Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical OK |
| 2 | Accepted-Technical SMVDU | Accepted-Technical OK |
| 3 | Accepted-Technical | Accepted-Technical OK |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
6 Jul 2026, 6:00 pmClosed
Executive Engineer PWD (RandB) Division Ramnagar.
Executive Engineer PWD (RandB) Division Ramnagar.
PLEASE REFER TO BOQ
2026_PWDJK_314047_1
e-NIT No. 26 of 2026-27 Dated- 30-06-2026
Open Tender
Civil Works
Percentage
90 days
RAMNAGAR
PLEASE REFER TO NIT
2 documents required · 2 mandatory
₹600
Executive Engineer PWD (RandB) Division Ramnagar.
₹40,000
15 Jul 2026
30 Jun 2026
7 Jul 2026
30 Jun 2026
6 Jul 2026
30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres in all kinds of soils | 51.5 | CUM | 256.85 | ₹13,227.78 |
| 2 | Providing and lying in position cement concrete 1 cement:5 fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 12 | CUM | 4,826.5 | ₹57,918 |
| 3 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 29 | CUM | 5,733.6 | ₹1,66,274.4 |
| 4 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement in 1:1.5:3 mix and curing complete. | 6 | CUM | 9,395.7 | ₹56,374.2 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 degree, landing balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding cost of centring, shuttering, finishing and reinforcement.1 cement: 1.5 coarse sand :3 graded stone aggregates 20mm nominal size. in 1:1.5:3 mix | 15.73 | CUM | 9,821.85 | ₹1,54,497.7 |
| 6 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete | 2,089 | KG | 123.2 | ₹2,57,364.8 |
| 7 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in 1cement : 6 coarse sand mortar upto plinth level upto floor level five all complete. | 47.21 | CUM | 7,571.55 | ₹3,57,452.88 |
| 8 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 47.21 | CUM | 1,455.65 | ₹68,721.24 |
| 9 | P/L 6 mm thick cement plaster of 1 cement: 3 fine sand mix. | 77.34 | SQM | 241.25 | ₹18,658.28 |
| 10 | P/L 15mm Cement plaster on the rough side of brick wall in 1:6 mix | 94 | SQM | 306.85 | ₹28,843.9 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_1016683.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .