| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.9 LAccepted-AOC | ₹47.9 L | L1 | Accepted-AOC ist |
| 2 | L2₹54.1 LRejected-AOC 2ND FLOOR 15 BHULLAR AVENUE ADJOINING SBI FATEHGARH CHURIAN ROAD AMRITSAR PUNJAB 143001 | AMRITSAR | AMRITSAR | PUNJAB | 143001 | ₹54.1 L | L2 | Rejected-AOC 2nd |
| Sl No | Description | Qty | Unit | JAGSON CONSTRUCTIONS LTD L2 | The Nangal Bagwan Coop LC Soceity ltd L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth | 2,388.13 | Cum | 160 ₹160 | 157 ₹157 |
| 2.00 | Earthwork excavation in foundation, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and side of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres. | 110.15 | Cum | 200 ₹200 | 196 ₹196 |
| 3.00 | Dressing of Dowel in addition to payment for dressed earthwork. | 2,286.59 | Rm | 5 ₹5 | 5 ₹5 |
| 4.00 | Dag Belling single kassi stroke complete in all respect | 2.29 | Km | 900 ₹900 | 885 ₹885 |
| 5.00 | Laying cement water slurry 1:3, with cement @ 2.25 kg/sqms as on prepared side slopes before laying concrete on side slopes. | 8,225.34 | Sqm | 30 ₹30 | 29 ₹29 |
| 6.00 | Providing and laying Cement concrete lining 60 mm thick laid manually for irrigation channels, using cement concrete (M-15) with cement content 325 kg/cum mixed in automatic computerized batching and mixing Plant and transported to the site in transit mixers with an average lead of 1 km. | 138.53 | Cum | 7,000 ₹7,000 | 6,950 ₹6,950 |
| 7.00 | Providing and laying cement concrete M-15 for coping mixed in automatic computerised batching and mixing plant and transported to the site in transit mixers complete in all respect in PWD specifications | 94.99 | Cum | 7,000 ₹7,000 | 6,955 ₹6,955 |
| 8.00 | Providing and laying cement concrete M-15 for Sleeper mixed in automatic computerised batching and mixing plant and transported to the site in transit mixers complete in all respect in PWD specifications | 23.34 | Cum | 6,000 ₹6,000 | 5,980 ₹5,980 |
| 9.00 | Filling Contraction Joint with sealing compound complete in all respect | 2,168.98 | Metre | 3 ₹3 | 3 ₹3 |
| 10.00 | Filling expansion joint with Sealing Compound. complete in all respect | 5.79 | Metre | 5 ₹5 | 5 ₹5 |
Tender Value
₹47.3 L
EMD Value
₹94,501
Closing Date
7 Feb 2025, 12:00 pmClosed
XEN GURDASPUR
Executive Engineer, Canal and Ground Water Division WRD,Punjab,Gurdaspur.
ESTIMATE FOR REHABLITATION, RENOVATION AND MODERNIZATION OF GHESAL DISTRIBUTARY FROM RD 0 TO 7500 TAIL UNDER MNREGA SCHEME
2024_WR_132081_3
55/110A
Open Tender
Civil Works - Canal
210 days
GURDASPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
₹94,501
Yes
5 Mar 2026
27 Jan 2025
7 Feb 2025
27 Jan 2025
7 Feb 2025
27 Jan 2025
Amount
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth
Earthwork excavation in foundation, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and side of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres.
Dressing of Dowel in addition to payment for dressed earthwork.
Dag Belling single kassi stroke complete in all respect
Laying cement water slurry 1:3, with cement @ 2.25 kg/sqms as on prepared side slopes before laying concrete on side slopes.
Providing and laying Cement concrete lining 60 mm thick laid manually for irrigation channels, using cement concrete (M-15) with cement content 325 kg/cum mixed in automatic computerized batching and mixing Plant and transported to the site in transit mixers with an average lead of 1 km.
Providing and laying cement concrete M-15 for coping mixed in automatic computerised batching and mixing plant and transported to the site in transit mixers complete in all respect in PWD specifications
Providing and laying cement concrete M-15 for Sleeper mixed in automatic computerised batching and mixing plant and transported to the site in transit mixers complete in all respect in PWD specifications
Filling Contraction Joint with sealing compound complete in all respect
Filling expansion joint with Sealing Compound. complete in all respect
Providing & Fixing Boundary Pillars
Providing & Fixing Distance Marks
Providing & Fixing Outlets
Photograpy,Videography, Testing charges,survey equipment etc
Excavation of Soil using Hydraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations including all lifts and leads.
Extra for laying earthwork as per specification for compaction in 20 cm layer and dressing including cost of rolling and watering as per specification. (i) Extra for laying earth/fly ash as per specifications in 20 cm. Layers and dressing but excluding cost of rolling.
Extra for watering the earth/fly ash laid in 20 cm layers as per specifications for compaction.
Extra for rolling to specification
Applying Bitumen Primer coat on side of lining and top of sleeper for construction joint, Expansion Joint & Contraction Joint. Complete in all respect.
JAGSON CONSTRUCTIONS LTD (BID ID -613617)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid