| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.8 LAccepted-AOC | ₹26.8 L | L1 | Accepted-AOC L1 Lowest |
| 2 | L2₹26.8 LRejected-Finance | ₹26.8 L | L2 | Rejected-Finance L2 Lowest |
| Sl No | Description | Qty | Unit | Aravindh T L2 | N Vijayabaskar L1 |
|---|---|---|---|---|---|
| 1.00Part.01.Construction of 60000 Ltr OHT in Anna Nagar ( PUE School campus ) at Paruthicheri Panchayat | |||||
| 2.00 | Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges etc., complete and as directed by TWAD board Officers(First Depth) | 121.68 | Cu.m | 263.8 ₹32,099.18 | 263 ₹32,001.84 |
| 3.00 | Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges etc., complete and as directed by TWAD board Officers(Second Depth) | 33.46 | Cu.m | 263.8 ₹8,826.75 | 263 ₹8,799.98 |
| 4.00 | Sand filling for foundation with clear river sand including cost of sand, watering ,ramming and consolidation etc complete as directed by TWAD Board officers | 12.17 | Cu.m | 2,520 ₹30,668.40 | 2,520 ₹30,668.40 |
| 5.00 | Plain Cement Concrete 1:4:8 (one cement, four sand and eight hard granite broken stone of 40mm size ISS gauge) for foundation and footing including mixing, placing, ramming ,finishing curing etc. complete in accordance with standard specification and as directed by the TWAD Board Officers. | 12.17 | Cu.m | 6,425 ₹78,192.25 | 6,423 ₹78,167.91 |
| 6.00Reinforced Cement Concrete Mix M30 grade using 10mm & 20mm Hard blue granite Broken stone (machine crushed) excluding the cost of RTS rods for reinforcement and centering, strutting, shuttering but including cost of all materials mixing, laying, Vibrating the concrete with mechanical vibrators, ramming, consolidating, finishing and curing etc., Complete and as directed by the TWAD Board Officers. | |||||
| 7.00 | For items 1.5m to 4.5m below GL | 34.66 | Cu.m | 8,092 ₹2.8 L | 8,091 ₹2.8 L |
| 8.00 | For items 0 to 1.50m below GL | 2.78 | Cu.m | 8,092 ₹22,495.76 | 8,090 ₹22,490.20 |
| 9.00 | For items 0m to 4.5m above GL | 3.76 | Cu.m | 8,225 ₹30,926 | 8,223 ₹30,918.48 |
| 10.00 | For items 4.50m to 7.32m above GL | 3.27 | Cu.m | 8,592 ₹28,095.84 | 8,590 ₹28,089.30 |
Tender Value
₹27.1 L
EMD Value
₹27,050
Closing Date
25 Feb 2026, 3:00 pmClosed
Block Development officer(VP)
Block Development officer(VP),Panchayat union,Thiruvidaimarudhur
Construction of 60000 Ltr OHT in Anna Nagar ( PUE School campus ) at Paruthicheri Panchayat Under Valartchi Kattana Nidhi-2025-26 Thiruvidaimarudhur Block Thanjavur District
2026_RDTN_662067_1
Rc.No.335/2022/A6 Dated.24.02.2026
Open Tender
Civil Works - Water Works
365 days
Paruthicheri
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹27,050
14 May 2026
20 Feb 2026
25 Feb 2026
20 Feb 2026
25 Feb 2026
20 Feb 2026
Part.01.Construction of 60000 Ltr OHT in Anna Nagar ( PUE School campus ) at Paruthicheri Panchayat
Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges etc., complete and as directed by TWAD board Officers(First Depth)
Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges etc., complete and as directed by TWAD board Officers(Second Depth)
Sand filling for foundation with clear river sand including cost of sand, watering ,ramming and consolidation etc complete as directed by TWAD Board officers
Plain Cement Concrete 1:4:8 (one cement, four sand and eight hard granite broken stone of 40mm size ISS gauge) for foundation and footing including mixing, placing, ramming ,finishing curing etc. complete in accordance with standard specification and as directed by the TWAD Board Officers.
Reinforced Cement Concrete Mix M30 grade using 10mm & 20mm Hard blue granite Broken stone (machine crushed) excluding the cost of RTS rods for reinforcement and centering, strutting, shuttering but including cost of all materials mixing, laying, Vibrating the concrete with mechanical vibrators, ramming, consolidating, finishing and curing etc., Complete and as directed by the TWAD Board Officers.
For items 1.5m to 4.5m below GL
For items 0 to 1.50m below GL
For items 0m to 4.5m above GL
For items 4.50m to 7.32m above GL
For items 7.32m to 10.98m above GL
For items 10.98m to 14.64m above GL
For items above 14.64m & up to 18.30m from GL
Supply and erection of steel centering, shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG10 stiffened with MS angle of size 25 X 25 X 3 mm for boarding laid over I type MS Truss of size 25 X 25 X 3mm about 90cm c/c and supported by 40mm GI pipes (Medium) spaced at 75cm c/c etc complete and as directed by the TWAD Board Officers.
Plane Surface - Below G.L.
ABOVE G.L. to 3.30m
Square column - Below GL and upto 3.30m above GL
3.31m to 4.30m ht
Curved Surface - 11.30m to 12.30m
Supplying, cutting, bending, tying, fabricating and placing in position of steel rods for all RCC works including cost of steel and binding wire etc.( The steel should conform to the relevant ISspecification and supplied with test certificate Fe. 415 grade as per IS specification No.1786/1985 and as amended from time to time) delivery at site of work including loading, freight, unloading, stacking, transit insurance charges, taxes etc. complete.and as directed by the TWAD Board officers.
Painting two coats with approved Emulsion paint over one priming coat of white cement over cement plastered wall surface and ceiling including cleaning preparing the surface and curing etc., complete (using cement paint of colour as approved by the Departmental officer) and as directed by the TWAD Board officers.
Supply delivery and fixing of staircase with M30 grade concrete for landings, MS ladder of 0.45m wide using 50x50x5mm MS angles for sides and steps at 0.30m c/c, with GI pipe handrails using 32mm GI pipes for railings and verical support at 0.45m C/c, MS flats (Size 40mm x 5mm ) for horizontal ties at 0.3m c/c and at bottom with Anchor fastener bolts of size 12mm x 75mm including cost of materials labour for fabrication of handrails fixing, painting etc., complete.
Providing and fixing of RCC inner access ladder in RCC 1:11/2 :3 (one cement,one and half sand and three aggregate) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centring,shuttering charges, mixing concrete,curing etc. to required height and clear width of 45 cm consisting of 2 nos. of vertical post of 10 cm x 15 cm and step slab of 25mm x 25mm etc.complete and as directed by TWAD Board Officers.
Providing 110mm PVC vent cowl arrangements mosquito proof nylon net and as directed by TWAD Board officers
Supply and fixing of cut stone of size 0.30m x 0.30m x 0.15m in CM 1;3(one cement and three sand) below inlet pipe for Service Reservoir as directed by TWAD Board Officers.
Providing manhole cover of size 0.60 x 0.60M in RCC 1:1.5:3 with suitable reinforcement and 50x50x6mm MS angle fixed along edges and as directed by TWAD Board officers
Painting TWAD Board emblem on the SR with enamel paint as per Board's specification and as directed by TWAD Board officers
Pipe connection arrangements for inlet,outlet,scour and overflow etc. including cost of pipes,specials,valve,labour charges for lifting, aligning, cutting, threading ,fixing and painting of GI pipes with two coats of approved quality enamal paint etc. complete as detailed below.-65mm GI Pipe
65mm GI pipes for over flow & rain water harvesting pipe
50mm GI pipes for scour pipe
65mm GI pipe for delivery pipe
90mm PVC Threaded coupler
63mm PVC Threaded coupler
65mm dia GI Tee
65mm dia GI bend 90
65mm GI coupler
65mm GI union
65mm GI Elbow
50mm GI union
50mm GI Elbow
65mm GI Tee
65x50mm GI reducer
75x63mm PVC reducer
65mm GM gate valve
50mm GM gate valve
63 mm PVC 4Ksc Pipe
Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers
Provision For Chlorinator
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
PRICE_01.pdf
Tender Documents • 0.53 MB
TECH_01.pdf
Tender Documents • 0.92 MB
BOQ_794759.xls
BOQ • 0.32 MB