| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 CrAccepted-Finance | ₹11.0 Cr | L1 | Accepted-Finance ok |
| 2 | L2₹11.8 CrRejected-Finance | ₹11.8 Cr | L2 | Rejected-Finance reject |
| 3 | L3₹12.8 CrRejected-Finance KHALINI DISTT SHIMLA | SHIMLA | SHIMLA | HIMACHAL PRADESH | ₹12.8 Cr | L3 | Rejected-Finance reject |
| 4 | L4₹14.1 CrRejected-Finance BANSAL COTTAGE BADRI NAGAR TEH PAONTA SAO SIRMAUR HIMACHAL PRADESH 17302 | 17302 | ₹14.1 Cr | L4 | Rejected-Finance reject |
Updated dates
Tender Value
₹13.8 Cr
EMD Value
₹23.8 L
Closing Date
18 Apr 2026, 4:30 pmClosed
Executive Engineer HPPWD Shimla Division No. III
E.E. Shimla DIVISION NO. III, HPPWD, Shimla-3
Special repairs to Himachal Sadan at New Delhi. SH Retrofitting works, flooring, finishing works, WS SI and underground water tank etc..
2026_PWD_134053_1
SD-III-614-29dt.10-04-2026
Open Tender
Civil Works - Buildings
180 days
Himachal Sadan
As per SBD
14 documents required · 14 mandatory
₹20,000
₹23.8 L
22 Apr 2026
10 Apr 2026
18 Apr 2026
10 Apr 2026
18 Apr 2026
10 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means with desired levels or foundation trenches or drains or for pipes and cables in earth work in all heights and depth in all kinds of soils, including saturated soil comprising of pick work, jumper work, and blasting work both in soft and hard rock with chiselling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting out to required lines, levels as shown on the drawing and as directed by the Engineer -in-Charge including backfilling of available excavated earth that stacked at site in all leads and lift, wherever required at site as per direction of Engineer-in-charge and sorting out useful and un- useful material and transportation of the un -useful material for disposing at approved dumping site or otherwise and including payment of prescribed charges of dumping to the owner of dumping site (to be arranged by the contractor) for the satisfaction of Engineer- in -Charge through all modes of transportation including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and other incidentals necessary to complete the work by mechanical means and labour (if required). All useful material such as stones shall be properly stacked at site as per direction of Engineer-in-Charge to the maximum possible extent and to be handed over to the department. Any loss to the public and private properity during the course of execution and disposal of servicable and unservicable materials shall be the absolute responsiblity of the contractor and shall have to be duly compensated by him in all respects to the satisfaction of Engineer in Charge.(Item includes disposal and backfilling in all leads and lift.) | 4,976.34 | Per Cubic metre | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Disposal of surplus excavated earth / building rubbish / malba / similar unserviceable, dismantled or waste materials by Mechanical or any other means with in all leads on approved dumping site of M.C. Shimla or otherwise including payment of prescribed charges of dumping to the owener of dumping site through all mode of transportation including head load animal load or mechanical means alongwith its leveling and to complete the work of mechanized means and labour(if any required). The dumping site to be arranged by the contractor entirely at his own risk and cost. All useful materials such as stones, aggregate and slates shall be sorted out and stacked along roads side any loss of the public/private property during the course of diisposal shall be the absolute responsibility of the contractor which shall have to be dully compensated by him in all respect as per direction of Engineer-in-Charge. | 497.64 | Per Cubic metre | - | - | BI01010001010000000000000515BI0100001114 |
| 3 | Supplying and filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete including carriage of materials in all leads and lift as per direction of Engineer in Charge. | 194.22 | Per Cubic metre | - | - | BI01010001010000000000000515BI0100001115 |
| 4 | Providing & Filling in plinth with hard stone under floors, including watering, ramming, consolidating and dressing complete including carriage of material within all leads, lifts and other incidentals. | 167.22 | Per Cubic metre | - | - | BI01010001010000000000000515BI0100001116 |
| 5 | Providing and filling with stone boulder behind retaining walls of selected hard stone complete including carriage of material within all leads, lifts and other incidentals. | 183.06 | Per Cubic metre | - | - | BI01010001010000000000000515BI0100001117 |
| 6 | Dismantling and Demolishing :- Demolition of brick work In cement mortar above G.L. upto floor two level including stacking of serviceable materials and disposal of un-serviceable materials within all leads and lifts. | 603.51 | Per Cubic metre | - | - | BI01010001010000000000000515BI0100001118 |
| 7 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 45.76 | Per Cubic metre | - | - | BI01010001010000000000000515BI0100001119 |
| 8 | Demolishing Nominal cement concrete 1:3:6 or richer mix (i/c equivalent design mix) manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in charge. | 206.66 | Per Cubic metre | - | - | BI01010001010000000000000515BI0100001120 |
| 9 | Dismantling dressed stone work ashlar face stone work In cement mortar, marble work or precast concrete work manually/ by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : | 218.66 | Per Cubic metre | - | - | BI01010001010000000000000515BI0100001121 |
| 10 | Removing mortar from and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured): In cement mortar | 218.66 | Per Cubic metre | - | - | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.46 MB
SBD137802563.pdf
Tender Documents • 12.39 MB
BOQ_198233.xls
BOQ • 0.58 MB
AdditionalConditionsAnnexure-A.pdf
Additional Documents • 0.11 MB
RateDelhiAnnexure-B.pdf
Additional Documents • 0.73 MB