Loading…
Loading…
Updated dates
Tender Value
₹30.1 L
EMD Value
₹60,197
Closing Date
10 Jun 2026, 6:00 pm5d left
Garrison Engineer Gaya
Garrison Engineer Gaya Paharpur Mil Stn Gaya Bihar, PIN-823005
CONSTRUCTION OF 01 X NO NEW LAB ROOM IN KV CAMPUS GAYA
2026_MES_765173_1
8007/GE/26-27/E8
Open Tender
Civil Works
270 days
OTA Gaya
Please ref tender documents
8 documents required · 8 mandatory
₹500
GE Gaya
₹60,197
13 May 2026
13 May 2026
13 Jun 2026
13 May 2026
10 Jun 2026
27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | SCHEDULE 'A' PART-I (BUILDING WORKS)
NOTE: Schedule ‘A’ Part I to VII are Prepriced by MES. Bidders shall insert their lumpsum amount in the Green coloured field under Col-6 only. | - | - | - | - |
| 1.02 | Designing (Structurally & Aesthetically) and Construction of block of Lab building Single Storey of size 10.60m x 7.0m
and height 4M with RCC framed construction and permanent
specification having RCC design mix M-25, RCC framed
construction, anti termite treatment, mosquito proofing,
Waterproofing treatment on roof, kota stone flooring and AL door, windows and ventilators etc and as detailed in design basis report, scope of work and other documents of the tender complete.
Note-1: The Lab bldg. (Plinth area: =127.55 sqm and
height: 4M) shall consist of following:
(a)Lab room of size 10.60 mtr x 7.0 mtr
(b) 02 X Toilets area of size 3.40 mtr x 1.60 mtr with PVC door, aluminum ventilator, sanitary fittings and plumbing.
(c)Verandah 2.1m wide including bk parapet wall 0.90m high and steps with kota stone along both sides & middle portion etc. Schedule 'A' Part-I | 1 | Lump Sum | 25,18,192.65 | ₹25,18,192.65 |
| 1.03 | Lump sum price worked out by the Contractor for "INTERNAL Water Supply" as listed in Schedule 'A' Part-II | 1 | Lump Sum | 15,889.15 | ₹15,889.15 |
| 1.04 | Lump sum price worked out by the Contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule 'A' Part-III | 1 | Lump Sum | 2,34,700 | ₹2,34,700 |
| 1.05 | Lump sum price worked out by the Contractor for ROAD AND PATH" as listed in Schedule 'A' Part-IV | 1 | Lump Sum | 65,468.87 | ₹65,468.87 |
| 1.06 | Lump sum price worked out by the Contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule 'A' Part-V | 1 | Lump Sum | 39,900 | ₹39,900 |
| 1.07 | Lump sum price worked out by the Contractor for "EXTERNAL ELECTRIC SUPPLY" as listed in Schedule 'A' Part-VI | 1 | Lump Sum | 96,700 | ₹96,700 |
| 1.08 | Lump sum price worked out by the Contractor for "SEWAGE DISPOSAL" as listed in Schedule 'A' Part-VII | 1 | Lump Sum | 39,995.32 | ₹39,995.32 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Drg.pdf
Additional Documents • 4.26 MB
8007TENDERDOCUMENTS.pdf
Tender Documents • 2.04 MB
BOQ_857002.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid