| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical 208 9 CIVIL LINES SBI COLONY STATION ROAD BAREILLY 243001 | BAREILLY | BAREILLY | UTTAR PRADESH | 243001 | Accepted-Technical Qualified |
| 2 | Accepted-Technical | Accepted-Technical Qualified |
| 3 | Accepted-Technical 1 13 16 G KHAPARADEEH KOTHI CAMPUS CIVIL LINES AYODHYA UTTAR PRADESH 224001 | AYODHYA | AYODHYA | UTTAR PRADESH | 224001 | Accepted-Technical Qualified |
Tender Value
₹8.4 Cr
EMD Value
₹25.1 L
Closing Date
1 Jul 2026, 12:00 pmClosed
Chief Engineer
LDA Gomti Nagar, lko
Naimish nagar yojna ke sector 10 me isthit road ka nirman karya. Part E
2026_LDAUP_1163315_1
48/E-Nivida/CE/2026-27/3
Open Tender
Civil Works
Percentage
365 days
LDA Gomti Nagar, lko
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,366
Secretary LDA
₹25.1 L
27 Jul 2026
24 Jun 2026
2 Jul 2026
24 Jun 2026
1 Jul 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge., All kinds of soil | 4,441.88 | Cum | 140.22 | ₹6,22,839.71 |
| 2 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :, All kinds of soil, Pipes, cables etc. exceeding 300 mm dia but not exceeding 600 mm. | 110 | Nos | 434.28 | ₹47,770.8 |
| 3 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :, All kinds of soil, Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia | 5,261 | m | 278.18 | ₹14,63,504.98 |
| 4 | Extra for excavating trenches for pipes, cables etc. in ordinary / hard rock exceeding 1.5m in depth but not exceeding 3m.(Rate is over corresponding basic item for depth upto 1.5 metre)., Ordinary rock, Pipes, cables etc., exceeding 80 mm dia but not exceeding 300 mm dia. | 444.75 | m | 576.51 | ₹2,56,402.82 |
| 5 | Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered)., Depth not exceeding 1.5 m. | 8,895 | Sqm | 110.55 | ₹9,83,342.25 |
| 6 | Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered)., Depth exceeding 1.5 m but not exceeding 3 m. | 1,334.25 | Sqm | 122.68 | ₹1,63,685.79 |
| 7 | Extra for planking, strutting and packing materials for cavities (in close timbering) if required to be left permanently in position. (Face area of timber permanently left to be measured). | 66.71 | Sqm | 1,336.96 | ₹89,188.6 |
| 8 | Extra for excavating trenches for pipes, cables etc. in ordinary / hard rock exceeding 1.5m in depth but not exceeding 3m.(Rate is over corresponding basic item for depth upto 1.5 metre)., Hard rock, Pipes, cables etc., exceeding 80 mm dia but not exceeding 300 mm dia. | 690.44 | m | 862.19 | ₹5,95,287.88 |
| 9 | Open timbering in trenches including strutting and shoring complete (measurements to be taken of the face area timbered):, Open timbering in trenches including strutting and shoring complete (measurements to be taken of the face area timbered): Depth not exceeding 1.5 m. | 6,888 | Sqm | 56.92 | ₹3,92,064.96 |
| 10 | Open timbering in trenches including strutting and shoring complete (measurements to be taken of the face area timbered):, Depth exceeding 1.5 m but not exceeding 3 m. | 3,099.6 | Sqm | 64.46 | ₹1,99,800.22 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.65 MB
TD.pdf
Tender Documents • 5.78 MB
BOQ_2180829.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .