Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.5 LAccepted-Finance 0 AJAY KUMAR 85 HASTAM HASTAM BANDA UTTAR PRADESH 210001 HASTAM BANDA UTTAR PRADESH 210001 UDYAM UP 13 0007628 | BANDA | UTTAR PRADESH | 210001 | L1 | Accepted-Finance Agreement With L1 | |
| 2 | L2₹21.2 L+₹70,467.51 (3.43%)Rejected-Finance | L2 | Rejected-Finance Agreement With L1 | |
| 3 | L3₹21.9 L+₹1.4 L (6.88%)Rejected-Finance | L3 | Rejected-Finance Agreement With L1 | |
| 4 | L4₹22.5 L+₹2.0 L (9.77%)Rejected-Finance | L4 | Rejected-Finance Agreement With L1 | |
| 5 | L5₹22.6 L+₹2.1 L (10.2%)Rejected-Finance A 51 SHALIMAR GARDEN EX 2 SAHIBABAD DISTRICT GHAZIABAD UTTAR PRADESH | SAHIBABAD | GHAZIABAD | UTTAR PRADESH | L5 | Rejected-Finance Agreement With L1 |
| Sl No | Description | Qty | Unit | ARTIST BRO L5 | MITTAL BROTHERS L3 | NARESH KUMAR L7 | M/S Harish Kumar Contractor L6 | M/s Ajay Kumar Contractor L1 | VK CONSTRUCTION L9 | M/S SHREE JEE CONSTRUCTIONS L2 | Akash Contractor L8 | M/S KUNJ BEHARI LAL CONTRACTOR L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material as per direction of Engineer-in-charge | 7 | M3 | 500 ₹3,498 | 500 ₹3,498 | 300 ₹2,098.8 | 439 ₹3,071.28 | 450 ₹3,148.2 | 516 ₹3,609.94 | 100 ₹699.6 Lowest | 492 ₹3,442.03 | 431.49 ₹3,018.73 |
| 2.00 | Earth work in foundation in dry ordinary soil i/c all lift & lead and i/c back filling ,watering & ramming of exavated earth in to tranch or in to the space between the structure & the side of foundation tranches or in to the plinth with removal & disposal or surplus earth as dircted by Engg.-in-Charge. | 174.18 | M3 | 70 ₹12,192.74 | 100 ₹17,418.2 | 30 ₹5,225.46 | 84.75 ₹14,761.92 | 9 ₹1,567.64 Lowest | 99 ₹17,244.02 | 20 ₹3,483.64 | 96 ₹16,721.47 | 83.3 ₹14,509.36 |
| 3.00 | Providing and laying C.C. (A-20 M15) (1:2:4) including all cost of materials, labour and T&P etc complete. | 26.33 | M3 | 5,500 ₹1,44,815 | 5,300 ₹1,39,549 | 6,100 ₹1,60,613 | 5,276.53 ₹1,38,931.17 | 4,500 ₹1,18,485 Lowest | 6,200 ₹1,63,246 | 4,500 ₹1,18,485 Lowest | 5,976 ₹1,57,348.08 | 5,263.41 ₹1,38,585.6 |
| 4.00 | Providing and laying C.C. (A-20 M20) (1:1.5:3) including all cost of materials, labour and T&P etc complete. | 39.58 | M3 | 6,500 ₹2,57,263.5 | 6,500 ₹2,57,263.5 | 7,300 ₹2,88,926.7 | 6,295.23 ₹2,49,158.91 | 6,300 ₹2,49,347.7 | 7,400 ₹2,92,884.6 | 6,500 ₹2,57,263.5 | 7,120 ₹2,81,802.48 | 6,265.22 ₹2,47,971.06 Lowest |
| 5.00 | Providing and laying R.C.C. (A-20 M25) (1:1:2) including all cost of materials, labour and T&P etc complete. | 93.94 | M3 | 7,000 ₹6,57,559 Lowest | 7,300 ₹6,85,740.1 | 8,150 ₹7,65,586.55 | 7,098.66 ₹6,66,826.82 | 7,200 ₹6,76,346.4 | 8,400 ₹7,89,070.8 | 7,800 ₹7,32,708.6 | 8,020 ₹7,53,374.74 | 7,054.33 ₹6,62,662.33 |
| 6.00 | Providing and laying C.C. (A-20 M25) (1:1:2) including all cost of materials, labour and T&P etc complete. | 3.04 | M3 | 7,000 ₹21,287 | 7,300 ₹22,199.3 | 7,200 ₹21,895.2 | 6,552.02 ₹19,924.7 | 7,200 ₹21,895.2 | 7,790 ₹23,689.39 | 7,500 ₹22,807.5 | 7,498 ₹22,801.42 | 6,517.04 ₹19,818.33 Lowest |
| 7.00 | Shuttering for R.C.C. work - For Bridge Slabs up to 3M span. | 50.52 | M2 | 650 ₹32,837.35 | 600 ₹30,311.4 | 450 ₹22,733.55 | 728.85 ₹36,820.77 | 180 ₹9,093.42 Lowest | 855 ₹43,193.74 | 500 ₹25,259.5 | 815 ₹41,172.99 | 716.38 ₹36,190.8 |
| 8.00 | Shuttering for R.C.C. work - T-beam bridge, syphon,aqueduct & box culvert above 3M span | 270.71 | M2 | 650 ₹1,75,960.2 | 600 ₹1,62,424.8 | 780 ₹2,11,152.24 | 974.62 ₹2,63,838.78 | 180 ₹48,727.44 Lowest | 1,150 ₹3,11,314.2 | 600 ₹1,62,424.8 | 1,095 ₹2,96,425.26 | 957.95 ₹2,59,324.73 |
| 9.00 | Supplying and laying TMT Steel bar (Of SAIL/TATA TISCON MAKE.) reinforcement (Fe-550D) including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required.The item includes cost of all material, labour charges, providing & binding with 24 BWG binding wire, T&P, taxes etc. required for proper completion of the required work. | 8.57 | M.T. | 75,000 ₹6,43,125 | 80,000 ₹6,86,000 | 72,000 ₹6,17,400 | 63,211.64 ₹5,42,039.77 | 99,000 ₹8,48,925 | 74,610 ₹6,39,780.75 | 80,000 ₹6,86,000 | 70,880 ₹6,07,796 | 62,155.21 ₹5,32,980.94 Lowest |
| 10.00 | S/F 110 mm dia P.V.C. Pipe Spout including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge. | 11 | R.M. | 100 ₹1,100 Lowest | 100 ₹1,100 Lowest | 250 ₹2,750 | 237.3 ₹2,610.3 | 450 ₹4,950 | 279 ₹3,069 | 200 ₹2,200 | 266 ₹2,926 | 233.24 ₹2,565.64 |
Tender Value
₹27.0 L
EMD Value
₹54,020
Closing Date
25 Aug 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
OFFICE OF THE EXECUTIVE ENGINEER ANOOPSHAHAR BRANCH DIVISION GANGA CANAL MEERUT
TN-05/EE/2026-27 Reconstruction work of the damaged bridge located at Km 33.400 of Upper Parikshitgarh Rajbaha.Lot No-03
2026_UPIDC_1176988_3
TN-05/EE/2026-27
Open Tender
Civil Works
Piece-work
90 days
As Per NIT
As per NIT and TD
3 documents required · 3 mandatory
₹944
₹54,020
25 Sept 2026
14 Aug 2026
25 Aug 2026
14 Aug 2026
25 Aug 2026
14 Aug 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material as per direction of Engineer-in-charge | - | M3 | - | - |
| 2 | Earth work in foundation in dry ordinary soil i/c all lift & lead and i/c back filling ,watering & ramming of exavated earth in to tranch or in to the space between the structure & the side of foundation tranches or in to the plinth with removal & disposal or surplus earth as dircted by Engg.-in-Charge. | 0.8 | M3 | - | - |
| 3 | Providing and laying C.C. (A-20 M15) (1:2:4) including all cost of materials, labour and T&P etc complete. | 1 | M3 | - | - |
| 4 | Providing and laying C.C. (A-20 M20) (1:1.5:3) including all cost of materials, labour and T&P etc complete. | - | M3 | - | - |
| 5 | Providing and laying R.C.C. (A-20 M25) (1:1:2) including all cost of materials, labour and T&P etc complete. | 0.8 | M3 | - | - |
| 6 | Providing and laying C.C. (A-20 M25) (1:1:2) including all cost of materials, labour and T&P etc complete. | 1 | M3 | - | - |
| 7 | Shuttering for R.C.C. work - For Bridge Slabs up to 3M span. | 1 | M2 | - | - |
| 8 | Shuttering for R.C.C. work - T-beam bridge, syphon,aqueduct & box culvert above 3M span | 0.2 | M2 | - | - |
| 9 | Supplying and laying TMT Steel bar (Of SAIL/TATA TISCON MAKE.) reinforcement (Fe-550D) including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required.The item includes cost of all material, labour charges, providing & binding with 24 BWG binding wire, T&P, taxes etc. required for proper completion of the required work. | 1 | M.T. | - | - |
| 10 | S/F 110 mm dia P.V.C. Pipe Spout including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge. | - | R.M. | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.40 MB
Tendernotice_2.pdf
PDF • 1.99 MB
BOQ_2211882.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .