Tender Value
₹52.3 L
EMD Value
₹52,286
Closing Date
13 Jul 2026, 10:59 pmClosed
Directorate of Municipal Administration
PALLAVI.K
Repair of UGD on to concrete road next to Praja Soudha of 50th ward in MCC limits(Scheduled Caste(SC)Reserved)
DMA/2026-27/WS/WORK_INDENT58124/CALL-2
DMA/2026-27/WS/WORK_INDENT58124/CALL-2
Reserved
Water supply/sewage lines
Two Tender Document System(Two Cover)
DMA City Corporation Mangaluru
KPWD Class-III & above Contractor Registration Certificate.
Tenderer in his name should have in the last five years i.e., 2021-22 to 2025-26, achieved in at least two financial years minimum annual financial turnover (in all classes of civil engineering construction works only) of Rs. 52.29 lakhs
Tenderer in his name should have in the last five years i.e., 2021-22 to 2025-26, satisfactorily completed at least one similar nature of work like Tenderer in his name should have in the last five years i.e., 2020-21 to 2024-25, satisfactorily completed at least one similar nature of work like Any Construction work value not less than Rs 13.07 lakhs ,as a prime contractor. lakhs ,as a prime contractor.
Executed in one year in the last five years i.e., 2021-22 to 2025-26, the following minimum quantities of work 1)Earth work excavation-821.61 Cum 2)Supplying and Laying UPVC pipe of 250mm dia 257.50 Rmtr 3)Supplying and Laying UPVC pipe of 110mm dia-120.00 Rmtr 4)RCC Manhole-10 Nos 5)Supplying and Filling in Plinth with Sand-108.27 Cum 6)Providing and constructing un-reinforced plain cement concrete pavement M30-60.33 Cum
Liquid assets and /or availability of credit facilities of not less than amount Rs. 15.69 lakhs (Credit lines/ letter of credit/ Banker certificates from scheduled banks for meeting the fund requirement etc.(As per Clause No 3.3b)
ESI & EPF Registration Certificate
Reserved Category Certificate
₹1,310
₹52,286
4 Jul 2026
4 Jul 2026
14 Jul 2026
10 Jul 2026
Repair of UGD on to concrete road next to Praja Soudha of 50th ward in MCC limits
Mechanical Means -
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of ...
Mechanical Means -
Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, ...
Providing UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying tru...
Construction of RCC Machinehole chambers of 1:1.5:3 proportion or approved type Cast-insitu / Pre-cast RCC Machinehole chambers, constructed using form vibrators of standard type, with barricading, da...
Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joint...
Supplying and filling in plinth with sand under floors, foundation of Bridges including watering, ramming, consolidating and dressing complete.
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting Each deposited layer by ramming after watering with a lea...
Granular Sub-Base - Plant Mix Method - Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material...
Plain Cement Pavement Quality M30 grade Concrete (RMC) with OPC & GGBS laid without Paver - Construction of un-reinforced plain cement concrete pavement using RMC M-30 grade with OPC @ 270 ...
Cutting concrete Road Surface by Machine Cutting to demarcate the trench width of the surface (P.No 63, Sl.No 13 COMMON SR 2021-22 VOLUME-5)
Construction of RCC Machinehole chambers of 1:1.5:3 proportion or approved type Cast-insitu / Pre-cast RCC Machinehole chambers, constructed using form vibrators of standard type, with barricading, da...
Construction of RCC Machinehole chambers of 1:1.5:3 proportion or approved type Cast-insitu / Pre-cast RCC Machinehole chambers, constructed using form vibrators of standard type, with barricading, da...
Construction of RCC Machinehole chambers of 1:1.5:3 proportion or approved type Cast-insitu / Pre-cast RCC Machinehole chambers, constructed using form vibrators of standard type, with barricading, da...
Dry Lean Cement Concrete Sub-base - Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not ...
Disposal off the excess excavated earth of all types by vehicle including loading, unloading with all lead and lifts, labour, HOM of machineries etc. for Distance of 4 to 5 km (P No. 63 Sl No. 4.5 W.S...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
kw-3 ind-58124.doc
Tender Document • 3.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .