Tender Value
₹239.9 Cr
EMD Value
₹4.8 Cr
Closing Date
3 Sept 2026, 11:00 am
Yes (up to 4 members)
Yes (up to 4 members)
Two Packet System
EPC [ Single Stage ]
Yes
02/07/2026 15:00
Lowest to Highest
180 days
Expenditure
Capital (Works)
PRD/CON/ER
15 conditions · 3 needing a document upload
The Bidder shall have a minimum Net Worth (the "Financial Capacity") of 5% of the Estimated Project Cost at the close of the preceding Financial Year.
Technical Capacity: For demonstrating Technical Capacity and experience (the "Technical Capacity"), the Bidder shall, during the last 5 (five) previous financial years and the current financial year upto the Base month (not to be read with para2.1.13). (i)have received payments for construction of Eligible Project(s), or has undertaken construction works by itself in a PPP project, such that the sum total thereof, as further adjusted in accordance with clause 2.2.2.4 (i) & (ii), is more than 2.5 (two and half) times the Estimated Project Cost (the "Threshold Technical Capacity"). Provided that at least one fourth of the Threshold Technical Capacity shall be from the Eligible projects in Category 1 and/ or Category 3 specified in Clause 2.2.2.4 (i) & (ii). (ii)Undertaken at least one Eligible Project of Railway Sector as mentioned in clause 2.2.2.4/iii of value of not less than 50% (fifty ) per cent of the Estimated Project Cost and have received payments for not less than 75% (seventy five) per cent value of present Contract Value (excluding the payment made for adjustment of Price variation (PVC), if any) of such project. Note: - For composite works of new lines, Gauge Conversion, Doubling, 3rd line, 4th line etc. with Railway electrification and/or Signalling and telecommunication works. 1.In case scope involves the electrification work as per item No. 2 of Annexure -I of Schedule -B value as mentioned in Annexure-G, the selected bidders can himself execute above Electrification work, only in case he has experience as mentioned in clause 2.2.2.1/ii above to value of estimated electrification work as mentioned in Schedule-G of draft Concession Agreement after taking approval from Authority. Otherwise selected bidder shall execute electrification work involved in project by engaging subcontractor as per clause 3.2 of draft Concession Agreement having experience of Railway Sector works. The Railway Sector would be deemed to include overhead equipment system of Railway electrification for a railway system, metro system, suburban transit system, high speed railways, substation and transmission lines, and/or 2.In case scope involves the Signalling and Telecommunication work as per item No. 3 of Annexure -I of Schedule -B value as mentioned in Annexure-G, the selected bidders can himself execute above Signalling and Telecommunication work, only in case he has experience as mentioned in clause 2.2.2.1/ii above to value of estimated Signalling and Telecommunication work as mentioned in Schedule-G of draft Concession Agreement after taking approval from Authority. Otherwise selected bidder shall execute Signalling and Telecommunication work involved in project by engaging sub-contractor as per clause 3.2 of draft Concession Agreement having experience of Railway Sector works. The Railway Sector would be deemed to include Signalling and Telecommunication of railway system, metro system, suburban transit system, high speed railways. For more details please see RFP document as attached.
(a) Completed (executed) or substantially completed$ (executed) at least one similar works of value of not less than [20% (Twenty percent)] of the estimated project cost. OR (b) Completed (executed) or substantially completed$ (executed) at least two similar works of value not less than [10% (Ten percent)] of the estimated project cost.
Similar nature of work "Any Civil Engineering work as part of New Line/Doubling/Third Line/Quadrupling involving construction of formation and bridges".
34 conditions · 10 needing a document upload
APPENDIX-VII (BID SECURITY)/EMD, (REFER Para 1.2.4 of RFP) The Bidder shall furnish as part of its Bid, a Bid Security, referred to in Clause 1.2.4 here in above through [e-payment Gateway of Authority OR in form of Bank Guarantee from a Bank as per format at Appendix VII].
ANNEXURE III TO APPENDIX IA- (FINACIAL CAPACITY OF THE BIDDER) (Refer clause 2.2.2.2, 2.2.2.8(i), 2.2.2.7(iii) of RFP) The Bidder must establish the minimum Net Worth specified in Clause 2.2.2.2 and provide details as per format at Annex-III of Appendix-IA.
APPENDIX IB (LETTER COMPRISING THE FINANCIAL BID, (Para 2.1.4, 2.11 and 3.1.6 of RFP)- The Bid shall be furnished in the format exactly as per Appendix-IA & IB i.e. Technical Bid as per Appendix IA and Financial Bid as per Appendix IB and it shall be signed by the Bidder's authorized signatory. The Bidder shall first upload all the project details as mentioned in Para No. 2.11.1 of RFP document.
Uploading of NEFT FORM - NEFT Form will be uploaded with the tender offer.
Uploading of certificate by local suppliers in regard to meeting the Minimum Local Content requirement to avail benefits under Public Procurement Policy Order-2017 (A) for procurement order of value less than Rs. 10 crores: self certificate in accordance with Para- 9(a) of Public Procurement(Preference to Make in India) Order 2017. (B) For Procurement Order of value more than Rs. 10 crores, the certificate from Statutory auditor/cost auditor/practicing CA as the case may be in accordance with Para-9(b) of Public Procurement (Preference to Make in India) Order 2017.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Bid Security is to be paid in favour of Financial Adviser and Chief Accounts Officer/Con/ER, 14 Strand Road, 3rd floor, Kolkata-700001. For more details on Bid security please refer RFP.
All documents in support of fulfilment of eligibility criteria as detailed in RFP to be submitted online at the time of tender bidding.
Tenderers shall note that the submission of other supporting documents namely Constitution of firm/JV firm, Work in hand, Arbitration/Court cases, Tools and Plants, Technical Personnel/Man Power and Association of railway Officers, at the time of on line bidding of tender, is important and they shall ensure the same. However Railways may seek clarifications/details/documents in this regard.
STUDY OF DRAWINGS AND LOCAL CONDITIONS: The drawings for the works can be seen in the office of the Chief Administrative Officer, Construction, Eastern Railway, Kolkata- 700001 or in the office of the concerned field Deputy Chief Engineer / Construction /Bhagalpur, Eastern Railway. It should be noted that these drawings are meant for general guidance only and Railway may suitably modify them during the execution of work according to the circumstances without making the Railways liable for any claims on account of such changes. If there is any variation between the description in the tender and the detailed plans, the Authority Engineer will operate the correct description and his decision is final and binding on the tenderer/ Contractor. The Tenderer/Contractor is required to inspect the sites of works and acquaint himself with the site conditions, availability of approaches for transporting of men and materials, space and other factors relating to the works, availability of labour, electricity and water, etc., before quoting his rates. The extent of lead and lift involved in the execution of works and any difficulties involved in the execution of work should also be examined before formulating the rates for complete items of works described in the schedule. The Tender submitted will be deemed to have been made after such inspection.
CORRIGENDUM NOTICE ON IREPS: [I]Railway may modify the tender document by issuing online corrigendum through "www.ireps.gov.in" 15 days prior to the tender closing date. For the purpose of CORRIGENDUM in the tender, NIT period is splitted as under: (a) ADVERTISEMENT PERIOD: The time during which all information pertaining to tender shall be available but offers cannot be submitted (b) OFFER SUBMISSION PERIOD: 15 days prior to closing of tender, during which tenderers can submit their offer.
Applicable for the tenders with eligibility criteria: The offer of Bidder(s) who do not enclose Work Experience Certificate & Financial eligibility Certificate with requisite details, and supporting documents along with their Tender to establish their credentials shall be summarily rejected, even though they are working contractors or contractors on approved list.
The offer shall be evaluated only on the basis of the certificates/documents submitted along with the tender offer.
Any Certificate /Documents offered / submitted / received after the tender opening shall not be given any credit and shall not be considered.
Railway reserves the right to verify the authenticity of the documents/information furnished.
Tenderer(s) shall note that conditional/alternate offer will not be considered and will summarily be rejected, even though such condition makes them as the lowest tenderer.
Before submitting the offer, Bidders are advised to carefully read the RFP document, EPC agreement and other documents attached with the NIT.
Link for pre-bid meeting: https://meet.google.com/uzg-fait-prh
Execution of Doubling of BG track between Ranaghat Jn.(Excl.) and Bangaon Jn.(Excl.) from Km 1.027 to Km 32.195 including Electrification & Signaling works.
EPC-02-CAO-C-ER-2026
EPC-02-CAO-C-ER-2026
Open
Works - General
730 Days
Kolkata, West Bengal
₹0
₹4.8 Cr
3 Sept 2026
2 Jun 2026
20 Aug 2026
2 Jul 2026
27 items across 1 schedule · ₹9,52,05,180.48 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Supplying & laying of drainage composite for use behind abutments, wing walls, return walls and Retaining walls Geocomposite drain (Vertical) as per RDSO Specification RDSO/2018/GE:IRS-0006 latest version with all material, labour, equipment, tools and plants, lead, lift etc. complete in respects as per the direction of Engineer-in-Charge. | Sqm No. all | 500.00 | 550.74 | 2,75,370 |
| 2 | All kinds of soils | cum | 1435.57 | 210.35 | 3,01,972.15 |
| 3 | 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) | cum | 131.71 | 2,833.43 | 3,73,191.07 |
| 4 | Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality in RCC raft foundation & Pile cap including finishing, using Plasticiser in approved proportions (as IS:9103), to modify workability without impairing strength durability complete as per specifications and direction of Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. Plasticiser shall invariably be used in approved proportion increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage Mix Design and in that case deduction shall be made as relevant item. | cum per and the 2. to of per | 1340.00 | 2,783.22 | 37,29,514.8 |
| 5 | Abutment & Pier | cum | 200.00 | 2,866.05 | 5,73,210 |
| 6 | Wing wall and Return wall | cum | 85.00 | 2,866.05 | 2,43,614.25 |
| 7 | Abutment cap, Pier Cap, Inspection Platform & Pedestal over cap, Fender wall, Diaphragm wall etc. | Pier cum | 200.00 | 2,907.46 | 5,81,492 |
| 8 | Approach slab at formation level, Dirt wall/ ballast wall formation level | at cum | 25.00 | 2,824.63 | 70,615.75 |
| 9 | 1200mm diameter | Metre | 1800.00 | 5,752.47 | 1,03,54,446 |
| 10 | Providing, fabricating and installing permanent casing pipe bored piles for all diameters with specified thickness of steel plate including all labour, materials, tools & complete as approved drawing & specifications complete in all respect as the direction of Engineer in charge. Note: Payment shall made as per the weight of circular plate of casing pipe only. | for MT per per be | 30.00 | 1,14,921.98 | 34,47,659.4 |
| 11 | Initial load test above 100 ton and up to 250 T capacity pile | Each | 2.00 | 92,414.86 | 1,84,829.72 |
| 12 | Routine Load Test above 100 ton capacity up to 250 ton capacity pile | Each | 2.00 | 46,207.43 | 92,414.86 |
| 13 | Piles with lateral load capacity of above 50 ton and up to 100 | ton Each | 2.00 | 27,242.19 | 54,484.38 |
| 14 | Pulse Echo Test (PET) for integrity testing of piles with contractor's men, materials and machines. The rate includes cost of Inspection of site, preparation of pile head and any other unforeseen cost required for the test, submission of reports triplicate as per satisfaction of the Engineer in Charge. | Each in | 72.00 | 2,843.56 | 2,04,736.32 |
| 15 | Providing and applying two coats of coal tar or bitumen confirming to IS:3117- latest version on the top and sides of RCC box/slabs @ 1.70 kg/sqm after cleaning the surface with labour and materials complete job as directed by the Engineer. | Sqm all | 1875.00 | 177.1 | 3,32,062.5 |
| 16 | All types of bridge sub-structures, e.g. pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level | Sqm | 1819.66 | 756.62 | 13,76,791.15 |
| 17 | Ordinary Portland Cement 53 grade of approved brands/makes | MT | 1695.26 | 7,686.17 | 1,30,30,056.55 |
| 18 | Thermo-Mechanically Treated bars of grade Fe-500D or more approved brands/makes. | of Kg | 593238.54 | 98.07 | 5,81,78,903.62 |
| 19 | For Span design load up to 100 MT | Each | 1.00 | 84,279.59 | 84,279.59 |
| 20 | Extra for every increase of 1 MT or part thereof over 100 MT the span design load capacity up to 800 MT | in MT | 8.00 | 365.9 | 2,927.2 |
| 21 | Providing Flood Level Gauges on abutments and piers, made 20mm thick 1:4 cement plaster for a width of not less than 300mm, duly engraving markings & figures in metres, divided into 10 parts commencing from under-side of girders towards bed, painting markings & figures with black enamel paint three coats on white background including painting HFL Mark white by side of gauge with year of occurrence with Contractor's materials, labour, tools, scaffolding and supports, lead & lifts, curing etc. complete as per approved drawing and as directed by the Engineer in- charge excluding cost of cement which shall be paid extra. | by Sqm in in all | 1.00 | 623.33 | 623.33 |
| 22 | Providing and fixing railing used in rows for footpath or anti- crash barrier railing with B class G.I. pipe 65/50 mm nominal including cost of M.S. angle and channels in vertical posts, welding / bolting, priming painting with one coat ready mix Zinc Chromate conforming to IS:104 with DFT of 25-30Microns, followed by one coat of Zinc Chrome red oxide conforming IS:2074 with DFT of 25 Microns with all material, labour, T&P a complete job. Note: Cost of painting shall be paid extra under relevant item. | Kg dia to as | 2000.00 | 107.8 | 2,15,600 |
| 23 | Providing and laying Pitching with Stone Boulders, weighing less than 35kg each with voids filled with spalls on slopes, over prepared filter media including boulder apron laid dry front of toe of embankment complete as per drawing Technical Specifications (filter media to be paid separately under the relevant item). | not cum laid in and | 220.00 | 1,864.34 | 4,10,154.8 |
| 24 | Providing and laying Filter Material as per RDSO Specifications underneath pitching in slopes complete as per drawing Technical Specification. | cum and | 220.00 | 2,828.58 | 6,22,287.6 |
| 25 | Supplying, spreading and filling coarse sand (no cohesive materials to be used) of approved quality including watering ramming in foundation, behind the abutment, wing wall, retaining wall in layers not exceeding 150mm thick including compaction as per direction of Engineer-in-charge. The rate includes all lead, lift, ascent, descent, crossing of Railway etc. complete with contractor's labour, materials, tools and plant. | cum and its line | 113.10 | 1,200.32 | 1,35,756.19 |
| 26 | Providing Boulder Backing behind wing wall, return wall, retaining wall with hand packed boulders & cobbles with smaller size boulders toward the back including all lead, lift, labour other incidental charges as complete work in all respect. Payment for boulder/cobbles will be done extra. | cum & | 600.00 | 457.58 | 2,74,548 |
| 27 | cum of | 1275.00 | 42.07 | 53,639.25 | |
| Schedule total | ₹9,52,05,180.48 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
epctrdWORKS_BNJ-RHA_finalsentforcheckingsignedSKMKV.pdf
ATTACHMENT
ExplanatoryNoteforElectricalGworkBNJ-RHA27.05.2026_signed.pdf
ATTACHMENT
TypicaldrawingofStationbuildingcumEIbuilding_1.pdf
ATTACHMENT
gangnapur-uptoADRM-SDAH.pdf
ATTACHMENT
MAJHRGRAMUPTOADRM-SDAH.pdf
ATTACHMENT
GOPALNAGAR-ADRM-SDAH.pdf
ATTACHMENT
PileWellfoundation_Manual_1.pdf
ATTACHMENT
RHA-BNJDLG1Asigned_1.pdf
ATTACHMENT
RHA-BNJDLG1Bsigned_1.pdf
ATTACHMENT
RHA-BNJDLG1Csigned1.pdf
ATTACHMENT
RHA-BNJDLG1Dsigned_1.pdf
ATTACHMENT
ST_1.pdf
ATTACHMENT
RFPFinal-BNJ-RHA2.pdf
ATTACHMENT
EPCagreementfinalRHA-BNJDL3.pdf
ATTACHMENT
CEDRG191-2019.pdf
ATTACHMENT
TypicalBallastprofiledrawing.pdf
ATTACHMENT
CAOCONDRGNo.140-2012.pdf
ATTACHMENT
GangnapurSIP.pdf
ATTACHMENT
GopalnagarSIP.pdf
ATTACHMENT
MajhergramSIP.pdf
ATTACHMENT
NabaraynagarhaltESP.pdf
ATTACHMENT
SpecificationsforTrackBallastuptoACS-1.pdf
ATTACHMENT
TypicalsketchTrolleyrefugeonformation.pdf
ATTACHMENT
ArchBridgeCodeUpdateduptoACS9.pdf
ATTACHMENT
WeldedBridgeCode.pdf
ATTACHMENT
TracksideIndicatorBoardsAndSignages.pdf
ATTACHMENT
RailwayRulesforOpening.pdf
ATTACHMENT
TypicalsketchPathwayfencing.pdf
ATTACHMENT
ATWeld_Manual-2022.pdf
ATTACHMENT
HeightgaugeforROB.pdf
ATTACHMENT
DivyangjanAmenitiesRBletter26.08.2025.pdf
ATTACHMENT
262410455.pdf
ATTACHMENT
DivyangjanCommonlyObservedDeficiencies_V.1_26.08.2025.pdf
ATTACHMENT
10433alt-2.pdf
ATTACHMENT
HeightgaugeforRUBandLCgate.pdf
ATTACHMENT
CAOCONDRGNO54-2012.pdf
ATTACHMENT
FBWManual-Reprint2022-IncorporateduptoCS4.pdf
ATTACHMENT
CoopershaltESP.pdf
ATTACHMENT
TypicalGAD-LCextension.pdf
ATTACHMENT
AkaipurhaltESP.pdf
ATTACHMENT
SatberiahaltESP.pdf
ATTACHMENT
MajorBr.No.19-RHA-BNJ.pdf
ATTACHMENT
FoundationSubstructureCode.pdf
ATTACHMENT
LsectionRHA-BNJSh03of07.pdf
ATTACHMENT
CBS-0042-R1SERIES.pdf
ATTACHMENT
LsectionRHA-BNJSh02of07.pdf
ATTACHMENT
IRSTMManual2ndedition-1.pdf
ATTACHMENT
LsectionRHA-BNJSh07of07.pdf
ATTACHMENT
RailhandlingguidelinesCT35Feb2023.pdf
ATTACHMENT
LsectionRHA-BNJSh01of07.pdf
ATTACHMENT
ThirdPartyInspection-Process.pdf
ATTACHMENT
LSectionRHA-BNJSh06of07.pdf
ATTACHMENT
LsectionRHA-BNJSh04of07.pdf
ATTACHMENT
ProjectmonitoringbyusingAGReferredUASDroneletterdt.25.08.20231.pdf
ATTACHMENT
PolicyforInspectionofP.waymaterials.pdf
ATTACHMENT
SBCIncorporatedUptoACS24.pdf
ATTACHMENT
seismic_code_incorporated_acs_2.pdf
ATTACHMENT
USFDManual.pdf
ATTACHMENT
IRS_Bridge_Rule_updateduptoACS_53.pdf
ATTACHMENT
10451seriesPFSHELTER.pdf
ATTACHMENT
LsectionRHA-BNJSh05of07.pdf
ATTACHMENT
STANDARDSIGNAGESATSTATIONSONINDIANRAILWAYSApril2023.pdf
ATTACHMENT
BS-41R1.pdf
ATTACHMENT
IRST19.pdf
ATTACHMENT
RDSO2020GEIRS-0004112-222.pdf
ATTACHMENT
IRS_B1_updateduptoACS-13.pdf
ATTACHMENT
RDSO2020GEIRS-00041-111.pdf
ATTACHMENT
INDIANRAILWAYSTRACKMACHINEMANUALINCORPORATEDUPTOACS10.pdf
ATTACHMENT
IRPWM2024CorrectedUpToACS-1126-02-2026.pdf
ATTACHMENT
IRSOD_INCORPORATED_New.pdf
ATTACHMENT
GER-50Revision-22024.pdf
ATTACHMENT
ConcreteBridgeCode-1-50.pdf
ATTACHMENT
ConcreteBridgeCode-51-100.pdf
ATTACHMENT
ConcreteBridgeCode-101-128.pdf
ATTACHMENT
IRWMCSUPTO12dtd.23.08.24-1-30.pdf
ATTACHMENT
IRWMCSUPTO12dtd.23.08.24-31-60.pdf
ATTACHMENT
IRWMCSUPTO12dtd.23.08.24-61-80.pdf
ATTACHMENT
IRWMCSUPTO12dtd.23.08.24-81-85.pdf
ATTACHMENT
IRWMCSUPTO12dtd.23.08.24-86-90.pdf
ATTACHMENT
IRWMCSUPTO12dtd.23.08.24-91-100.pdf
ATTACHMENT
IRWMCSUPTO12dtd.23.08.24-101-120.pdf
ATTACHMENT
IRWMCSUPTO12dtd.23.08.24-121-150.pdf
ATTACHMENT
IRWMCSUPTO12dtd.23.08.24-151-200.pdf
ATTACHMENT
IRWMCSUPTO12dtd.23.08.24-201-280.pdf
ATTACHMENT
HyperLinkedIRBM2024-1-100.pdf
ATTACHMENT
HyperLinkedIRBM2024-101-200_compressed.pdf
ATTACHMENT
HyperLinkedIRBM2024-201-230_compressed.pdf
ATTACHMENT
HyperLinkedIRBM2024-231-298_compressed.pdf
ATTACHMENT
in.gov.nbc.2016.vol1.digital-1-100.pdf
ATTACHMENT
in.gov.nbc.2016.vol1.digital-101-300_compressed.pdf
ATTACHMENT
in.gov.nbc.2016.vol1.digital-301-500_compressed.pdf
ATTACHMENT
in.gov.nbc.2016.vol1.digital-501-700_compressed.pdf
ATTACHMENT
in.gov.nbc.2016.vol1.digital-701-1000_compressed.pdf
ATTACHMENT
in.gov.nbc.2016.vol1.digital-1001-1226_compressed.pdf
ATTACHMENT
in.gov.nbc.2016.vol2.digital-1-50.pdf
ATTACHMENT
in.gov.nbc.2016.vol2.digital-51-100.pdf
ATTACHMENT
in.gov.nbc.2016.vol2.digital-101-150_compressed.pdf
ATTACHMENT
in.gov.nbc.2016.vol2.digital-151-200.pdf
ATTACHMENT
in.gov.nbc.2016.vol2.digital-201-300.pdf
ATTACHMENT
in.gov.nbc.2016.vol2.digital-301-400.pdf
ATTACHMENT
in.gov.nbc.2016.vol2.digital-401-600_compressed.pdf
ATTACHMENT
in.gov.nbc.2016.vol2.digital-601-800.pdf
ATTACHMENT
in.gov.nbc.2016.vol2.digital-801-1026_compressed.pdf
ATTACHMENT
Br.No.02-RHA-BNJ.pdf
ATTACHMENT
Br.No.03-RHA-BNJ.pdf
ATTACHMENT
Br.No.04-RHA-BNJ.pdf
ATTACHMENT
Br.No.05-RHA-BNJ.pdf
ATTACHMENT
Br.No.06-RHA-BNJ.pdf
ATTACHMENT
Br.No.07-RHA-BNJ.pdf
ATTACHMENT
Br.No.08-RHA-BNJ.pdf
ATTACHMENT
Br.No.09-RHA-BNJ.pdf
ATTACHMENT
Br.No.10-RHA-BNJ.pdf
ATTACHMENT
Br.No.11-RHA-BNJ.pdf
ATTACHMENT
Br.No.12-RHA-BNJ.pdf
ATTACHMENT
Br.No.13-RHA-BNJ.pdf
ATTACHMENT
Br.No.14-RHA-BNJ.pdf
ATTACHMENT
Br.No.15-RHA-BNJ.pdf
ATTACHMENT
Br.No.16-RHA-BNJ.pdf
ATTACHMENT
Br.No.17-RHA-BNJ.pdf
ATTACHMENT
Br.No.18-RHA-BNJ.pdf
ATTACHMENT
Br.No.20-RHA-BNJ.pdf
ATTACHMENT
Br.No.21-RHA-BNJ.pdf
ATTACHMENT
Br.No.22-RHA-BNJ.pdf
ATTACHMENT
Br.No.23-RHA-BNJ.pdf
ATTACHMENT
1.GopalNagarTentativeSIP.pdf.pdf
ATTACHMENT
2.MajhergramTentativeSIP.pdf
ATTACHMENT
3.GangnapurTentativeSIP.pdf
ATTACHMENT
4.CableCorragePlan_MBB.pdf
ATTACHMENT
5.RCCDUCTS-RevisedDrawingswithLAngleinplaceofCChannel30-06-2025.pdf
ATTACHMENT
6.TC-108CableRouteMarker.pdf
ATTACHMENT
7.TC129.pdf
ATTACHMENT
8.TC-110connectivityUFSBIBPAC.pdf
ATTACHMENT
9.TechnicalCircularNo.113ER.pdf
ATTACHMENT
10.Technicalcircular112STcablelaying.pdf
ATTACHMENT
11.Technicalcircular124RequirementofOFCcablesformodernsignalling.pdf
ATTACHMENT
12.ER-Technicalcircular107quadjoints.pdf
ATTACHMENT
13.PolicyforVitalFunctionalBitsofEI.superseedssl.no.155.pdf
ATTACHMENT
14.ImplementationofSMPSBASEDINTEGRATEDPOWERSUPPLYIPSasperthelatestRDSOGuidelinedated230625.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].