| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.2 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹49.0 L+₹2.8 L (6.11%)Rejected-Finance | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹49.4 L+₹3.2 L (6.90%)Rejected-Finance | L3 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | buta singh and sons L1 | BISHAN DASS L2 | VOHRA CONSTRUCTION CO L3 |
|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete of any description and in any position(above/below of ground level) not otherwise specifically provided as in sunken floor, plinth protection, roof kerb, foundation etc. all as specified and directed. | 31.2 | Cum | 200 ₹6,240 | 100 ₹3,120 Lowest | 577 ₹18,002.4 |
| 2.00 | M&L for waterproofing treatment to sunken floors with application of two components acrylic modified cementious coating with glass fabric sheet between coats (SIKA Top Seal-107 / Brush Bond FOSROC / Dr. Fixit / STP / CICO ) on dried surface free from containments such as dirt, dust, oil, surface treatments and old coatings. Concrete substrats must be prepared mechanically using abrasive blast cleaning or milling to remove cement laitance existing coating and achieve a gripping clean dry and free from laitance profile. The installation instructions of manufacturer should be followed strictly.
Note : (a) Chipping out any visible cracks must be clean and filled with SIKA latex SBR 100 Putty / Dr. Fixit 302 SBR latex / Perma latex SBR / FOSROC Nitbond SBR latex / Asain Paint latex in "V Groove" pattern and finally clean surface with powder grinder, wire brush hair brush & Vaccum pressure. (b) The waterproofing coating should be taken upto a height of 450mm above the FFL on vertical surfaces.
(c) Second coats shalll be applied after 6-8 hrs of application of previous coat and in the right angle direction.
(d) All traps in sunken slabs to be enclosed with PCC 1: 11/2 :3 (min 150mm) alround. | 300 | Sqm | 300 ₹90,000 Lowest | 840 ₹2,52,000 | 583 ₹1,74,900 |
| 3.00 | M&L plaster 15mm thick in cm 1:4 in sunken portion of slab using waterproofing compound all as specified and directed Note : Water proofing compound shall be measured and paid separately. | 300 | Sqm | 130 ₹39,000 Lowest | 200 ₹60,000 | 250 ₹75,000 |
| 4.00 | Supply only liquid water proofing compound. | 22.27 | Ltrs | 50 ₹1,113.5 Lowest | 90 ₹2,004.3 | 200 ₹4,454 |
| 5.00 | M&L for PCC 1:5:10 type E2 (using 40 mm graded crushed stone aggregarte) as in filling, foundation and mass concrete in sunken floor complete all as specified and directed. | 30 | Cum | 1,500 ₹45,000 Lowest | 1,800 ₹54,000 | 4,780 ₹1,43,400 |
| 6.00 | M&L for 25 mm thick cement concrete 1:2:4 type B-0 (using 12.5mm graded crushed stone aggregate) as in sub base for receiving the floor finishes complete all as specified and directed. | 210 | Sqm | 200 ₹42,000 | 160 ₹33,600 Lowest | 200 ₹42,000 |
| 7.00 | Roughing the surface of old concrete floor picking sweeping clean and washing down with water to remove dust/mud etc.and applying a coat of Nitobond SBR cement slurry (1 Vol of Nitobond SBR + 1 vol of Water + 3 vol of cement) water proofing coating on roof complete all as specified and directed. | 450 | Sqm | 200 ₹90,000 | 20 ₹9,000 Lowest | 131 ₹58,950 |
| 8.00 | M&L for PCC 1:2:4 type B-0 (using 12.5mm graded crushed stone aggregate) as in roof padding averaging thickness of 50 mm complete all as specified. | 450 | Sqm | 250 ₹1,12,500 | 198 ₹89,100 Lowest | 250 ₹1,12,500 |
| 9.00 | M&L APP based polymeric membrane minimum weighing 3 kg/ Sqm and minimum 3mm thick, reinforced with polyster non woven fabric (weight not less than 150 gms/ Sqm) laid on applying evenly a tack coat of industrial bitumen 85/25 at the rate of 1.2 kg per sq.m by forced application with butane torch over entire roof area with minimum overlaps of 100mm at the sides/ longitudnal edges of strips membrane and 150mm at the ends and sealed in after cleaning surface complete all as specified and directed and all as per manufacturer's instructions. | 450 | Sqm | 400 ₹1,80,000 | 340 ₹1,53,000 Lowest | 400 ₹1,80,000 |
| 10.00 | S&F prepartion of new surface and applying two coats of aluminum paint on above of APP membrane complete all as specified and directed. | 450 | Sqm | 50 ₹22,500 | 45 ₹20,250 Lowest | 77 ₹34,650 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
11 Oct 2025, 6:00 pmClosed
Garrison Engineer, Gurdaspur.
Garrison Engineer, Gurdaspur (Tibri)
Certain B/R repairs work to joinery, plumbing, flooring, sunken treatment etc of OTM Accn in Inf Bn V and VI under AGE B/R-I at GE Gurdaspur.
2025_MES_713748_4
GE GSR-48/2025-2026
Open Tender
Civil Works
Item Rate
180 days
Garison Engineer
As per Tender Documents
8 documents required · 8 mandatory
₹500
GE Gurdaspur
₹90,000
7 Nov 2025
19 Sept 2025
18 Oct 2025
19 Sept 2025
11 Oct 2025
27 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .