Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.8 LAccepted-Finance GATE NO 3 DIBRUGARH NEAR LANCO POWER PLANT ANPARA SONEBHADRA | ANPARA | SONEBHADRA | UTTAR PRADESH | ₹9.8 L | 1 | Accepted-Finance L1 BIDDER |
| 2 | 2₹13.2 LAccepted-Finance | ₹13.2 L | 2 | Accepted-Finance L2 BIDDER |
| 3 | 3₹14.5 LAccepted-Finance | ₹14.5 L | 3 | Accepted-Finance L3 BIDDER |
| Sl No | Description | Qty | Unit | M/S SHYAM ERECTORS L1 | BRITISH INDIA TRADING COMPANY L3 | M/S THERMAL INDIA L2 |
|---|---|---|---|---|---|---|
| 1.00 | Alignment and surface preparation of mono rail and electric hoist of APH of unit 6 and 7 , Capacity- 2 Ton | 2 | Job | 7,214 ₹14,428 Lowest | 11,512 ₹23,024 | 10,745 ₹21,490 |
| 2.00 | Alignment and surface preparation of mono rail and electric hoist of ESP of unit 6 and 7 , Capacity- 3 Ton | 2 | Job | 5,141 ₹10,282 Lowest | 8,204 ₹16,408 | 7,657 ₹15,314 |
| 3.00 | Alignment and surface preparation of mono rail and electric hoist of CC Pump of unit 6 and 7 , Capacity- 5 Ton | 2 | Job | 7,634 ₹15,268 Lowest | 12,183 ₹24,366 | 11,370 ₹22,740 |
| 4.00 | Alignment and surface preparation of mono rail and electric hoist of ECO/ LTSH of unit 6 and 7 , Capacity- 6 Ton | 2 | Job | 8,606 ₹17,212 Lowest | 13,733 ₹27,466 | 12,817 ₹25,634 |
| 5.00 | Alignment and surface preparation of mono rail and electric hoist of SCAPH of unit 6 and 7 , Capacity- 7.5 Ton | 2 | Job | 6,363 ₹12,726 Lowest | 10,153 ₹20,306 | 9,476 ₹18,952 |
| 6.00 | Breakdown maintenance or Servicing of Traverse motor gearbox assy. Of APH of unit 6 and 7 , Capacity- 2 Ton | 4 | Job | 4,261 ₹17,044 Lowest | 6,800 ₹27,200 | 6,346 ₹25,384 |
| 7.00 | Breakdown maintenance or Servicing of Traverse motor gearbox assy. Of ESP of unit 6 and 7 , Capacity- 3 Ton | 4 | Job | 3,734 ₹14,936 Lowest | 5,958 ₹23,832 | 5,561 ₹22,244 |
| 8.00 | Breakdown maintenance or Servicing of Traverse motor gearbox assy. Of CC Pump of unit 6 and 7 , Capacity- 5 Ton | 4 | Job | 4,284 ₹17,136 Lowest | 6,837 ₹27,348 | 6,381 ₹25,524 |
| 9.00 | Breakdown maintenance or Servicing of Traverse motor gearbox assy. Of ECO/ LTSH of unit 6 and 7 , Capacity- 6 Ton | 4 | Job | 4,284 ₹17,136 Lowest | 6,837 ₹27,348 | 6,381 ₹25,524 |
| 10.00 | Breakdown maintenance or Servicing of Traverse motor gearbox assy. Of SCAPH of unit 6 and 7 , Capacity- 7.5 Ton | 4 | Job | 4,284 ₹17,136 Lowest | 6,837 ₹27,348 | 6,381 ₹25,524 |
Tender Value
₹13.0 L
EMD Value
₹14,000
Closing Date
20 May 2026, 2:00 pmClosed
SUPERINTENDING ENGINEER OMC-II, DTPS
OFFICE OF THE SUPERINTENDING ENGINEER, O AND MC-II, DTPS, ANPARA SONBHADRA
Routine and Preventive Breakdown Maintenance of all Mech. parts of Mono-Rail Electric hoist along with the Sky climber of Boiler of unit no. 6 and 7, 2x500MW, DTPS, Anpara.
2026_RVUNL_1139028_1
T04-ANP/D/OMC2/BMD1
Open Tender
Power/Energy Projects/Products
Fixed-rate
730 days
Anpara
Tender cost and Earnest money
2 documents required · 2 mandatory
₹1,180
Dy. GM (F)Construction Unit,CFA and BO,DTPS,Anpara
₹14,000
13 Jun 2026
21 Apr 2026
21 May 2026
21 Apr 2026
20 May 2026
21 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Alignment and surface preparation of mono rail and electric hoist of APH of unit 6 and 7 , Capacity- 2 Ton | 2 | Job | - | - |
| 2 | Alignment and surface preparation of mono rail and electric hoist of ESP of unit 6 and 7 , Capacity- 3 Ton | 2 | Job | - | - |
| 3 | Alignment and surface preparation of mono rail and electric hoist of CC Pump of unit 6 and 7 , Capacity- 5 Ton | 2 | Job | - | - |
| 4 | Alignment and surface preparation of mono rail and electric hoist of ECO/ LTSH of unit 6 and 7 , Capacity- 6 Ton | 2 | Job | - | - |
| 5 | Alignment and surface preparation of mono rail and electric hoist of SCAPH of unit 6 and 7 , Capacity- 7.5 Ton | 2 | Job | - | - |
| 6 | Breakdown maintenance or Servicing of Traverse motor gearbox assy. Of APH of unit 6 and 7 , Capacity- 2 Ton | 4 | Job | - | - |
| 7 | Breakdown maintenance or Servicing of Traverse motor gearbox assy. Of ESP of unit 6 and 7 , Capacity- 3 Ton | 4 | Job | - | - |
| 8 | Breakdown maintenance or Servicing of Traverse motor gearbox assy. Of CC Pump of unit 6 and 7 , Capacity- 5 Ton | 4 | Job | - | - |
| 9 | Breakdown maintenance or Servicing of Traverse motor gearbox assy. Of ECO/ LTSH of unit 6 and 7 , Capacity- 6 Ton | 4 | Job | - | - |
| 10 | Breakdown maintenance or Servicing of Traverse motor gearbox assy. Of SCAPH of unit 6 and 7 , Capacity- 7.5 Ton | 4 | Job | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
tdoc.pdf
Tender Documents • 4.78 MB
BOQ_2126689.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].