| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.5 CrAccepted-AOC | ₹1.5 Cr | 1 | Accepted-AOC RANK 1 |
| 2 | 2₹1.6 Cr+₹6.6 L (4.32%)Rejected-Finance 443 V P O PUTHI 131301 | PUTHI | SONIPAT | HARYANA | 131301 | ₹1.6 Cr+₹6.6 L (4.32%) | 2 | Rejected-Finance RANK 2 |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
28 Apr 2025, 10:00 amClosed
XEN LDH CANAL AND GW LUDHAINA DUGRI PHASE 1 LUDHIA
XEN LDH CANAL AND GW LUDHAINA DUGRI PHASE 1 LUDHIANA
Estimate for Construction/Renovation of the water courses of outlet at RD 94300/L Illahiwah Disty (Open watercourse)
2025_WR_138620_8
1400/28A
Open Tender
Civil Works - Canal
Item Rate
60 days
Illahiwah Disty
Estimate for Construction/Renovation of the water courses of outlet at RD 94300/L Illahiwah Disty (Open watercourse)
2 documents required · 2 mandatory
₹2,000
₹2.4 L
Yes
XEN LDH CANAL AND GW LUDHAINA DUGRI PHASE 1 LUDHIA
23 May 2025
12 Apr 2025
28 Apr 2025
12 Apr 2025
28 Apr 2025
12 Apr 2025
21 Apr 2025
Amount
Earth work excavation in ordinary soil, exclusive of compensation of earth: ((a)) Kassi work undressed involving an average horizontal throw up to 2.0 metres and an average vertical lift up to 0.5 metres including breaking of clods.
Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods.
Dressing of earth work: New work or remodeling work.
Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed.
Re-handling of earthwork recently executed
Earthwork for compaction in 20 cm layers and dressing., Extra for watering the earth., Extra for rolling to specifications.
Earth work in excavation in foundations trenches etc. where Pick-Jumper work is not involved
Dag belling single kassi stroke minimum 7.5 cm depth.
Dismantling Brick Work in Cement
Dressing of Bed and Preparation of Sub-grade for Lining
First Class Burnt Brick laid in 1:6 Cement Sand Mortar for Bed & Side walls
Cement Conc. 1:4:8 with brick ballast
Cement Conc. 1:2:4 for bed
10 mm thick Cement Plaster 1:4 on Side Walls
10 mm thick Cement Plaster 1:4 on Floors
RCC work hand mixed 1:2:4 for slab including steel reinforcement
Shuttering for faces of Concrete foundations and foundation beam & plinth beam (Vertical or battering)
Providing & placing of Steel foot steps complete Item no. (29.35)
Providing lowering and joining RCC Pipe 450 mm dia in trenches and laying same to correct alignment (complete) as per IS 456-2003
Fixing of frame
Supplying & Laying Dry Brick Bats
Earth filling (b (i)) Earth work (exclusive of compensation for earth) in excavation in ordinary soil or soil containing gravel or kankar upto 40% and filling in 15 cm layers in foundation and plinth including ramming watering and consolidating under floors with earth brought from a distance not exceeding 30 metres
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads
RCC work hand mixed for slab excluding steel reinforcement
Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete
MOHAN LAL (BID ID -638445)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .