Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.4 LAccepted-AOC | L1 | Accepted-AOC as per bid committee decision | |
| 2 | L1₹29.5 LAccepted-AOC | L1 | Accepted-AOC as per bid committee decision |
Tender Value
₹50.4 L
EMD Value
₹1.0 L
Closing Date
4 Mar 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer Nagaon Circle
Superintending Engineer Nagaon Circle Irrigation
INTEGRATED IRRIGATION PROJECT ON KOLLONG BASIN_RENOVATION OF PHULAGURI _RB ILP SCHEME UNDER SOPD_G FOR THE YEAR 2022_23_pkg1
2023_ID_29456_1
SEI/T-27/ET-9/2022-23/785
Open Tender
Civil Works
Item Rate
90 days
raha
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹1.0 L
Yes
9 May 2023
22 Feb 2023
4 Mar 2023
22 Feb 2023
4 Mar 2023
22 Feb 2023
Amount
Repairing of Main Canal Bed and Side walls From Ch. 1260.00m to Ch.1990.00m
Labour cost for dismantling of old CC canal lining and carriage of the materials and depositing the same in a safe distance as directed. (i) Carriage up to lead of 60 M and lift upto 9 M (For Major & Medium works)
River sand filling in plinth, canal bed, canal slopes, bases of structure, etc in layers not more than 150 mm thick including necessary carriage, watering etc, complete as directed as specified.
Labour for preparation of subgrade of lined canal section as per design drawing and grade by ramming and rolled to level and according to the required cross section of the typical lined canal including cutting, filling the existing canal section where necessary compacting the earth in layers in not more than 15 cm thick to form a firm compacted bed & side for lining including watering to obtain required moisture content where necessary etc, complete as directed. (ii) For sandy soil
Soling in foundation at all levels including filling intersides, ramming etc complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc.with hard broken stone aggregate of size 6 mm to 20 mm including curing with necessary timber shuttering, scaffolding where necessary complete as directed.(Shuttering, scaffolding cost will be paid separately) WITH HARD BROKEN STONE AGGREGATE 6 MM TO 20 MM
Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). (B)(i) Shuttering (Beam) without Prop.
Earthwork in filling in all soils in plinth, canal embankment and bed filling as per CuM Rs. 478.09 design section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same including light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50 % shrinkage allowance from the gross quantity).
Construction of Cattle Cart Crossing (at different Main canal and Branch canal chainage) 2 Nos
Earth work in excavation of foundation of canal structure in all types of soil as per design and drawing i/c dressing the foundation, shoring etc. removing the surplus soil by head load to a safe distance from the working place and depositing required spoils in uniform layers dressing, watering, breaking clods more than 10mm cube i/c paying land compensation etc. complete as directed at site (i/c bailing out stagnant rain water where necy.) (A) In all types of soils (except soil mixed with gravel and boulders) (ii) For lead upto 60 M and lift of 3 M
River sand filling in foundation /plinth in layers not more than 150 mm. thick including carriage loading unloading in measurable stacks and than spreading in bed, watering, ramming, screening etc. complete as directed.
Soling in foundation at all levels including filling intersides, ramming etc complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc.with hard broken stone aggregate of size 6 mm to 20 mm including curing with necessary timber shuttering, scaffolding where necessary complete as directed.(Shuttering, scaffolding cost will be paid separately)
RCC work in slab, abutment cap and above abutment, pier cap, pedestals, dirt wall etc. in proportion 1:1½:3 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing, dewatering etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). (A) Shuttering (Slab)
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
12 mm cement plastering including clearing surface and curing, complete as directed.(i) In proportion 1:3
Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Collection of sand gravel (40% sand and 60% gravel of size 25 mm to 60 mm) free from dust and dirt including stacking in measurable stacks at quarry site and making payment of forest royalty etc. as directed complete.
Labour charges for spreading hard river shingles / sand gravels to required thickness over approach subway etc. including ramming, dressing the seat before laying the materials lead upto 30 M and lift 1.50 M, complete as directed.
BIPUL MEDHI
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .