| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC | L1 | Accepted-AOC Thiru.Padari Rahim has been quated lowest rate of 24.94 percentage below from Estimate rate and his rate has been approved. | |
| 2 | L2₹16.7 L+₹1.4 L (9.16%)Rejected-Finance 19B CHIDAMBARANATHAPURAM DEVAKOTTAI SIVAGANGAI DISTRICT | PUDUKKOTTAI | TAMIL NADU | 621308 | L2 | Rejected-Finance M/s. S S and Co has been quoted lowest rate of 18.09 percentage below from Estimate rate. | |
| 3 | L3₹17.1 L+₹1.8 L (11.8%)Rejected-Finance | L3 | Rejected-Finance Thiru. P P Yacob has been quoted lowest rate of 16.04 percentage below from Estimate rate. | |
| 4 | L4₹18.5 L+₹3.1 L (20.5%)Rejected-Finance | L4 | Rejected-Finance Thiru. Abdul Majeed has been quoted lowest rate of 9.09 percentage below from Estimate rate. | |
| 5 | L5₹20.4 L+₹5.1 L (33.0%)Rejected-Finance | L5 | Rejected-Finance Thiru. Hamza Ashraf has been quoted lowest rate of 0.20 percentage below from Estimate rate. |
| Sl No | Description | Qty | Unit | P P YACOB | S S AND CO | JOSEPH EDWIN | P SALEEM | HAMZA ASHRAF | ABDUL MAJEED | PADARI RAHIM |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B | 45 | m3 | 9,752.4 ₹11,507.83 | 9,495 ₹11,204.1 | 12,060 ₹14,230.8 | 12,190.5 ₹14,384.79 | 11,610 ₹13,699.8 | 10,507.05 ₹12,398.32 | 8,716.5 ₹10,285.47 Lowest |
| 2.00 | Plain Cement Concrete 1:4:8 Mix (one part cement, Four part sand and Eight part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 15 | m3 | 1,07,074.8 ₹1,26,348.26 | 1,04,535 ₹1,23,351.3 | 1,27,950 ₹1,50,981 | 1,33,843.5 ₹1,57,935.33 | 1,27,350 ₹1,50,273 | 1,15,500 ₹1,36,290 | 95,730 ₹1,12,961.4 Lowest |
| 3.00 | Supplying and erecting centering for sides and soffits including supports and strutting upto 3.00m height for plane surface such as RCC Slab, Rectangular Beams, Tee (or) ELL Beams, Lintel Bed Block, Slabs, Landing Slabs, Beams Canopy, Side Slab (or) Square (or) Round columns etc., as detailed below with all cross branching using M.S. Sheets of size 80cm x 60cm and B.G. 10 stiffended with welded M.S. Angles of size 25 x 25 x 3mm for boarding laid over silver oak or country wood joints of 10cm to 30cm to dia spaced at 75cm c/c etc., complete complying with standard specifications as directed by departmental officers etc., complete. | 294 | m2 | 1,54,596.96 ₹1,82,424.41 | 1,50,822 ₹1,77,969.96 | 1,87,278 ₹2,20,988.04 | 1,93,246.2 ₹2,28,030.52 | 1,84,044 ₹2,17,171.92 | 1,66,404 ₹1,96,356.72 | 1,38,224.1 ₹1,63,104.44 Lowest |
| 4.00 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 45 | m3 | 3,73,123.8 ₹4,40,286.08 | 3,64,275 ₹4,29,844.5 | 4,47,885 ₹5,28,504.3 | 4,66,447.5 ₹5,50,408.05 | 4,43,700 ₹5,23,566 | 4,02,075 ₹4,74,448.5 | 3,33,589.5 ₹3,93,635.61 Lowest |
| 5.00 | Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH | 74 | m3 | 2,81,709.12 ₹3,32,416.76 | 2,74,836 ₹3,24,306.48 | 3,36,182 ₹3,96,694.76 | 3,52,129 ₹4,15,512.22 | 3,35,072 ₹3,95,384.96 | 3,03,548 ₹3,58,186.64 | 2,51,859 ₹2,97,193.62 Lowest |
| 6.00 | Supplying and laying Rubberised interlocking Paver block M40 grade Providing and laying of 83mm thick high strength type conforming IS 15658-2006 of rubberized interlocking paver lock in size of minimum compressive strength of 40N/mm2 in uniform shape of approved make to be laid in flurring bone pattern with sand cushion below the uniform shap of approved non skitting surface in the top and the rate including levelling the base preparation of pavers as sub base, sand cushion 100mm thick laying out of pavement cut the pieces to fix the edge vibring the pavers,sweeping tranporting loading unloading of laying paver block as per standard specification,. | 735 | m2 | 7,87,802.4 ₹9,29,606.83 | 7,68,810 ₹9,07,195.8 | 10,17,240 ₹12,00,343.2 | 9,84,716.25 ₹11,61,965.18 | 9,36,757.5 ₹11,05,373.85 | 8,48,763.3 ₹10,01,540.69 | 7,04,350.5 ₹8,31,133.59 Lowest |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
26 Jun 2025, 3:00 pmClosed
Executive Officer
Devarshola Town Panchayat Office, Devarshola Post, The Nilgiris - 643207
SPECIAL FUND SCHEME - 2025-2026 - Providing Paver Block road at Alavayal Street .1 and 2.
2025_DTP_567253_1
138/2025/A1-2
Open Tender
Civil Works
Works
160 days
Devarshola Town Panchayat Office
SPECIAL FUND SCHEME - 2025-2026 - Providing Paver Block road at Alavayal Street .1 and 2.
2 documents required · 2 mandatory
₹0
₹25,000
Yes
Devarshola Town Panchayat Office
10 Sept 2025
11 Jun 2025
26 Jun 2025
11 Jun 2025
26 Jun 2025
11 Jun 2025
11 Jun 2025 - 26 Jun 2025
16 Jun 2025
Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B
Plain Cement Concrete 1:4:8 Mix (one part cement, Four part sand and Eight part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.
Supplying and erecting centering for sides and soffits including supports and strutting upto 3.00m height for plane surface such as RCC Slab, Rectangular Beams, Tee (or) ELL Beams, Lintel Bed Block, Slabs, Landing Slabs, Beams Canopy, Side Slab (or) Square (or) Round columns etc., as detailed below with all cross branching using M.S. Sheets of size 80cm x 60cm and B.G. 10 stiffended with welded M.S. Angles of size 25 x 25 x 3mm for boarding laid over silver oak or country wood joints of 10cm to 30cm to dia spaced at 75cm c/c etc., complete complying with standard specifications as directed by departmental officers etc., complete.
Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH
Supplying and laying Rubberised interlocking Paver block M40 grade Providing and laying of 83mm thick high strength type conforming IS 15658-2006 of rubberized interlocking paver lock in size of minimum compressive strength of 40N/mm2 in uniform shape of approved make to be laid in flurring bone pattern with sand cushion below the uniform shap of approved non skitting surface in the top and the rate including levelling the base preparation of pavers as sub base, sand cushion 100mm thick laying out of pavement cut the pieces to fix the edge vibring the pavers,sweeping tranporting loading unloading of laying paver block as per standard specification,.
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .