Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Finance PANDANESWAR BARDHAMAN BARDHAMAN 713346 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713346 | ₹2.3 L | L1 | Admitted-Finance |
| 2 | L2₹2.4 LAdmitted-Finance KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | ₹2.4 L | L2 | Admitted-Finance |
| 3 | L3₹2.6 LAdmitted-Finance | ₹2.6 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RINA ENTERPRISE L3 | BABLU SINHA L2 | SWAPAN KUMAR AKHULI L1 |
|---|---|---|---|---|---|---|
| 1.00Part A : Installation of gear box, motor with all electricals in a belt conveyor of LHCM1 section in RVIIA at 3&4 Incline UG of Jhanjra Project Colliery | ||||||
| 1.01 | Loading, transportation & unloading of one nos healthy motor (110kW) & DA-oxygen cylinder from surface to site (UG belt conveyor drive head) with help of haulages including 30mtr manual transport. | 1 | WORK | 33,560 ₹33,560 | 31,200 ₹31,200 | 30,982.87 ₹30,982.87 |
| 1.02 | Loading, transportation & unloading of one nos gear box (90kW) to site (UG belt conveyor drive head) with help of haulages including 30mtr manual transport. | 1 | WORK | 18,540 ₹18,540 | 15,690 ₹15,690 | 15,491.44 ₹15,491.44 |
| 1.03 | Loading, transportation & unloading of one nos healthy starter (550V/110kW) to site (UG belt conveyor drive head) with help of haulages including 30mtr manual transport. | 1 | WORK | 36,580 ₹36,580 | 35,316 ₹35,316 | 34,425.41 ₹34,425.41 |
| 1.04 | Transportation (by haulage and manually) as required, Laying and hanging installation of the cable (3.3kV grade/70 sq.mm) (double wire armoured) at site and hanging them (excluding supply of materials). (As per sl. No 28 of Committee report ECL/GM/JNR/2024-25/303 Dt. 29.08.2024) | 1 | WORK | 45,999 ₹45,999 | 45,500 ₹45,500 | 45,432.42 ₹45,432.42 |
| 1.05 | Placing of the starter (6.6KV/200KW). | 1 | WORK | 18,524 ₹18,524 | 18,900 ₹18,900 | 17,212.71 ₹17,212.71 |
| 1.06 | Fitting-alignment of healthy gear box (90kw) after required fabrication of base frame at site (UG belt conveyor). | 1 | WORK | 22,540 ₹22,540 | 21,900 ₹21,900 | 20,914.19 ₹20,914.19 |
| 1.07 | Fitting-alignment of healthy motor (110kW) after required fabrication of base frame at site (UG belt conveyor), then alignment of gear box-motor and coupling fitting. | 1 | WORK | 45,470 ₹45,470 | 44,714 ₹44,714 | 42,002.64 ₹42,002.64 |
| 1.08 | Loading, transportation & unloading of two nos healthy ACB's (200A/550V) from surface to site (UG belt conveyor drive head & substation) with help of haulages including 30mtr manual transport. | 1 | WORK | 22,566 ₹22,566 | 21,900 ₹21,900 | 20,655.25 ₹20,655.25 |
| 1.09 | Supply of DA cylinder (@6.2 Cu. mtr/cylinder) | 2 | Nos | 4,352 ₹8,704 | 2,100 ₹4,200 | 2,075.76 ₹4,151.52 |
Tender Value
₹2.7 L
EMD Value
₹3,500
Closing Date
3 Apr 2026, 11:00 amClosed
AREA ENGINEER ENM
Office of the General Manager, Jhanjra Area, ECL
Installation of gear box, motor with all electricals in a belt conveyor of LHCM1 section in RVIIA at 3n4 Incline UG of Jhanjra Project Colliery
2026_ECL_357329_1
ECL/GM/JNR/EnM/A2/25-26/146 dated 18.03.2026
Open Tender
Miscellaneous Works
21 days
JHANJRA
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,500
6 May 2026
23 Mar 2026
4 Apr 2026
23 Mar 2026
3 Apr 2026
24 Mar 2026
23 Mar 2026 - 30 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Part A : Installation of gear box, motor with all electricals in a belt conveyor of LHCM1 section in RVIIA at 3&4 Incline UG of Jhanjra Project Colliery | ||||||
| 1.01 | Loading, transportation & unloading of one nos healthy motor (110kW) & DA-oxygen cylinder from surface to site (UG belt conveyor drive head) with help of haulages including 30mtr manual transport. | - | WORK | - | - | BI01010001010000000000000515BI0100001123 |
| 1.02 | Loading, transportation & unloading of one nos gear box (90kW) to site (UG belt conveyor drive head) with help of haulages including 30mtr manual transport. | - | WORK | - | - | BI01010001010000000000000515BI0100001124 |
| 1.03 | Loading, transportation & unloading of one nos healthy starter (550V/110kW) to site (UG belt conveyor drive head) with help of haulages including 30mtr manual transport. | - | WORK | - | - | BI01010001010000000000000515BI0100001125 |
| 1.04 | Transportation (by haulage and manually) as required, Laying and hanging installation of the cable (3.3kV grade/70 sq.mm) (double wire armoured) at site and hanging them (excluding supply of materials). (As per sl. No 28 of Committee report ECL/GM/JNR/2024-25/303 Dt. 29.08.2024) | - | WORK | - | - | BI01010001010000000000000515BI0100001126 |
| 1.05 | Placing of the starter (6.6KV/200KW). | - | WORK | - | - | BI01010001010000000000000515BI0100001127 |
| 1.06 | Fitting-alignment of healthy gear box (90kw) after required fabrication of base frame at site (UG belt conveyor). | - | WORK | - | - | BI01010001010000000000000515BI0100001128 |
| 1.07 | Fitting-alignment of healthy motor (110kW) after required fabrication of base frame at site (UG belt conveyor), then alignment of gear box-motor and coupling fitting. | - | WORK | - | - | BI01010001010000000000000515BI0100001129 |
| 1.08 | Loading, transportation & unloading of two nos healthy ACB's (200A/550V) from surface to site (UG belt conveyor drive head & substation) with help of haulages including 30mtr manual transport. | - | WORK | - | - | BI01010001010000000000000515BI0100001130 |
| 1.09 | Supply of DA cylinder (@6.2 Cu. mtr/cylinder) | - | Nos | - | - | BI01010001010000000000000515BI0100001131 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.48 MB
Tendernotice_2.pdf
PDF • 1.20 MB
BOQ_370192.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid