SE/MEDC/Mettur
O/o SE/MEDC/Mettur Dam
RDSS SCHEME -Agri feeder segregation of Existing 22 KV Vempadithalam feeder Work contract for laying of HT/LTOH lines Vaikundam Section East Sankari / subdivision in Sankari division
2022_EB_244106_1
SE/MEDC/RDSSWC/SpecNO 020/22-23
Open Tender
Electrical Works
Works
210 days
SE/MEDC/Mettur Dam
EMD and documents as per BQR condition
3 documents required · 3 mandatory
₹0
₹14,000
18 Aug 2022
27 Jul 2022
11 Aug 2022
27 Jul 2022
10 Aug 2022
27 Jul 2022
27 Jul 2022 - 10 Aug 2022
Amount
Work contract schedule
Excavation of pole pit upto 27' (8.0 m) Pole by using JCB or manual
Excavation of pole pit above 8.0 Mtr pole PSC/RCC/RSJ pole by using JCB or manual
Excavation of Stay pit 4.5' to 5' depth by using JCB or manual
Erection of PSC/ RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual
Erection of PSC/ RCC poles/Metal poles above 8.00m by using JCB or maual
Erection of stay set complete
Fixing of HT "V" cross arms (all types) / Channel cross arms/ Guarding Cross arms
Fixing of LT 3 phase cross arms
Fixing of HT/LT TI Fittings
Fixing of Aluminium Knob
Fixing of HT pin Insulators 22 KV
Fixing of HT 22 KV strain disc.
Fixing of LT pin Insulator
Fixing of LT shackle
Paving of ACSR 7/3.35mm / AAAC 3.15 mm Rabbit conductor
Paving of ACSR 7/2.59 mm / AAAC 2.50 mm weasel and ACSR 7/2.11 mm Conductor
Concreting of poles Sleeve concreting including materials (Cement + River Sand/ M sand and Blue metals and watering)
Stay Concreting including cost of materials and labour 375mmx375mmx50mm
Earthing of pole with coil earthing including burying looping and binding.
Painting of Numbering of pole with paint and with base painting.
Painting of RCC/PSC poles (Colour washing)
Transport of poles/Materials/ conductors and other materials (excluding loading and unloading charges.) Below 8 Kms (Plains)
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100 m
Loading of poles upto 8.0 M/ 27'
Loading of poles above 8.0 M
Unloading of poles
Loading of materials
Unloading of materials
Loading or unloading of Transformer upto 100 KVA
Erection of New Transformer all capacities (with jumpering)
Clearing of branches of trees
Erection of Single Pole Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting (Except erection of Transformer)
Erection of D.P. structure with AB switch, top channel, cross bracing, earthing, painting, providing stay including concreting
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @ 3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .