| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Finance | -27.50% | ₹2.2 L | L1 | Admitted-Finance |
| 2 | L2₹2.6 L+₹37,678.38 (17.2%)Admitted-Finance | -15.01% | ₹2.6 L+₹37,678.38 (17.2%) | L2 | Admitted-Finance |
| 3 | L3₹2.6 L+₹40,423.57 (18.5%)Admitted-Finance | -14.10% | ₹2.6 L+₹40,423.57 (18.5%) | L3 | Admitted-Finance |
Tender Value
₹3.6 L
EMD Value
₹7,120
Closing Date
18 Aug 2026, 6:00 pmClosed
Vipin Kumar Jindal Executive Engineer
Executive Engineer PWD City Dn Ajmer
Construction of Retaining wall in Main Building for Circuit House Ajmer (Addl. Work)
2026_CEPWD_589450_2
NIT No 19 of 2025-26 of EE PWD City Dn. Ajmer
Open Tender
Civil Works
Percentage
60 days
Ajmer
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
EE PWD CITY DN AJMER (16725)/ MD RISL JAIPUR
₹7,120
Yes
10 Sept 2026
17 Aug 2026
19 Aug 2026
17 Aug 2026
18 Aug 2026
17 Aug 2026
17 Aug 2026 - 18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Particular | |||||
| 1.01 | Add extra for Fixing glazed/ Ceramic/ Vitrified floor tiles with cement based high polymer modified quick-set tile adhesive (Water based) conforming to IS: 15477 , using 5kg. adhesive per sqm of tile area, in average 3mm thickness instead of cement mortar. | 139 | Sqm | 141 | ₹19,599 |
| 1.02 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - M10 grade Nominal Mix
1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). | 20.85 | Cum | 4,616.4 | ₹96,251.94 |
| 1.03 | Random rubble dry stone Kharanja under floor. | 31.97 | Cum | 1,118 | ₹35,742.46 |
| 1.04 | Supplying and Filling in plinth with blown sand under floors including watering ramming consolidating and dressing complete including cost of sand. | 333.5 | Cum | 450 | ₹1,50,075 |
| 1.06 | Abstract of Cost as Per Rate Quoted by Contractor | - | - | - | - |
| 1.07 | Tender Amount Civil as Per Schedule "G" | - | - | - | - |
| 1.08 | G.S.T @ 18% as per Finance Order | - | - | - | - |
| 1.09 | Total Tender Amount as per rate Quoted by Contractor | - | - | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.01 MB
Tendernotice_2.pdf
PDF • 11.84 MB
Tendernotice_3.pdf
PDF • 11.84 MB
Tendernotice_4.pdf
PDF • 14.13 MB
Tendernotice_5.pdf
PDF • 5.83 MB
BOQ_1046811.xls
BOQ • 0.29 MB
nit.pdf
Tender Documents • 1.99 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .