| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 LAccepted-AOC | ₹12.0 L | L1 | Accepted-AOC Lowest Quatation |
| 2 | L2₹12.7 L+₹74,882 (6.25%)Rejected-Finance | ₹12.7 L+₹74,882 (6.25%) | L2 | Rejected-Finance Highest |
| Sl No | Description | Qty | Unit | Aravinth L2 | Vinothkumar L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Deparment officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth First depth of 2m | 58.32 | m3 | 256 ₹14,929.92 | 245 ₹14,288.4 Lowest |
| 2.00 | 2 nd Depth | 11.66 | m3 | 256 ₹2,985.98 | 245 ₹2,857.68 Lowest |
| 3.00 | Collection supply and filling of Stone Dust of approved quarry including cost and Conveyance of all materials to site and all labor charges for filling etc., Complete. | 4.37 | m3 | 608 ₹2,659.39 | 603 ₹2,637.52 Lowest |
| 4.00 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Department officers. | 2.9 | m3 | 5,399 ₹15,678.7 | 5,393 ₹15,661.27 Lowest |
| 5.00 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by Departmen tFor footing below G.L. ( 1,50 to 4,50 below GL ) | 13.52 | m3 | 9,401 ₹1,27,101.52 | 8,000 ₹1,08,160 Lowest |
| 6.00 | For Column and Brace upto G.L ( 0 to1,50 below GL ) | 1.49 | m3 | 9,401 ₹14,007.49 | 9,000 ₹13,410 Lowest |
| 7.00 | For column and brace I 0 to 4.5m from GL | 1.99 | m3 | 9,401 ₹18,707.99 | 9,000 ₹17,910 Lowest |
| 8.00 | For column and brace II 4.5m to 7.32m from GL | 2.46 | m3 | 9,401 ₹23,126.46 | 9,000 ₹22,140 Lowest |
| 9.00 | For column and brace III 7.32 to 10.98m from GL | 2.27 | m3 | 9,401 ₹21,340.27 | 9,000 ₹20,430 Lowest |
| 10.00 | For column beam floor slab side wall from 10.98m to 14.64 m from GL | 11.88 | m3 | 9,401 ₹1,11,683.88 | 9,000 ₹1,06,920 Lowest |
Tender Value
₹14.5 L
EMD Value
₹14,500
Closing Date
30 Sept 2025, 3:00 pmClosed
Executive Officer
Executive Officer Killai TP
Providing deep bore well with mini power pump north main road in killai Town Panchaaayat
2025_DTP_609946_1
142/2025/A1
Open Tender
Civil Works
Works
90 days
Killai TP
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹14,500
Yes
20 Jan 2026
29 Sept 2025
30 Sept 2025
29 Sept 2025
30 Sept 2025
29 Sept 2025
Amount
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Deparment officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth First depth of 2m
2 nd Depth
Collection supply and filling of Stone Dust of approved quarry including cost and Conveyance of all materials to site and all labor charges for filling etc., Complete.
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Department officers.
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by Departmen tFor footing below G.L. ( 1,50 to 4,50 below GL )
For Column and Brace upto G.L ( 0 to1,50 below GL )
For column and brace I 0 to 4.5m from GL
For column and brace II 4.5m to 7.32m from GL
For column and brace III 7.32 to 10.98m from GL
For column beam floor slab side wall from 10.98m to 14.64 m from GL
or side wall, hance and Roof slab from 14.64 m to 18.30 m from GL
For column footing and GL Brace
For Brace I
For Brace II
For Brace II
Roof slab
For Floor Beam and Bottm of Floor slab
For column Below GL
For column GL 0 to 3.30M
For column ( 3.31m to 4.30m ).
For column ( 4.31m to 5.30m).
For Column (5.31m to 6.30m )
For Column (6.31m to 7.30m )
For Column (7.31m to 8.30m )
For Column (8.31m to 9.30m )
For Column (9.31m to 10.30m )
For Column (10.31m to 11.30m )
For Column (11.31m to 11.40m )
For Side Wall, & Floor slab sides and Haunch
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by Deparment officers.
Painting two coats with approved cement paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete and as directed by Deparment officers
Providing MS Ladder & Hand rails arrangements in 30000 Lits. Capacity OHT With 12.00m Staging Height.
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete cur
Providing manhole cover of size 1x1 0.75 X 0.75 M in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edges and as directed by Department officers.
Providing GI ventilating arrangements mosquito proof nylon net with 50 mm GI pipes and cowl and as directed by Deparment officers
Painting Department emblem 1 x 1 on the SR with enamel paint as per Board's specification and as directed by Deparment officers
Supply of GI Pipes for OHT Connections 65 mm dia
Supply and Delivery of G.M.Gate valve 65mm size
Supply & Delivery of 65 mm G.I Tee
Supply & Delivery of 65 mm G.I Coupling
Supply & Delivery of 65 mm G.I bend
Supply & Delivery of 90mm T.Coupler PVC
Supply & Delivery of 80mm x 65mm G.I.Reduce
Supply & Delivery of 65mm G.I.flange set
Labour charges for fixing of G.I. Pipes & Specials for OHT pipe connections as directed by the Deparment Officers,
Refilling of the foundation with execavated soil in layers of thick including ramming watering etc., complete as directed by the Department officers
Aravinth (BID ID -1475170)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .