Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.9 CrAccepted-Finance | ₹3.9 Cr | 1 | Accepted-Finance Accepted |
| 2 | 2₹4.0 CrAccepted-Finance | ₹4.0 Cr | 2 | Accepted-Finance Accepted |
| 3 | 3₹4.1 CrAccepted-Finance | ₹4.1 Cr | 3 | Accepted-Finance Accepted |
| 4 | 4₹4.2 CrAccepted-Finance | ₹4.2 Cr | 4 | Accepted-Finance Accepted |
| 5 | 5₹4.3 CrAccepted-Finance | ₹4.3 Cr | 5 | Accepted-Finance Accepted |
Tender Value
₹6.9 Cr
EMD Value
₹13.7 L
Closing Date
22 May 2026, 3:00 pmClosed
EXECUTIVE ENGINEER CD-VIII
OFFICE OF THE EXECUTIVE ENGINEER CD-VIII IFC DEPTT. SECTOR 15 ROHINI DELHI
Development of streets and side drains in Twenty Point Programme in Khera Garhi Colony, District North in Bawana AC.
2026_IFC_291024_1
EE/CD-VIII/NIT/2026-27/09
Open Tender
Civil Works
270 days
DELHI
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹13.7 L
22 May 2026
8 May 2026
22 May 2026
8 May 2026
22 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply of building Rubbish/Malba/similar unserviceable material dismantled or waste material by mechanical transport including loading, un-loading, stacking and banking the same in layers not exceeding 20cm in depth, braking clods watering rolling each layer with 1/2 tonne roller or wooden or steel rammers and up to embankments for roads, flood banks, marginal banks and guide banks or filling up ground depression, with all leads & all lifts. | 1,676 | Cubic Metre | 571.15 | ₹9,57,247.4 |
| 2 | Supply of earth including excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers and rolling every 3rd and top most layer with power roller of minimum 8 tonne and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions by mechanical transport within 10 km lead and lift upto 1.5m including royalty. | 1,002 | Cubic Metre | 612.44 | ₹6,13,664.88 |
| 3 | Supply of earth including excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions by mechanical transport within 10 km lead and lift upto 1.5m including royalty. | 1,202 | Cubic Metre | 607.18 | ₹7,29,830.36 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 662 | Cubic Metre | 260.87 | ₹1,72,695.94 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 662 | Cubic Metre | 6,826.92 | ₹45,19,421.04 |
| 6 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand). | 3,294 | Cubic Metre | 7,147.87 | ₹2,35,45,083.78 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 752 | Square Metre | 393.01 | ₹2,95,543.52 |
| 8 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to plinth level, excluding the cost of centering, shuttering and finishing : 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources). | 87 | Cubic Metre | 8,342.83 | ₹7,25,826.21 |
| 9 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 11.3.1 40 mm thick with 20 mm nominal size stone aggregate. | 2,256 | Square Metre | 615.55 | ₹13,88,680.8 |
| 10 | 12 mm cement plaster finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 fine sand) | 4,513 | Square Metre | 426.48 | ₹19,24,704.24 |
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Tendernotice_2.pdf
PDF • 0.34 MB
BOQ_386152.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid