| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-Finance | ₹1.1 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.2 Cr+₹11.3 L (10.1%)Rejected-Finance 78 ETAH UTTAR PRADESH | ETAH | UTTAR PRADESH | 207001 | ₹1.2 Cr+₹11.3 L (10.1%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical VILLAGE ISLAM PUR BISHNOI ALIAS BISHNOI WALA PO MAHESHRI JAAT TEHSIL NAGINA DISTRICT BIJNOR | BIJNOR | UTTAR PRADESH | 246701 | - | - | Rejected-Technical NON RESPONSIVE |
Tender Value
₹1.1 Cr
EMD Value
₹2.3 L
Closing Date
18 May 2026, 12:00 pmClosed
SE RED ALIGARH
OFFICE OF SE RED ALIGARH
Construction of link road from village Galarpur to Fardpura.
2026_REDUP_1137149_32
36/SE/RED/TAVY/ETAH/09-04-2026
Open Tender
Civil Works - Roads
Percentage
270 days
ETAH
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,500
₹2.3 L
24 Aug 2026
12 May 2026
18 May 2026
12 May 2026
18 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201. | - | Sqm. | 2 | - |
| 2 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 | 0.2 | Cum | 87.4 | ₹17.39 |
| 3 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 5000 m as per Technical Specification Clause 301.5 | - | Cum. | 224.8 | - |
| 4 | Providing concrete Nominal mix 1:5:10 for Cement concrete (1 Cement : 5 Coarse sand : 10 Stone Aggregate ) in open foundations complete as per drawings and technical specifications | 1 | Cum | 5,349.7 | ₹5,344.35 |
| 5 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheeled roller to achieve the desired density, complete as per clause 401. | 0.6 | Cum | 3,501 | ₹2,100.6 |
| 6 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. | - | Cum | 4,611 | - |
| 7 | Providing, laying, spreading and compacting stone aggregates of specific sizes 22.4-53mmto water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification Clause 405. | - | Cum | 4,597 | - |
| 8 | Brick edging on both sides of road in Ist class brick 8cm (3") Cm (4½") deep laid with mud mortar including labour and supply of bricks finished to required template proper alignment and also including dressing and ramming the excavated earth as directed by Eng.-in-charge. Deduct -10" mtr length for RCC Culvert slab portion (all from Ch-20 SI.No-4) | - | Km | 80,000 | - |
| 9 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 | - | Sqm. | 44.8 | - |
| 10 | Providing and applying tack coat with Bitumen (VG 10) using Bitumen pressure distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | - | Sqm. | 16.9 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BOQ_2147576.xls
BOQ • 0.29 MB
5.pdf
Tender Documents • 4.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .