Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.8 LAccepted-AOC | 1 | Accepted-AOC Qualified as L1 | |
| 2 | 2₹4.0 L+₹19,862 (5.21%)Rejected-AOC | 2 | Rejected-AOC Qualified as L2 | |
| 3 | 3₹4.0 L+₹21,521 (5.64%)Rejected-AOC | 3 | Rejected-AOC Qualified as L3 | |
| 4 | 4₹4.4 L+₹60,239 (15.8%)Rejected-AOC | 4 | Rejected-AOC Qualified as L4 | |
| 5 | 5₹4.7 L+₹91,229 (23.9%)Rejected-AOC | 5 | Rejected-AOC Qualified as L5 |
| Sl No | Description | Qty | Unit | manzoor ahmad khan L2 | BABY IRSHADIA L4 | M/S ADIL HUSSAIN ITOO L7 | M/S MOHAMMAD IQBAL DEVA L3 | MOHAMMAD AMIN TELI L1 | GENIUS ENGINEERS L6 | M/S MOHAMMAD AYOUB MIR L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Construction of Irrigation Channel and retaining wall at Germ Plasm Bank of Medicinal and Aromatic plants at Verinag Anantnag for the year 2025-26 | ||||||||||
| 1.01 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 1 metres: All kinds of soil | 75.72 | Cum | 180 ₹13,629.6 | 300 ₹22,716 | 180 ₹13,629.6 | 100 ₹7,572 Lowest | 180 ₹13,629.6 | 200 ₹15,144 | 200 ₹15,144 |
| 1.02 | Providing and laying of Stone soling, Hand packed, ,levelling ,filling of voids including all leads , lifts & carriage of same upto site of work complete | 20.29 | Cum | 600 ₹12,174 | 600 ₹12,174 | 1,100 ₹22,319 | 400 ₹8,116 Lowest | 600 ₹12,174 | 700 ₹14,203 | 700 ₹14,203 |
| 1.03 | Centring and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases of columns etc. for mass concrete. | 307.2 | Sqm | 130 ₹39,936 | 150 ₹46,080 | 200 ₹61,440 | 150 ₹46,080 | 100 ₹30,720 Lowest | 130 ₹39,936 | 175 ₹53,760 |
| 1.04 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 20.29 | Cum | 3,550 ₹72,029.5 | 4,900 ₹99,421 | 4,500 ₹91,305 | 3,500 ₹71,015 Lowest | 3,700 ₹75,073 | 4,950 ₹1,00,435.5 | 4,000 ₹81,160 |
| 1.05 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 57.78 | Cum | 4,250 ₹2,45,565 | 4,000 ₹2,31,120 Lowest | 5,500 ₹3,17,790 | 4,500 ₹2,60,010 | 4,200 ₹2,42,676 | 5,300 ₹3,06,234 | 5,300 ₹3,06,234 |
| 1.06 | Carriage of material for all materials like sand and coarse aggregate 20 mm | 1 | Job | 17,800 ₹17,800 | 30,000 ₹30,000 | 4,000 ₹4,000 | 10,000 ₹10,000 | 7,000 ₹7,000 | 10,000 ₹10,000 | 2,000 ₹2,000 Lowest |
Tender Value
₹6.5 L
EMD Value
₹12,980
Closing Date
16 Sept 2025, 2:00 pmClosed
ASCO Anantnag
anantnag
Construction of Irrigation Channel and R/Wall at MAP Verinag Anantnag
2025_APD_287439_1
NIT07
Open Tender
Civil Works
Item Rate
20 days
Verinag Anantnag
registered
2 documents required · 2 mandatory
₹500
Assistant Soil Conservation Officer
₹12,980
18 Sept 2025
9 Sept 2025
16 Sept 2025
9 Sept 2025
16 Sept 2025
9 Sept 2025
9 Sept 2025 - 16 Sept 2025
Amount
Construction of Irrigation Channel and retaining wall at Germ Plasm Bank of Medicinal and Aromatic plants at Verinag Anantnag for the year 2025-26
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 1 metres: All kinds of soil
Providing and laying of Stone soling, Hand packed, ,levelling ,filling of voids including all leads , lifts & carriage of same upto site of work complete
Centring and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases of columns etc. for mass concrete.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Carriage of material for all materials like sand and coarse aggregate 20 mm
manzoor ahmad khan (BID ID -2514524)
M/S MOHAMMAD IQBAL DEVA (BID ID -2501459)
BABY IRSHADIA (BID ID -2509506)
M/S MOHAMMAD AYOUB MIR (BID ID -2508320)
GENIUS ENGINEERS (BID ID -2508318)
M/S ADIL HUSSAIN ITOO (BID ID -2514666)
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .