Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.8 LAdmitted-Fee/PreQual/Technical/Finance | -39.03% | ₹5.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.9 L+₹9,888 (1.71%)Admitted-Fee/PreQual/Technical/Finance | -37.99% | ₹5.9 L+₹9,888 (1.71%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.0 L+₹23,484.01 (4.05%)Admitted-Fee/PreQual/Technical/Finance | -36.56% | ₹6.0 L+₹23,484.01 (4.05%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹6.1 L+₹30,709.86 (5.30%)Admitted-Fee/PreQual/Technical/Finance | -35.80% | ₹6.1 L+₹30,709.86 (5.30%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹6.5 L+₹74,445.25 (12.8%)Admitted-Fee/PreQual/Technical/Finance | -31.20% | ₹6.5 L+₹74,445.25 (12.8%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹11.2 L
EMD Value
₹22,440
Closing Date
3 Apr 2026, 4:00 pmClosed
Executive Engineer PWD Rnb Division Pahalgam.
Executive Engineer PWD Rnb Division Pahalgam.
Construction of katha Pandala temporary at Nunwan base Camp
2026_PWDJK_305624_8
ENIT NO 225 of 2025-26
Open Tender
Civil Works - Highways
Percentage
100 days
PAHALGAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD Rnb Division Pahalgam.
₹22,440
18 Apr 2026
9 Mar 2026
4 Apr 2026
9 Mar 2026
3 Apr 2026
9 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides
and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:
All kinds of soil : | 41.63 | Cum | 225.18 | ₹9,374.24 |
| 2 | Supplying and laying of quarry stone soling hand packed tightly incl ramming watering and filling of interstices incl all carriage complete job | 8.5 | Cum | 847.46 | ₹7,203.41 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) incl all carriage complete job | 8.5 | Cum | 4,561.36 | ₹38,771.56 |
| 4 | Providing and laying in position cement concrete flooring of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4(1 cement : 2coarse sand : 4graded stone aggregate 20 mm nominal size) incl all carriage complete job | 29.1 | Cum | 5,778.52 | ₹1,68,154.93 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for :Foundations: footings, bases of columns etc. for mass concrete. | 102 | Sqmtr | 251.04 | ₹25,606.08 |
| 6 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position including welding etc and applying a priming coat of approved steel primer all complete.). (Sail or Jindal or equivalent brand) | 825 | Kgs | 121.42 | ₹1,00,171.5 |
| 7 | Carriage of Steel from Divisional Store to Nunwan Base Camp and steel wood sheds and ply back to store | 15 | trips | 338.98 | ₹5,084.7 |
| 8 | Providing and fixing of Hi rib color coated CGI roofing incl all connected charges for complete job incl Ridges and Valleys | 27 | sqm | 974.58 | ₹26,313.66 |
| 9 | Fixing of available Hi rib color coated CGI roofing incl all connected charges for complete job Ridges and Valleys | 63 | sqm | 296.61 | ₹18,686.43 |
| 10 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): Popular WOOD | 2.6 | Cum | 29,661.02 | ₹77,118.65 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
BOQ_992508.xls
BOQ • 0.27 MB
ext225.pdf
PDF • 0.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .