Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹76.9 LAccepted-AOC MANSA | SANGRUR | PUNJAB | 148024 | ₹76.9 L | 1 | Accepted-AOC lowest |
| 2 | 2₹78.3 LRejected-Finance BHUCHO | ₹78.3 L | 2 | Rejected-Finance highest |
| 3 | 3₹80.5 LRejected-Finance CHEEMA MAIN ROAD CHEEMA SANGRUR PUNJAB 148029 | SANGRUR | PUNJAB | 148029 | ₹80.5 L | 3 | Rejected-Finance highest |
| Sl No | Description | Qty | Unit | SURESH KUMAR CONTRACTOR L2 | SUNIT GARG CONTRACTOR L1 | SUKHPAL BANSAL CONTRACTOR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods Item No.6.2(a) of CSR 2020 | 692.64 | Cum | 70 ₹48,484.80 | 81 ₹56,103.84 | 81 ₹56,103.84 |
| 2.00 | Earth work undressed with combined lead upto 15mtr. including breaking of clods Item No.6.2(b) of CSR 2020 | 945.06 | Cum | 70 ₹66,154.20 | 114 ₹1.1 L | 114 ₹1.1 L |
| 3.00 | Dressing of new earth work Item No.6.3(i) of CSR 2020 | 6,132.27 | Sqm | 1 ₹6,132.27 | 1.3 ₹7,971.95 | 1.3 ₹7,971.95 |
| 4.00 | Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed. | 390.88 | Cum | 100 ₹39,088 | 147 ₹57,459.36 | 147 ₹57,459.36 |
| 5.00 | Re-handling of earthwork recently executed item No.6.2(a) of CSR 2020 note No.ii | 667.89 | Cum | 50 ₹33,394.50 | 64 ₹42,744.96 | 64 ₹42,744.96 |
| 6.00 | Dag belling single kassi stroke minimum 7.5 cm depth item No.6.18(a) | 10.29 | KM | 100 ₹1,029 | 848 ₹8,725.92 | 500 ₹5,145 |
| 7.00 | Dressing of bed and preparation of sub-grade for lining.Item No.19.1 of CSR 2020 | 4,777.99 | Sqm | 8 ₹38,223.92 | 11.35 ₹54,230.19 | 11 ₹52,557.89 |
| 8.00 | First class burnt brick laid in cement sand mortar 1:6 for bed and side wall [Item No 11.3(i)]. | 1,026.83 | Cum | 6,443 ₹66.2 L | 6,200 ₹63.7 L | 6,534 ₹67.1 L |
| 9.00 | 10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding. | 2,903.76 | Sqm | 178 ₹5.2 L | 175 ₹5.1 L | 182 ₹5.3 L |
| 10.00 | 10mm thick cement plaster 1:4 on bed and top. | 3,521.34 | Sqm | 139 ₹4.9 L | 136 ₹4.8 L | 141 ₹5.0 L |
Updated dates
Tender Value
₹75.9 L
EMD Value
₹1.5 L
Closing Date
19 Jan 2026, 9:00 amClosed
DivisionalEngineer SangurBarnalaPWRMDC Divi
DivisionalEngineer SangurBarnalaPWRMDC Division Barnala
Estimate for Re-Lining Lining of W C by Brick Lining of O L RD 121950 R of Barnala Disty of Village Barnala Distt.Barnala
2025_WR_156925_1
NIT13/2025
Open Tender
Civil Works
180 days
Barnala
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
₹1.5 L
DivisionalEngineer SangurBarnalaPWRMDC Divi
6 Feb 2026
31 Dec 2025
19 Jan 2026
31 Dec 2025
19 Jan 2026
31 Dec 2025
7 Jan 2026
Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods Item No.6.2(a) of CSR 2020
Earth work undressed with combined lead upto 15mtr. including breaking of clods Item No.6.2(b) of CSR 2020
Dressing of new earth work Item No.6.3(i) of CSR 2020
Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed.
Re-handling of earthwork recently executed item No.6.2(a) of CSR 2020 note No.ii
Dag belling single kassi stroke minimum 7.5 cm depth item No.6.18(a)
Dressing of bed and preparation of sub-grade for lining.Item No.19.1 of CSR 2020
First class burnt brick laid in cement sand mortar 1:6 for bed and side wall [Item No 11.3(i)].
10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding.
10mm thick cement plaster 1:4 on bed and top.
Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement (CSR Item No 10.13 (a) (i)
Fixing of frame ( Non scheduled item)
Supplying & Laying Dry Brick Bats. item No.10.29
Centreing & shuttering for Concerte faces
Dismantling of Brick work in Cement, CSR 2020 - item no- 8.5 (b)
NOTE:- Credit of old materials as per sanctioned estimate will be recovered from the bidder and it will be taken into the acccount while preparing the comparative statement of the work.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
Tendernotice_2.pdf
PDF • 0.05 MB
PKG1RD121950.xls
Tender Documents • 0.04 MB
BOQ_318139.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid