hardner I/C all complete | 156.24 | Sqm | 96.25 | ₹15,038.1 |
| 9 | R.C.C. Work in 1:1.5:3, cement, C/Sand, 20mmstone grite in R.C.C.Slabs up to 6mtr excluding supply of reinforcement and its bending the same with 24 BW G G I Bindind wire and including necessary centering and shuttering etc. And including supply of all mmaterials, labours, T&P etc. for all comitete work AS S.I.NO. 284 B | 11.49 | cum | 8,650 | ₹99,388.5 |
| 10 | M. S.Iron in plain work such as reinforced concrete or reinforced brick work wrought to required shape as necessary including bending for proper completion of the work and including supply of all Steel and wastages and over lapping and hooks all completes.i.no.504 | 9.02 | QTL | 7,500 | ₹67,650 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.68 MB
BOQ_2208886.xls
BOQ • 0.27 MB
181OTHER.pdf
PDF • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .