| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-AOC | ₹7.0 L | L1 | Accepted-AOC BID FOUND IN ORDER AND ADMITTED FOR FINANCIAL EVALUATION |
| 2 | L2₹7.1 L+₹9,644.78 (1.37%)Rejected-Finance | ₹7.1 L+₹9,644.78 (1.37%) | L2 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among three. |
| 3 | L3₹7.2 L+₹21,205.58 (3.02%)Rejected-Finance | ₹7.2 L+₹21,205.58 (3.02%) | L3 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among three. |
| Sl No | Description | Qty | Unit | M/s Praveen Kumar L3 | MS ANIL KUMAR CONSTRUCTION L2 | m/s pratap traders L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in dry soil including lift up to 1.5 m & lead up to 30 back filling,watering and ramming of excavated earth into the trenches and disposal of surplus earth as directed by the Engineer-in-charge | 86.3 | Cum | 130 ₹11,219 | 128 ₹11,046.4 | 127 ₹10,960.1 Lowest |
| 2.00 | ordinary centering and shuttering or steel shuttering for C.C. work including all cost of labour,material and T. & P. etc. complete | 15.66 | Sqm | 494 ₹7,736.04 | 486 ₹7,610.76 | 480 ₹7,516.8 Lowest |
| 3.00 | Laying C.C. M-15 with cement ,coarse sand & 10to 20 mm downgraded stone grit including cost of all material,labour and T & P etc. Complete | 6.6 | Cum | 5,955 ₹39,303 | 5,859 ₹38,669.4 | 5,781 ₹38,154.6 Lowest |
| 4.00 | Laying C.C. 1:6:12 Mix cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | 0.53 | Cum | 5,226 ₹2,769.78 | 5,141 ₹2,724.73 | 5,073 ₹2,688.69 Lowest |
| 5.00 | Brick work in 1:4 cement mortar in Abutment, Wing wall & Parapet etc.up to 3 m lift and 60 M lead including cost of all material, labour and T&P required for proper completion of work. | 35.12 | Cum | 5,381 ₹1,88,980.72 | 5,294 ₹1,85,925.28 | 5,223 ₹1,83,431.76 Lowest |
| 6.00 | Cement pointing in 1:2 cement mortar (struck deep) on brick masonary including cost of all material, labour and T&P etc. required for proper completion of work. | 43.39 | Sqm | 115 ₹4,989.85 | 113 ₹4,903.07 | 111 ₹4,816.29 Lowest |
| 7.00 | Centering and shuttering (steel shuttering) for R.C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | 32.58 | Sqm | 812 ₹26,454.96 | 799 ₹26,031.42 | 788 ₹25,673.04 Lowest |
| 8.00 | Reinforcement including cutting ,bending and binding in position including all cost of labour,material and T & P etc. required for proper completion of work. | 0.72 | MT | 64,359 ₹46,531.56 | 63,317 ₹45,778.19 | 62,470 ₹45,165.81 Lowest |
| 9.00 | Laying R.C.C. M-20 with cement ,coarse sand & 10 to 20 mm downgraded stone grit including cost of all material,labour and T & P etc. Complete | 7.84 | Cum | 6,825 ₹53,508 | 6,714 ₹52,637.76 | 6,625 ₹51,940 Lowest |
| 10.00 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit in wearing coat including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. | 1.72 | Cum | 7,644 ₹13,147.68 | 7,520 ₹12,934.4 | 7,420 ₹12,762.4 Lowest |
Tender Value
₹7.3 L
EMD Value
₹14,660
Closing Date
27 Apr 2026, 11:00 amClosed
RAJEEV KUMAR EXECUTIVE ENGINER
O/O EXECUTIE ENGINEER MADHYA GANGA CANAL CONSTRUCTION DIVISION-9 SAMBHAL
CONSTRUCTION OF V.R.B AT KM 0.485 OF CHHACHERA MINOR.
2026_UPIDC_1139101_1
01/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
45 days
CHHACHERA SAMBHAL
PLEASE REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹516
Yes
₹14,660
SAMBHAL
10 Jun 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
21 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation in dry soil including lift up to 1.5 m & lead up to 30 back filling,watering and ramming of excavated earth into the trenches and disposal of surplus earth as directed by the Engineer-in-charge | - | Cum | - | - |
| 2 | ordinary centering and shuttering or steel shuttering for C.C. work including all cost of labour,material and T. & P. etc. complete | - | Sqm | - | - |
| 3 | Laying C.C. M-15 with cement ,coarse sand & 10to 20 mm downgraded stone grit including cost of all material,labour and T & P etc. Complete | - | Cum | - | - |
| 4 | Laying C.C. 1:6:12 Mix cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | - | Cum | - | - |
| 5 | Brick work in 1:4 cement mortar in Abutment, Wing wall & Parapet etc.up to 3 m lift and 60 M lead including cost of all material, labour and T&P required for proper completion of work. | - | Cum | - | - |
| 6 | Cement pointing in 1:2 cement mortar (struck deep) on brick masonary including cost of all material, labour and T&P etc. required for proper completion of work. | - | Sqm | - | - |
| 7 | Centering and shuttering (steel shuttering) for R.C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | - | Sqm | - | - |
| 8 | Reinforcement including cutting ,bending and binding in position including all cost of labour,material and T & P etc. required for proper completion of work. | 1 | MT | - | - |
| 9 | Laying R.C.C. M-20 with cement ,coarse sand & 10 to 20 mm downgraded stone grit including cost of all material,labour and T & P etc. Complete | - | Cum | - | - |
| 10 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit in wearing coat including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.81 MB
Tendernotice_2.pdf
PDF • 3.60 MB
BOQ_2126839.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .