Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC A 111 JHILMIL COLONY EAST DELHI 110095 | SHAHDARA | DELHI | 110095 | L1 | Accepted-AOC work order has been awarded | |
| 2 | L2₹5.2 L+₹43,765 (9.26%)Rejected-Finance UC I USHA PARK HARI NAGAR NEW DELHI 64 | NEW DELHI | DELHI | 110001 | L2 | Rejected-Finance Not L1 | |
| 3 | Rejected-Technical A 25 GURMANDI NEAR RANA PRATAP BAGH DELHI 110007 GURMANDI A 25 GUR MANDI NEAR RANA PRATAP BAGH DELHI GURMANDI | NORTH DELHI | DELHI | 110007 | - | Rejected-Technical All Documents is not correct |
Tender Value
Refer Docs
EMD Value
₹10,250
Closing Date
18 Jul 2022, 12:00 pmClosed
EEE-II Shah(S)
OFFICE OF THE Ex. ENGINEER (ELECT)-II 2 nd Floor Technical Laboratory Near NH-24 Ghazipur Delhi
AMC of Air Conditioners installed in Shahdara (South) Zone at Udyog Sadan building Patparganj Industrial Area Delhi.
2022_EDMC_121887_1
EE (Elect)-II//2022-23/6.2
Open Tender
Electrical Works
Item Rate
365 days
work
Please refer to tender documents
4 documents required · 4 mandatory
₹500
₹10,250
24 Jan 2025
11 Jul 2022
19 Jul 2022
11 Jul 2022
18 Jul 2022
11 Jul 2022
Amount
Annual Maintenance contract of following capacity air conditioners i/c replacement (repair of compressor, fan, motor, relays, capacitors, gas and other accessories) as and when required along with periodical checking preventive maintenance attending day to day complaints etc as reqd . a) 1.5 ton Window Type
b) 2 ton Window Type
c) 1.5 ton split type
d) 2.0 ton split type
Replacement of Copper condenser coil for 1.5 ton Split AC including other acessories.
Replacement of Copper condenser coil for 2.0 ton Split AC including other acessories.
Supply & fixing of Drain Tray for window AC as reqd.
Supply & fixing of PVC Drain Pipe as reqd.
Standard Installation charges for split AC including labour and petty items reqd. for the installation of the same as complete as reqd.
Standard Installation charges for Window AC including labour and petty items reqd. for the installation of the same as complete as reqd.
S & F of extra copper piping with 3 core electric wire, PVC Hard drain etc. as reqd.
Supply and Fixing of angle iron stand for Split AC as reqd.
SRI BALAJI ELECTRICALS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .