| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.5 LAccepted-AOC | 1 | Accepted-AOC As per decision of committee | |
| 2 | 2₹10.0 L+₹1.3 L (14.7%)Rejected-AOC | 2 | Rejected-AOC As per decision of committee | |
| 3 | 3₹12.9 L+₹4.2 L (47.7%)Rejected-AOC MCF 890 F BLOCK MCF 890 SANJAY COLONY SANJAY COLONY SECTOR 23 VILLAGE TOWN FARIDABAD CITY FARIDABAD FARIDABAD HARYANA 121005 INDIA | FARIDABAD | HARYANA | 121005 | 3 | Rejected-AOC As per decision of committee | |
| 4 | 4₹17.3 L+₹8.6 L (98.4%)Rejected-AOC | 4 | Rejected-AOC As per decision of committee |
Tender Value
₹10.0 L
EMD Value
₹23,600
Closing Date
7 Jan 2025, 1:00 pmClosed
GAGAN GANDHI
CE PTPS Panipat
Overhauling of ESP of Boiler of 250 MW, Unit-8, PTPS, Panipat
2024_HBC_416949_1
2024CF8E7921 38E0 41E2 8F7B 2D146689B2CB713PGC
Open Tender
Civil Works
Works
22 days
ASSAN KALAN
As per tender document
2 documents required · 2 mandatory
₹1,180
₹23,600
Yes
15 Apr 2025
12 Dec 2024
10 Jan 2025
12 Dec 2024
7 Jan 2025
12 Dec 2024
12 Dec 2024 - 14 Dec 2024
Overhauling of ESP of Boiler of 250 MW, Unit-8, PTPS, Panipat as per scope of work of e-NIT
Overhauling of all Fields of ESP of Boiler of 250 MW, Unit-8, PTPS, Panipat as per scope of work of e-NIT
Replacement of shaft insulator for 250 MW, Unit-8 (unit rate for variation purpose)
Replacement of support insulator for 250 MW, Unit-8 (unit rate for variation purpose)
Replacement of Deflector plates on GD Screen for 250 MW, Unit-8 (unit rate for variation purpose)
Servicing Collecting / Emitting Rapping Gear Box for 250 MW, Unit-8 (unit rate for variation purpose)
Straightening / Alignment of collecting electrode for 250 MW, Unit-8 (unit rate for variation purpose)
Replacement of emitting electrode for 250 MW, Unit-8 (unit rate for variation purpose)
Removal of collecting electrode for 250 MW, Unit-8 (unit rate for variation purpose)
Replacement of gas distribution screen for 250 MW, Unit-8 (unit rate for variation purpose)
Replacement of inner arms for 250 MW, Unit-8 (unit rate for variation purpose)
Replacement of outer arm with hammer for 250 MW, Unit-8 (unit rate for variation purpose)
Replacement of plain bearing for 250 MW, Unit-8 (unit rate for variation purpose)
Replacement of U-Clamps for 250 MW, Unit-8 (unit rate for variation purpose)
Replacement of shaft assembly of emitting rapping mechanism (EERM) including replacement of emitting shaft, plain bearing, gears , inner arms, outer arms etc for 250 MW, Unit-8 (unit rate for variation purpose)
Replacement of shaft assembly of collecting rapping mechanism (CERM) including replacement of collecting shaft, plain bearing , inner arms , outer arms etc. for 250 MW, Unit-8 (unit rate for variation purpose)
Strengthening of buckled LR & TR Beams of ESP by providing stiffeners for 250 MW, Unit-8 (unit rate for variation purpose)
Increasing gap by cutting between shock bar & shock bar guide and shock bar & deflector plate for 250 MW, Unit-8 (unit rate for variation purpose)
Man hour rates (including T&P gas consumables):- Skilled labour/ welder for 250 MW, Unit-8 (unit rate for variation purpose)
Man hour rates (including T&P gas consumables):- Semi Skilled for 250 MW, Unit-8 (unit rate for variation purpose)
Man hour rates (including T&P gas consumables):- Un Skilled for 250 MW, Unit-8 (unit rate for variation purpose)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .