Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAdmitted-Finance | ₹1.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹6.1 L (5.82%)Admitted-Finance | ₹1.1 Cr+₹6.1 L (5.82%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 Cr+₹11.4 L (10.9%)Admitted-Finance 23 FLAT NO 1 RIVER VIEW APARTMENTS CRESCENT PARK 1ST STREET GANDHI NAGAR ADYAR CHENNAI 600020 | CHENNAI | CHENNAI | TAMIL NADU | 600020 | ₹1.2 Cr+₹11.4 L (10.9%) | L3 | Admitted-Finance |
| 4 | L4₹1.2 Cr+₹13.6 L (13.0%)Admitted-Finance 5 255 H E B COLONY SALAIPUDUR | MADURAI | TAMIL NADU | ₹1.2 Cr+₹13.6 L (13.0%) | L4 | Admitted-Finance |
| 5 | L5₹1.2 Cr+₹14.4 L (13.7%)Admitted-Finance 52 A CUDDALORE ROAD VRIDDHACHALAM 606 001 CUDDALORE DIST | VRIDDHACHALAM | CUDDALORE | TAMIL NADU | 606001 | ₹1.2 Cr+₹14.4 L (13.7%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M.S.Gnanam L1 | Manoharan L2 | Teems Engineering Construction L3 | V ALAGUDURAI L4 | ZIYAVUDEEN L5 | Samsudeen L6 | M.ALAGUPANDIAN L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Line works | ||||||||||
| 1.01 | Clearing juliflora jungle with uprooting including all cost of labour, lead, lift etc complete. | 6,000 | m2 | - | - | - | - | - | - | - |
| 2.00 | Conducting check survey,pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead lift etc complete. | 34 | Loc | - | - | - | - | - | - | - |
| 3.00 | Earthwork excavation in hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil inlcuding all cost of lead lift etc complete. | 3,703 | m3 | - | - | - | - | - | - | - |
| 4.00Transporting and fixing of stub and cleat with supply of template and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template ,labour, fabrication charges etc complete. (Stub and cleat only supplied by department) | ||||||||||
| 4.10 | GCO tower | 12 | loc | - | - | - | - | - | - | - |
| 4.20 | HCO tower | 6 | loc | - | - | - | - | - | - | - |
| 4.30 | KCO tower | 16 | Loc | - | - | - | - | - | - | - |
| 5.00 | PCC 1:2:4 using 20mm metal for foundation without formwork including cost of all materials lead lift etc complete. | 267 | m3 | - | - | - | - | - | - | - |
| 6.00 | PCC 1:2:4 using 20mm metal for foundation and chimney concrete with steel form box including cost of all materials, lead, lift,chimney box, etc complete . | 372 | m3 | - | - | - | - | - | - | - |
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
24 Aug 2020, 2:00 pmClosed
The Chief Engineer,TP-II/Trichy
O/o.The Chief Engineer, Transmission Projects II/Mannarpuram, Trichy.
Erection of towers and stringing of Panther Conductor and Earthwire for 110 KV DC line (7.535km)on DC towers from Nidur 110 KV SS to proposed Mayiladuthurai Railway traction KV SS .
2020_EB_174962_1
CE/TP-II/TRY/C-05/2020-21
Open Tender
Civil Works
Works
150 days
Mayiladuthurai
AS PER TENDER SPECIFICATION
4 documents required · 4 mandatory
₹0
₹1.5 L
Yes
1 Sept 2020
7 Aug 2020
25 Aug 2020
7 Aug 2020
24 Aug 2020
7 Aug 2020
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_209549.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .